2023 Water Main Replacement Project 4
| Agency: | San Antonio Water System |
|---|---|
| State: | Federal |
| Type of Government: | State & Local |
| NAICS Category: |
|
| Posted Date: | Mar 6, 2026 |
| Due Date: | Apr 27, 2026 |
| Solicitation No: | MM |
| Original Source: | Please Login to View Page |
| Contact information: | Please Login to View Page |
| Bid Documents: | Please Login to View Page |
Description
2023 Water Main Replacement Project 4 -2 sites(E Hildebrand & Camden & Euclid)
When Will Work Occur?
Expecting to Advertise in
April 27, 2026
March 31, 2026
and Construction is currently scheduled to begin in
3rd Quarter 2026
mid-2026
. It will be procured by Request for Competitive Sealed Proposal method.
The estimated construction duration is 14 months and the estimated construction cost is $10.2 million.
E Hildebrand Site
This project site will install approximately 13,300 feet of 8, 10, 12, 16, and 20-inch water main at three sites. One along Camden Street from the intersection with Seymour Street to N St. Mary’s Street. Another along E Euclid Ave from the intersection with N Main Ave to a point approximately 200 feet east of the intersection with McCullough Ave. And another along Hildebrand Ave and Old Hildebrand Ave from the intersection with McCullough Ave to Devine Road. This project is part of ongoing efforts to replace deteriorating water mains that have a history of multiple failures and a high probability of failure.
What to Expect – E Hildebrand Site
- Open cut installation of approximately 4,500LF of HDPE water main up to 20-inch in diameter at depths of 5 to 10 ft.
- Trenchless installation of approximately 40LF of water main up to 20-inch in diameter at depths up to 10 feet.
- Installation and tie-ins/shutdowns will require close coordination with the operators of the SAWS Hildebrand Water Supply Tank.
- Installation and tie-ins/shutdowns will require close coordination with Trinity University and businesses and residents in the project area.
Camden & Euclid Sites
These project sites will install approximately 13,300 feet of 8, 10, 12, 16, and 20-inch water main at three sites. One along Camden Street from the intersection with Seymour Street to N St. Mary’s Street. Another along E Euclid Ave from the intersection with N Main Ave to a point approximately 200 feet east of the intersection with McCullough Ave. And another along Hildebrand Ave and Old Hildebrand Ave from the intersection with McCullough Ave to Devine Road. This project is part of ongoing efforts to replace deteriorating water mains that have a history of multiple failures and a high probability of failure.
What to Expect – Camden & Euclid Sites
- Open cut installation of approximately 8,700LF of HDPE water main up to 12-inch in diameter at depths up to 16 feet.
- Trenchless installation of approximately 160LF of water main up to 12-inch in diameter at depths up to 16 feet.
- Installation and tie-ins/shutdowns will require close coordination with the Baptist Hospital and other medical service providers in the project area.
- Installation and tie-ins/shutdowns will require close coordination with businesses and residents in the project area
SAWS Contract Administration Point of Contact:
Mory Martinez, Contract Administrator
Email:
Morayma.Martinez@saws.org
210-233-2451
View plan holders list.
Not logged in
|
Other
Feb. 26, 2026 |
|
Questions? Please contact
Morayma Martinez
at 210-233-2451 |
Receive Email Updates
|
Registration Agreement
Attachment Preview
See Also
Request for Qualifications for Design Services for the Dillon Road Bridge Replacement and
American Planning Association
Due by 10/12/2026
Follow 657A4-26-125 Conduct Roof Deck Assessment Building 8 ME FY27 NRM Active Contract
VETERANS AFFAIRS, DEPARTMENT OF
Due by 9/23/2026
Follow $625M USACE SPD Vertical AE Design MATOC Active Contract Opportunity Notice ID
DEPT OF DEFENSE
Due by 10/12/2026
Follow Project FLYTRAP 6.0 Active Contract Opportunity Notice ID WHSDIUFLYTRAP Related Notice Department/Ind.
DEPT OF DEFENSE
Due by 10/16/2026