| Agency: | San Antonio Water System |
|---|---|
| State: | Federal |
| Type of Government: | State & Local |
| NAICS Category: |
|
| Posted Date: | Oct 29, 2025 |
| Due Date: | Dec 31, 2025 |
| Solicitation No: | MM |
| Original Source: | Please Login to View Page |
| Contact information: | Please Login to View Page |
| Bid Documents: | Please Login to View Page |
Expecting to Advertise December 15, 2025, and Construction is currently scheduled to begin in mid-2026.
It will be procured by Invitation for Bid method.
The estimated construction cost is $1.9 million.
Site 1 - Nottingham Dr and Tophill Rd from Bartell Dr to Greenwich Blvd.
About the Project
This package has four site locations. Project site one will install approximately 881 feet of 8-inch HDPE water mains by pipebursting, and 10 feet by open trench construction methods. Project site one includes an alley between Nottingham Dr and Tophill Rd from Bartell Dr to Greenwich Blvd. Water Main Replacement Project 5, which was approved in 2025, is part of ongoing efforts to replace deteriorating water mains that have a history of failures.
Site 2 - Northridge Dr and Larkwood Dr from Crandall Pl to Kenilworth Blvd.
About the Project
This package has four site locations. Project site two will install approximately 580 feet of 8-inch HDPE water mains by pipebursting, and 186 feet by open trench construction methods. Project site two includes an alley between Northridge Dr and Larkwood Dr from Crandall Pl to Kenilworth Blvd. Water Main Replacement Project 5, which was approved in 2025, is part of ongoing efforts to replace deteriorating water mains that have a history of failures.
Site 3 - Shadylane from E Terra Alta to Forest Glen
About the Project
This package has four site locations. Project site three will install approximately 997 feet of 8-inch HDPE water mains by open trench construction methods. Project site three includes Shadylane from E Terra Alta to Forest Glen. Water Main Replacement Project 5, which was approved in 2025, is part of ongoing efforts to replace deteriorating water mains that have a history of failures.
Site 4 - Larchmont Dr and Irvington Dr from Greenwich Blvd to Kenilworth Blvd
About the Project
This package has four site locations. Project site three will install approximately 951 feet of 8-inch HDPE water mains by pipebursting methods. Project site four includes an alley between Larchmont Dr and Irvington Dr from Greenwich Blvd to Kenilworth Blvd. Water Main Replacement Project 5, which was approved in 2025, is part of ongoing efforts to replace deteriorating water mains that have a history of failures.
|
Upcoming Project Factsheet Oct. 24, 2025 |
|
Questions? Please contact
Mory Martinez
at 210-233-2451 |
Receive Email Updates
|
Registration Agreement
With Free Trial, you can:
You will have a full access to bids, website, and receive daily bid report via email and web.
2023 Water Main Replacement Project 4 Solicitation No. CO-00907-RL Status: Currently Accepting Submissions
San Antonio Water System
Bid Due: 6/16/2026
2023 Water Main Replacement Project 4 Solicitation No. CO-00907-RL Status: Currently Accepting Submissions
San Antonio Water System
Bid Due: 6/12/2026
Follow Z1DA--Replace Electrical Primary Distribution 515-15-117 Active Contract Opportunity Notice ID 36C25025B0047 Related
VETERANS AFFAIRS, DEPARTMENT OF
Bid Due: 6/18/2026
Site Improvements at the C.A. Fredd Campus for Shelton State Community College (SSCC)
Goodwyn Mills Cawood(GMC)
Bid Due: 6/11/2026