2025 Water Main Replacement Project 5

Agency: San Antonio Water System
State: Federal
Type of Government: State & Local
NAICS Category:
  • 237110 - Water and Sewer Line and Related Structures Construction
Posted Date: Oct 29, 2025
Due Date: Dec 31, 2025
Solicitation No: MM
Original Source: Please Login to View Page
Contact information: Please Login to View Page
Bid Documents: Please Login to View Page
2025 Water Main Replacement Project 5

Expecting to Advertise December 15, 2025, and Construction is currently scheduled to begin in mid-2026.

It will be procured by Invitation for Bid method.

The estimated construction cost is $1.9 million.

Site 1 - Nottingham Dr and Tophill Rd from Bartell Dr to Greenwich Blvd.

About the Project

This package has four site locations. Project site one will install approximately 881 feet of 8-inch HDPE water mains by pipebursting, and 10 feet by open trench construction methods. Project site one includes an alley between Nottingham Dr and Tophill Rd from Bartell Dr to Greenwich Blvd. Water Main Replacement Project 5, which was approved in 2025, is part of ongoing efforts to replace deteriorating water mains that have a history of failures.

Site 2 - Northridge Dr and Larkwood Dr from Crandall Pl to Kenilworth Blvd.

About the Project

This package has four site locations. Project site two will install approximately 580 feet of 8-inch HDPE water mains by pipebursting, and 186 feet by open trench construction methods. Project site two includes an alley between Northridge Dr and Larkwood Dr from Crandall Pl to Kenilworth Blvd. Water Main Replacement Project 5, which was approved in 2025, is part of ongoing efforts to replace deteriorating water mains that have a history of failures.

Site 3 - Shadylane from E Terra Alta to Forest Glen

About the Project

This package has four site locations. Project site three will install approximately 997 feet of 8-inch HDPE water mains by open trench construction methods. Project site three includes Shadylane from E Terra Alta to Forest Glen. Water Main Replacement Project 5, which was approved in 2025, is part of ongoing efforts to replace deteriorating water mains that have a history of failures.

Site 4 - Larchmont Dr and Irvington Dr from Greenwich Blvd to Kenilworth Blvd

About the Project

This package has four site locations. Project site three will install approximately 951 feet of 8-inch HDPE water mains by pipebursting methods. Project site four includes an alley between Larchmont Dr and Irvington Dr from Greenwich Blvd to Kenilworth Blvd. Water Main Replacement Project 5, which was approved in 2025, is part of ongoing efforts to replace deteriorating water mains that have a history of failures.

Notify Me


Receive updates sent straight to your inbox.
Subscribe
Plan Holders List
View plan holders list.
None
Downloads

Not logged in

Upcoming Project Factsheet


Oct. 24, 2025



Questions? Please contact

Mory Martinez

at 210-233-2451 |

Receive Email Updates |
Registration Agreement

Attachment Preview

Capital Improvement Project Summary:
2025 Water Main Replacement Project 5
About the Project
This package has four site locations. Project site one will install approximately 881 feet of 8-inch HDPE water mains
by pipebursting, and 10 feet by open trench construction methods. Project site one includes an alley between
Nottingham Dr and Tophill Rd from Bartell Dr to Greenwich Blvd. Water Main Replacement Project 5, which was
approved in 2025, is part of ongoing efforts to replace deteriorating water mains that have a history of failures.
When Will Work Occur?
Construction is scheduled to begin in the 1st quarter of 2026 with different starting and ending dates per segment
that will be updated as construction proceeds. The total construction duration for the entire “2025 Water Main
Replacement Project 5” package is approximately 10 months with an estimated total construction cost of $1.9
million.
What to Expect Project Site One
Open cut installation of approximately 10 linear feet of 8-inch diameter HDPE water main up to depths of
approximately 5 to 10 ft.
Trenchless installation of approximately 881 linear feet 8-inch diameter HDPE water main at depths up to
approximately 15 feet.
Installation and tie-ins/shutdowns will require coordination with the residents and in the project area.
For more information:
Mory Martinez
SAWS Contracting
210-233-2451
Morayma.Martinez@saws.org
2800 U.S. Hwy. 281 North
San Antonio, TX 78212
210-704-SAWS (7297) saws.org
Capital Improvement Project Summary:
2025 Water Main Replacement Project 5
About the Project
This package has four site locations. Project site two will install approximately 580 feet of 8-inch HDPE water mains
by pipebursting, and 186 feet by open trench construction methods. Project site two includes an alley between
Northridge Dr and Larkwood Dr from Crandall Pl to Kenilworth Blvd. Water Main Replacement Project 5, which
was approved in 2025, is part of ongoing efforts to replace deteriorating water mains that have a history of
failures.
When Will Work Occur?
Construction is scheduled to begin in the 1st quarter of 2026 with different starting and ending dates per segment
that will be updated as construction proceeds. The total construction duration for the entire “2025 Water Main
Replacement Project 5” package is approximately 10 months with an estimated total construction cost of $1.9
million.
What to Expect Project Site Two
Open cut installation of approximately 186 linear feet of 8-inch diameter HDPE water main up to depths of
approximately 5 to 10 ft.
Trenchless installation of approximately 580 linear feet 8-inch diameter HDPE water main at depths up to
approximately 15 feet.
Installation and tie-ins/shutdowns will require coordination with the residents and in the project area.
For more information:
Mory Martinez
SAWS Contracting
210-233-2451
Morayma.Martinez@saws.org
2800 U.S. Hwy. 281 North
San Antonio, TX 78212
210-704-SAWS (7297) saws.org
Capital Improvement Project Summary:
2025 Water Main Replacement Project 5
About the Project
This package has four site locations. Project site three will install approximately 997 feet of 8-inch HDPE water
mains by open trench construction methods. Project site three includes Shadylane from E Terra Alta to Forest
Glen. Water Main Replacement Project 5, which was approved in 2025, is part of ongoing efforts to replace
deteriorating water mains that have a history of failures.
When Will Work Occur?
Construction is scheduled to begin in the 1st quarter of 2026 with different starting and ending dates per segment
that will be updated as construction proceeds. The total construction duration for the entire “2025 Water Main
Replacement Project 5” package is approximately 10 months with an estimated total construction cost of $1.9
million.
What to Expect Project Site Three
Open cut installation of approximately 997 linear feet of 8-inch diameter HDPE water main up to depths of
approximately 5 to 10 ft.
Installation and tie-ins/shutdowns will require coordination with the residents and in the project area.
For more information:
Mory Martinez
SAWS Contracting
210-233-2451
Morayma.Martinez@saws.org
2800 U.S. Hwy. 281 North
San Antonio, TX 78212
210-704-SAWS (7297) saws.org
Capital Improvement Project Summary:
2025 Water Main Replacement Project 5
About the Project
This package has four site locations. Project site four will install approximately 951 feet of 8-inch HDPE water
mains by pipebursting methods. Project site four includes an alley between Larchmont Dr and Irvington Dr from
Greenwich Blvd to Kenilworth Blvd. Water Main Replacement Project 5, which was approved in 2025, is part of
ongoing efforts to replace deteriorating water mains that have a history of failures.
When Will Work Occur?
Construction is scheduled to begin in the 1st quarter of 2026 with different starting and ending dates per segment
that will be updated as construction proceeds. The total construction duration for the entire “2025 Water Main
Replacement Project 5” package is approximately 10 months with an estimated total construction cost of $1.9
million.
What to Expect Project Site Four
Trenchless installation of approximately 951 linear feet 8-inch diameter HDPE water main at depths up to
approximately 15 feet.
Installation and tie-ins/shutdowns will require coordination with the residents and in the project area.
For more information:
Mory Martinez
SAWS Contracting
210-233-2451
Morayma.Martinez@saws.org
2800 U.S. Hwy. 281 North
San Antonio, TX 78212
210-704-SAWS (7297) saws.org
This page summarizes the opportunity, including an overview and a preview of the attached documents.
* Disclaimer: This website provides information about bids, requests for proposals (RFPs), or requests for qualifications (RFQs) for convenience only and does not serve as an official public notice. Individuals who wish to respond to or inquire about bids, RFPs, or RFQs should contact the relevant government department directly.

Sign-up for a Free Trial, Government Bid Alerts

With Free Trial, you can:

You will have a full access to bids, website, and receive daily bid report via email and web.

Try One Week FREE Now

See Also

2023 Water Main Replacement Project 4 Solicitation No. CO-00907-RL Status: Currently Accepting Submissions

San Antonio Water System

Bid Due: 6/16/2026

2023 Water Main Replacement Project 4 Solicitation No. CO-00907-RL Status: Currently Accepting Submissions

San Antonio Water System

Bid Due: 6/12/2026

Follow Z1DA--Replace Electrical Primary Distribution 515-15-117 Active Contract Opportunity Notice ID 36C25025B0047 Related

VETERANS AFFAIRS, DEPARTMENT OF

Bid Due: 6/18/2026

Site Improvements at the C.A. Fredd Campus for Shelton State Community College (SSCC)

Goodwyn Mills Cawood(GMC)

Bid Due: 6/11/2026