| Agency: | San Antonio Water System |
|---|---|
| State: | Federal |
| Type of Government: | State & Local |
| NAICS Category: |
|
| Posted Date: | Apr 18, 2025 |
| Due Date: | May 16, 2025 |
| Solicitation No: | PS-00183-JP |
| Original Source: | Please Login to View Page |
| Contact information: | Please Login to View Page |
| Bid Documents: | Please Login to View Page |
2025 WATER MAIN REPLACEMENT DESIGN SERVICES
SOLICITATION NO: PS-00183
The San Antonio Water System (SAWS) is pursuing professional engineering design services and accepting Statements of Qualifications (SOQ) in connection with the 2025 Water Main Replacement Design Services Contract, which will include the replacement of small water main pipelines for unspecified projects which will require a Scope of Services to be performed by a qualified consultant(s) on a work order basis.
It is anticipated that SAWS will select multiple firms for multiple unspecified contracts totaling $9 million, as a result of this Request for Qualifications (RFQ). Contracts are anticipated to be assigned 7 to 12 sites each, totaling from 7,000 to over 10,000 LF per contract. Sites selected represent the Priority 1 sites needed to support SAWS’ Water Stewardship Initiative to manage main break levels. All mains are small diameter with the majority of the mains being 6-8 inch AC, PVC or Cast Iron.
Estimated Timeline
April 18, 2025....................................................................................................................... RFQ Released
April 30, 2025 at 2:00 p.m. (CDT)................................................ Non-Mandatory Pre-Submittal Conference
May 1, 2025 by 4:00 p.m. (CDT)................................................................ Receipt of Written Questions Due
May 8, 2025 by 5:00 p.m. (CDT)............................................................................ Q & A Posted to Website
May 16, 2025 by 10:00 a.m. (CDT)........................................................................................ Proposals Due
May/June 2025............................................................................................................ Proposals Evaluated
June 2025............................................................................................................... Interviews, if necessary
August 5, 2025................................................................................. SAWS Board Consideration and Award
August 2025................................................................................................... Non-Selection Notices mailed
August 2025............................................................................................................................... Start Work
|
Full RFQ Proposal
Note: You will be prompted to login to access the full proposal document. |
|
Questions? Please contact
Janie Powell
at 210-233-2443
|
Receive Email Updates
|
Registration Agreement
With Free Trial, you can:
You will have a full access to bids, website, and receive daily bid report via email and web.
2023 Water Main Replacement Project 4 Solicitation No. CO-00907-RL Status: Currently Accepting Submissions
San Antonio Water System
Bid Due: 6/16/2026
2023 Water Main Replacement Project 4 Solicitation No. CO-00907-RL Status: Currently Accepting Submissions
San Antonio Water System
Bid Due: 6/12/2026
Follow Z1DA--Replace Electrical Primary Distribution 515-15-117 Active Contract Opportunity Notice ID 36C25025B0047 Related
VETERANS AFFAIRS, DEPARTMENT OF
Bid Due: 6/18/2026
Site Improvements at the C.A. Fredd Campus for Shelton State Community College (SSCC)
Goodwyn Mills Cawood(GMC)
Bid Due: 6/11/2026