WASTEWATER TREATMENT PLANTSECONDARY CLARIFIER REPAIRS

Agency: City of Manchester
State: New Hampshire
Type of Government: State & Local
NAICS Category:
  • 221320 - Sewage Treatment Facilities
  • 237110 - Water and Sewer Line and Related Structures Construction
Posted Date: Mar 13, 2026
Due Date: Apr 9, 2026
Solicitation No: FY26-270-39
Original Source: Please Login to View Page
Contact information: Please Login to View Page
Bid Documents: Please Login to View Page
Bid # Description Download PDF Bid Opening Addenda Results
FY26-270-39

EPD: General Contractor Qualification Statements

Questions: Underwood Engineers, Inc. Steve Smith : 603-230-9898 or via email: ssmith@underwoodengineers.com

RFQ

Form

Qualifications Due: April 9, 2026 by 4:00 PM to Underwood Engineers

Attachment Preview

Timothy J. Clougherty
Public Works Director
Owen P. Friend-Gray, P.E.
Deputy Public Works Director
Robert J. Robinson, P.E.
Chief Sanitation Engineer
CITY OF MANCHESTER
Department of Public Works
Environmental Protection Division
Commission
Kathleen Sullivan, Chair
Arthur Gatzoulis, Co-Chair
Mark MacKenzie
Amber Nicole Cannan
Andre Parent
INVITATION FOR PREQUALIFICATION OF GENERAL CONTRACTORS
WASTEWATER TREATMENT PLANT
SECONDARY CLARIFIER REPAIRS
The City of Manchester owns and operates a wastewater treatment plant (WWTP) that is a 34 MGD
activated sludge process. The WWTP treats an average of 24 million gallons per day and was originally
constructed in 1976 with major upgrades in 1993 and 2016. The WWTP has three (3) secondary clarifiers.
Two of the clarifiers are original equipment from 1976 and the third is from a large facility upgrade in
1991. All three secondary clarifiers were upgraded in 2010. The clarifiers, after 16 years in service, have
experienced failures of the carbon steel fasteners, hardware and structural members that need replacement.
The Clarifier #2 48-inch influent slide gate has failed and cannot be operated and needs to be replaced. The
other two influent clarifier gates will also be replaced under this project. Also, the secondary clarifier 48-
inch crossover pipe has no means of isolation and the City wishes for new fabricated steel plates to be
installed at either end to block the pipe off. All of the work associated with the slide gate replacements and
blocking off the crossover pipe will require significant bypass pumping effort to maintain continuous flow
through the plant. Lastly the City also requires the plant water system isolation 14-inch plug valves to be
replaced. The estimated construction cost of this work is $2.75 million and construction duration is 300
calendar days.
PREQUALIFICATION
General contractors with extensive experience in wastewater and/or water treatment projects of a similar
size and scope are invited to submit prequalification packages for bidding on the City of Manchester’s
Wastewater Treatment Plant Secondary Clarifier Repairs Project. Questions should be directed to the
City’s engineer Underwood Engineers, Inc. care of Steve Smith at (603) 230-9898 or
ssmith@underwoodengineers.com. Sealed Prequalification Statements will be received at the Underwood
Engineers Concord office until 4:00 PM EST on Thursday, April 9, 2026. Prequalification statements
shall be addressed as follows: Prequalification Statement, Attn: Steve Smith, Underwood Engineers, Inc.,
99 North State Street, Concord, New Hampshire 03301.
ONLY PREQUALIFIED FIRMS WILL BE ALLOWED TO BID. Project will bid in April 2026 with a
bid opening in May 2026, and a Notice to Proceed issued for work to begin in August 2026. The right is
reserved to waive any informalities in or reject any or all prequalifying Contractors and to accept
prequalified Contractors that are deemed most favorable to the interest of the City of Manchester.
City of Manchester, NH
Department of Public Works
Environmental Protection Division
300 Winston Street, Manchester, NH 03103
(603) 624-6341
300 Winston Street • Manchester, New Hampshire 03103 • (603) 624-6595 • FAX: (603) 628-6234
E-mail: EPD@manchesternh.gov • Website: www.manchesternh.gov
This page summarizes the opportunity, including an overview and a preview of the attached documents.
* Disclaimer: This website provides information about bids, requests for proposals (RFPs), or requests for qualifications (RFQs) for convenience only and does not serve as an official public notice. Individuals who wish to respond to or inquire about bids, RFPs, or RFQs should contact the relevant government department directly.

Sign-up for a Free Trial, Government Bid Alerts

With Free Trial, you can:

You will have a full access to bids, website, and receive daily bid report via email and web.

Try One Week FREE Now

See Also

Bid # Description Download PDF Bid Opening Addenda Results FY26-804-64 Water Works: Generators

City of Manchester

Bid Due: 6/25/2026

Bid Number: IFB0285-072126 Bid Title: WWTF Phase I Upgrade Project Category: City Status:

City of Nashua

Bid Due: 7/21/2026

UNH Law - 2 White Street Roof Replacement USNH, representing University of New

University of New Hampshire

Bid Due: 6/23/2026

Description Opening Date Closing Date ADDENDUM No. 1 - Stevens Park Projects June

Town of Stratham

Bid Due: 6/26/2026