60" WASTEWATER REHABILITATION FROM TRINITY RIVER TO ROCHESTER SWPS

Agency: City of Dallas
State: Texas
Type of Government: State & Local
NAICS Category:
  • 237990 - Other Heavy and Civil Engineering Construction
Posted Date: May 7, 2026
Due Date: Jun 5, 2026
Solicitation No: CIZ-DWU-26 040
Original Source: Please Login to View Page
Contact information: Please Login to View Page
Bid Documents: Please Login to View Page

Description

Project: 60" WASTEWATER REHABILITATION FROM TRINITY RIVER TO ROCHESTER SWPS
Ref. #: CIZ-DWU-26 040
Type: CSP
Status:
Open
Open Date: May 7th 2026, 9:00 AM CDT
Questions Due Date: May 28th 2026, 4:00 PM CDT
Contact Information: Patricia Davis, patricia.davis@dallas.gov
Close Date: Jun 5th 2026, 1:00 PM CDT

Project Description: The project involves the trenchless rehabilitation of a total of approximately 5,150 linear feet (LF) of a circa 1950’s 60” RCP gravity wastewater pipe, the replacement of existing manhole structures, reconstruction of existing manhole structures and the rehabilitation of existing manhole structures. All existing manhole structures are steel reinforced concrete.
The project involves rehabilitation of approximately 4,790 LF by Machine Spiral Wound Liner (MSWL) and approximately 360 LF of CIPP followed by HDPE slip lining for the portion of the pipeline crossing the Trinity River. A section of the pipeline crossing the Trinity River is exposed to river flow. Flow control to complete the rehabilitation will include the coordinated diversion of flow using the upstream DWU Sunbeam Diversion Structure. Pipeline rehabilitation work is to proceed in accordance with the Flow Control Provisions found in the Contract Drawings.
The pipeline rehabilitation extents are from the west side of the East Branch of the Trinity River east to near the existing Rochester Stormwater Pump Station (SWPS) located near William Blair Jr. Park in South Dallas. A portion of the pipeline parallels and crosses an Oncor High Voltage Transmission Tower ROW and crosses both an active UPRR ROW and TXDOT ROW.
The entire pipeline alignment is in the FEMA Regulatory Floodway and the area will be subject to flooding. Additionally, portions of the existing pipeline and/or project area are in United States Army Corps of Engineers (USACE) Lamar Levee Extension Project Area and portions parallel the Rochester Levee both of which are subject to USACE jurisdiction. Project Manager: Joe Felipe, P.E.
Final Specifications, Drawings, Bid Proposal Spreadsheet, and any procurement documents will be uploaded to Bonfire no later than Friday, May 8, 2026.


Get Government Bids Like This by Email Receive daily bid alerts that match your keywords, business categories, and target regions.

See Also

Animal Feed, Vitamins, and Supplements Follow Solicitation Solicitation ID: 304T-27-325M2.2 Status: Posted Contact

State Government of Texas

Due by 9/24/2026

CONTRACT sTATUS Number Description Opening Date Opening Time Tab Sheet Open to Receive

City of Carrollton

Due by

12 MO SVC AGREEMENT AVID REPAIR AND MTNCE CONTACT: TURNER, BEVERLY (214-749-2670) ISSUED:

Dallas Area Rapid Transit

Due by 10/07/2048

Native Prairie Seeds Follow Solicitation Solicitation ID: 802-27-77954-R Status: Posted Contact Name: Vanessa

State Government of Texas

Due by 9/15/2026

* Disclaimer: This website provides information about bids, requests for proposals (RFPs), or requests for qualifications (RFQs) for convenience only and does not serve as an official public notice. Individuals who wish to respond to or inquire about bids, RFPs, or RFQs should contact the relevant government department directly.