| Agency: | City of pueblo |
|---|---|
| State: | Colorado |
| Type of Government: | State & Local |
| NAICS Category: |
|
| Posted Date: | Jun 23, 2026 |
| Due Date: | Jul 15, 2026 |
| Solicitation No: | 26-005 (WWAN04) |
| Original Source: | Please Login to View Page |
| Contact information: | Please Login to View Page |
| Bid Documents: | Please Login to View Page |
Project ID: 26-005 (WWAN04)
Title: Wastewater Reclamation Facility Primary Scum Flushing Loop
Addenda: 0
Release Date: 6/23/2026
Due Date: 7/15/2026
The Wastewater Reclamation Facility (WRF) is soliciting for a qualified Contractor to provide a new valve and loop system for the Primary Scum Flushing Loop. The project shall generally include Contractor supplying new equipment, removal of existing pipe sections and couplers, and replacement with new pipe sections, couplers, and new valves, to manufacturer specifications to allow the sludge and water through the intake manifold of the Scum Pumps for high volume cleaning and flushing. The contractor shall complete all work as outlined in this Invitation for Bid (IFB).
Currently the flushing system utilizes a 6" scum line from the Primary Clarifier to the DAF tanks and without regular flushing the solids can get compacted, causing pumps to overload and shut off. The system only provides back flushing to the pumps with very little head pressure to scour or push the solids forward. The system has a valve between the Primary Clarifier, DAFT tanks, and Gravity Thickener so that if necessary, the sludge that is normally sent to the Gravity Thickener can be sent directly to the DAF tanks. This allows the Gravity Thickener to be shut down for annual maintenance/refurbishing.
A new valve and loop system will allow sludge and water through the intake manifold of the Scum Pumps for high volume cleaning and flushing to avoid solid buildups that stop the Scum Pumps. It is anticipated that the new valve and loop system will significantly reduce maintenance and down time.
With Free Trial, you can:
You will have a full access to bids, website, and receive daily bid report via email and web.
Project ID: 26-033 Title: Replacement of Building Doors for Water Reclamation Facility -
City of pueblo
Bid Due: 8/07/2026
Public Works Master Plan and Bus Storage Facility Design Department: Engineering Category: Requests
Town of Breckenridge
Bid Due: 8/27/2026
Bid Number: RFP-SN-2026-26 Bid Title: Engineering Design Services for the Mt. Werner Road
Steamboat Springs
Bid Due: 8/07/2026
23rd Avenue Stormwater Design FY26 007 RFQ 23Rd Ave Stormwater Design Final FY26
City of Evans
Bid Due: 8/07/2026