Wake BRT New Bern Avenue Construction Package 2

Agency: State Government of North Carolina
State: North Carolina
Type of Government: State & Local
NAICS Category:
  • 236220 - Commercial and Institutional Building Construction
Posted Date: Jul 23, 2025
Due Date: Sep 19, 2025
Solicitation No: 274-ES-2023-05R-2
Original Source: Please Login to View Page
Contact information: Please Login to View Page
Bid Documents: Please Login to View Page

Description

Solicitation Number: 274-ES-2023-05R-2
Project Title: Wake BRT New Bern Avenue Construction Package 2
Description: The Project consists generally of the following major items: The project includes asphalt and concrete pavement, sidewalk and multi-use path, retaining walls, culvert, storm drainage, erosion control, utility relocations, pavement markings, signing, traffic signals, conduit and fiber, traffic control, landscaping, and other miscellaneous items. Prominent changes from the August 2024 Advertisement consists generally of the following: 1. Construction Packages by Area. This will be the 2nd of 3 anticipated construction packages. 2. Extended Construction Contract Time for Area 2 to 42 months. 3. Reduced Liquidated Damages. 4. Reduced DBE percent from 13% to 8%. 5. Removed conflicting specifications. NCDOT Specifications will be the leading specification. 6. Advanced Utility By Other construction and joint Owner utility coordination for construction. 7. Includes items for non-standard excavation and removal for example rock, cobble stone, and streetcar tracks.
Opening Date: 9/19/2025 1:00 PM
Posted Date: 7/24/2025
Status: Open
Department: CITY OF RALEIGH
Solicitation Number
*
274-ES-2023-05R-2
Department
CITY OF RALEIGH
Status Reason
Open
Opening Date
2025-09-19T13:00:00.0000000
Posted Date
*
2025-07-23T18:34:35.0000000Z
Commodity Code
Construction Services
Mandatory Conference/Site Visit
2025-08-14T04:00:00.0000000Z
Special Instructions
Contact: Sam Brewer, Sam.Brewer@raleighnc.gov
Description
The Project consists generally of the following major items: The project includes asphalt and concrete pavement, sidewalk and multi-use path, retaining walls, culvert, storm drainage, erosion control, utility relocations, pavement markings, signing, traffic signals, conduit and fiber, traffic control, landscaping, and other miscellaneous items. Prominent changes from the August 2024 Advertisement consists generally of the following: 1. Construction Packages by Area. This will be the 2nd of 3 anticipated construction packages. 2. Extended Construction Contract Time for Area 2 to 42 months. 3. Reduced Liquidated Damages. 4. Reduced DBE percent from 13% to 8%. 5. Removed conflicting specifications. NCDOT Specifications will be the leading specification. 6. Advanced Utility By Other construction and joint Owner utility coordination for construction. 7. Includes items for non-standard excavation and removal for example rock, cobble stone, and streetcar tracks.
Attachments
Get Government Bids Like This by Email Receive daily bid alerts that match your keywords, business categories, and target regions.

See Also

DE00435 POC Resurfacing - RR Crossings DE00435 - Combined Plan Set.pdf Doc. Type:

Division of Highways

Due by 10/14/2026

Bid Title: Bid 4005-102126 Paratransit Operations Facility LVT Flooring Replacement Category: Bid Opportunities

City of High Point

Due by 10/21/2026

ADVERTISEMENT FOR BIDS- Lufkin Road Middle School Fire Alarm Replacement ADVERTISEMENT FOR BIDS-

Wake County Public School System

Due by 10/13/2026

DM00529; WBS 50942.3.3; TIP BO-2413A POC DM00529 Pedestrian Improvements, Curb Ramps, and Driveway

Division of Highways

Due by 10/21/2026

* Disclaimer: This website provides information about bids, requests for proposals (RFPs), or requests for qualifications (RFQs) for convenience only and does not serve as an official public notice. Individuals who wish to respond to or inquire about bids, RFPs, or RFQs should contact the relevant government department directly.