W91237-26-R-A013; Fishtrap Lake Intake Structure and Dam Rehab
| Agency: | DEPT OF DEFENSE |
|---|---|
| State: | Kentucky |
| Type of Government: | Federal |
| FSC Category: |
|
| NAICS Category: |
|
| Set Aside: | No Set aside used |
| Posted Date: | Jul 2, 2026 |
| Due Date: | Jul 29, 2026 |
| Solicitation No: | W9123726RA013 |
| Original Source: | Please Login to View Page |
| Contact information: | Please Login to View Page |
| Bid Documents: | Please Login to View Page |
Description
APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.
APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.
The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).
- Contract Opportunity Type: Combined Synopsis/Solicitation (Updated)
- Updated Published Date: Jul 02, 2026 02:12 pm EDT
- Original Published Date: Jun 29, 2026 03:37 pm EDT
- Updated Date Offers Due: Jul 29, 2026 05:00 pm EDT
- Original Date Offers Due: Jul 29, 2026 05:00 pm EDT
- Inactive Policy: 15 days after date offers due
- Updated Inactive Date: Aug 13, 2026
- Original Inactive Date: Aug 13, 2026
-
Initiative:
- None
- Original Set Aside: No Set aside used
- Product Service Code: Y1PZ - CONSTRUCTION OF OTHER NON-BUILDING FACILITIES
-
NAICS Code:
- 237990 - Other Heavy and Civil Engineering Construction
-
Place of Performance:
Fishtrap Lake 2204 Fishtrap RoadShelbiana, Kentucky 41562 Shelbiana , KY 41562USA
The U.S. Army Corps of Engineers, Huntington District intends to procure a contract for an intake structure and dam rehab at Fishtrap Lake in Shelbiana, Kentucky. The award of one firm-fixed price construction contract is anticipated.
The Contract includes, but is not limited to, furnish all materials, equipment, labor, layouts of work features, and supervision needed to accomplish work related to Fishtrap Lake, Intake Structure and Dam Rehab. The Contractor shall complete the work in accordance with appropriate product specifications, industry standards, and contract work order plans and specifications.
The current electrical commercial power source is a 12 KV distribution line owned by Kentucky Power Company (KPC). The existing line is located on the hillside and is not accessible by KPC boom trucks.
The existing line is an “open delta” configuration, meaning that there are only two phases present instead of the normal three phases. In the open delta configuration, the third phase is derived at the stepdown service transformers.
The contract includes the following work tasks:
Base
- Removal and replacement of the Intake Structure Air Circulator.
- Removal of the Intake Structure Water Pump.
- Installation of the roof damper motor.
- Removal and replacement of four sluice gate level monitors.
- Removal and replacement of new line shafts, line shaft couplings, bearings, and brake wheels and shoes.
- Removal and replacement of the Motor Control Center.
- Removal and replacement of wiring.
- Installation of an E-Stop circuit wiring for the hydraulic pumps.
- Removal and replacement of the electrical distribution equipment.
Option 1 (Cylinder Rehab)
- Disassembly and removal of the three (3) service gate cylinders and one (1) low flow gate cylinder. One new service gate cylinder will be fabricated and installed in place of one of the existing service gate cylinders. The other two cylinders and the low flow cylinder will be rehabbed and reinstalled. If enacted, Option 1 must be awarded alongside the Base Contract. See Option 4 or work in lieu of this task.
Option 2 (Crane Rehab)
- Removal and replacement of the existing motors, bearings, brakes, wiring, controls, rail clips, bumpers, wire rope, lubricants, grease fittings, couplings, hardware, festoon, lights, and limit switches.
- Rebuilding of the hook block.
- Cleaning and painting of the crane trolley, bridge, and runway.
Option 3 (Elevator Rehab)
- Removal and replacement of all power and control systems for the existing elevator.
Option 4 (Hydraulic Cylinder Replacement)
- Replacement of all three service gate cylinders in lieu of rehabilitation. This option will not be awarded in conjunction with but in lieu of Option 1.
The project work will be performed in accordance with directions included herein.
A site visit will be scheduled at a later date. The NAICS code for this procurement is 237990. Solicitation documents will be available on or about 29 July 2026 and can be downloaded at www.sam.gov. Offerors shall submit all documents electronically through PIEE Solicitation Module at www.piee.eb.mil by referencing Solicitation No. W9123726RA013. No paper copies, CD, DVD, thumb drives, email, or facsimile will be accepted. To be eligible for award, a firm must be resisted in System for Award Management (SAM). Register via the SAM internet site at www.sam.gov. Questions may be submitted to Lillie Bodie at lillie.v.bodie@usace.army.mil.
Please note, as of April 2018, GSA’s System for Award Management (SAM) system requires new registrations and renewals of existing registrations to submit an original signed notarized letter identifying the authorized Entity Administrator. The notarized letter is not to be submitted to the Huntington Contracting Office as it is not our requirement. Vendors are encouraged to check their entity’s status in www.SAM.gov and plan accordingly. If the prospective contractor is not registered in the SAM database, the Contracting Officer will follow the procedures in FAR 4.1103. Contact the supporting Federal Service Desk at www.fsd.gov, or by telephone at 866-606-8220 (toll free) or 334-206-7828 (internationally) Monday through Friday from 8am to 8pm EDT, for free assistance. The SAM registration process may take several weeks to process once submitted. Please carefully consider this information when deciding to submit your proposal.
The POC for this procurement is Lillie V. Bodie, lillie.v.bodie@usace.army.mil and Danielle Roar, Danielle.l.roar@usace.army.mil.
- KO CONTRACTING OFFICE 502 EIGHTH STREET
- HUNTINGTON , WV 25701-5000
- USA
- Lillie Bodie
- lillie.v.bodie@usace.army.mil
- Phone Number 3043995139
- Jul 02, 2026 02:12 pm EDTCombined Synopsis/Solicitation (Updated)
- Jun 29, 2026 03:49 pm EDT Combined Synopsis/Solicitation (Updated)
- Jun 29, 2026 03:48 pm EDT Combined Synopsis/Solicitation (Updated)
- Jun 29, 2026 03:37 pm EDT Combined Synopsis/Solicitation (Original)
Related Document
| Jun 29, 2026 | [Combined Synopsis/Solicitation (Updated)] W91237-26-R-A013; Fishtrap Lake Intake Structure and Dam Rehab |
See Also
Follow Fishtrap Lake Intake Structure and Dam Rehabilitation; W91237-26-R-A020 Active Contract Opportunity Notice
DEPT OF DEFENSE
Due by 9/25/2026
Follow CAMP NELSON NATIONAL CEMETERY, KY 833CM3030 - CORRECT FCA DEFICIENCIES Active Contract
VETERANS AFFAIRS, DEPARTMENT OF
Due by 9/17/2026
General Information Document ID RFB-785-2600000643-8 Status Amended Description RFB-275-26 Willisburg Lake Dam Rehabilitation
State Government of Kentucky
Due by 9/17/2026
Follow Nolin River Lake Tailwater Restroom Construction Active Contract Opportunity Notice ID W912QR26QA110
DEPT OF DEFENSE
Due by 9/18/2026