W Main St Pedestrian Corridor
| Agency: | State Government of Georgia |
|---|---|
| State: | Georgia |
| Type of Government: | State & Local |
| Posted Date: | Apr 2, 2026 |
| Due Date: | May 7, 2026 |
| Solicitation No: | PE-66114-NONST-2026-000000034 |
| Original Source: | Please Login to View Page |
| Contact information: | Please Login to View Page |
| Bid Documents: | Please Login to View Page |
Description
| Event ID | Event Title | Government Entity | Start Date (ET) | End Date (ET) |
| PE-66114-NONST-2026-000000034 | W Main St Pedestrian Corridor | Canton, City Of |
Apr 02, 2026 @ 08:35 AM
|
May 07, 2026 @ 10:00 AM
|
Start Date: Apr 02, 2026 @ 08:35 AM ET
End Date:
May 07, 2026 @ 10:00 AM ET
Description
The project generally consists of the following major items: 1. Conversion of the existing two-way roadway to one-way with on-street angled parking. 2. Roadway widening and overlay. 3. Installation of 10' wide , 6" thick concrete sidewalk with brick pavers. 4. Installation of 24" curb and gutter. 5. Driveway reconstruction and traffic control throughout construction. 6. Storm drain installation. 7. Signing and pavement markings. 8. Landscaping and streetscaping. 9. Site grading and stabilization of disturbed areas with temporary and permanent erosion control measures. 10. Water and sewer main and service installation. 11. Coordination of overhead to underground utility conversion and lighting installation.
| Code | Description |
| 91223 | Construction, General: Backfill Services, Digging, Ditching, Road Grading, Rock Stabilization, etc. |
| 91232 | Construction, Street Lighting |
| 91319 | Construction, Curb and Gutter, Including Maintenance, Repair, and Removal Services |
| 91327 | Construction, Highway and Road |
| 91336 | Construction, Parking Lot and Alley |
| 91345 | Construction, Sewer and Storm Drain |
| 91347 | Construction, Sidewalk and Driveway, Including Pedestrian and Handicap Ramps |
| 91350 | Construction, Streets, Major and Residential, Including Reconstruction |
| 91356 | Construction, Utility and Underground Projects |
| 91362 | Construction, Concrete, Pour-In-Place, Form, Place, Finish |
| 91361 | Construction, Vertical, Concrete, Pour-In-Place, Form, Place, Finish |
| 98863 | Park Area Construction and Renovation |
| 74565 | Patching Mix, Asphalt Concrete |
| 74521 | Asphaltic Concrete, Hot Laid Including Bituminous Materials |
| 74514 | Asphaltic Concrete, Cold Laid, Rock Asphalt |
| 91371 | Maintenance and Repair, Highway and Roads, Including Removal of Asphalt, Concrete, Bitumens, etc. |
| 91430 | Concrete |
| 91063 | Public Utilities: Water, Sewer and Gas Maintenance and Repair Services |
Bethany Watson
bethany.watson@cantonga.gov
770-704-1521
See Also
RFQ for MLK Blvd-Altama Ave Bicycle and Pedestrian Trail Project Bid/RFP Status Open
City of Brunswick
Due by 9/18/2026
Event ID Event Title Government Entity Start Date (ET) End Date (ET) PE-66033-NONST-2027-000000008
State Government of Georgia
Due by 10/06/2026
Event ID Event Title Government Entity Start Date (ET) End Date (ET) PE-55463-NONST-2027-000000027
State Government of Georgia
Due by 10/01/2026
RFP2027-02 Lewis Frasier Middle School Boiler Replacement Title: RFP2027-02 Lewis Frasier Middle School
Liberty County School System
Due by 10/09/2026