W343, FY 27 THROUGH FY 30 AIRFIELD CAPITAL IMPROVEMENT PROJECTS, WORCESTER REGIONAL AIRPORT, WORCESTER, MA

Agency: The Massachusetts Port Authority (Massport)
State: Massachusetts
Type of Government: State & Local
NAICS Category:
  • 236220 - Commercial and Institutional Building Construction
  • 237990 - Other Heavy and Civil Engineering Construction
  • 541330 - Engineering Services
Posted Date: Jun 29, 2026
Due Date: Aug 13, 2026
Solicitation No: W343
Original Source: Please Login to View Page
Contact information: Please Login to View Page
Bid Documents: Please Login to View Page

Description

AdvertisedContract: W343

W343, FY 27 THROUGH FY 30 AIRFIELD CAPITAL IMPROVEMENT PROJECTS, WORCESTER REGIONAL AIRPORT, WORCESTER, MA

Contract:


W343

Opportunity Type:


Professional Consultant


If you would like to submit, please go to (BidExpress) .

Advertised Date:


07/01/2026
09:00:00 AM

Due Date:


08/13/2026
12:00:00 PM

Attachment Preview

MASSACHUSETTS PORT AUTHORITY
CAPITAL PROGRAMS DEPARTMENT
SUITE 209S - LOGAN OFFICE CENTER SUITE 209S
ONE HARBORSIDE DRIVE
EAST BOSTON MA 02128-2909
REQUEST FOR QUALIFICATIONS
W343
WORCESTER REGIONAL AIRPORT
FY 2027-30 AIRFIELD CAPITAL IMPROVEMENT PROJECTS
WORCESTER, MASSACHUSETTS
SUPPLEMENTAL INFORMATION PACKAGE
1 Rev 4.22.2026

LEGAL NOTICE
REQUEST FOR QUALIFICATIONS
The MASSACHUSETTS PORT AUTHORITY (Authority) is soliciting consulting services for MPA
CONTRACT NO. W343, FY 27 THROUGH FY 30 AIRFIELD CAPITAL IMPROVEMENT
PROJECTS, WORCESTER REGIONAL AIRPORT, WORCESTER, MA. The Authority is seeking
qualified multidiscipline consulting firms or teams, with proven experience to provide professional services
including planning, design, and construction including resident inspection services for airfield capital
improvement projects. Multiple consultant selections will be made according to FAA direction relating to the
Airport Improvement Program (AIP) grant program.
The RFQ includes specific scope for the following four (4) projects: (1) Rehabilitate Taxiway B from former
Taxiway F to Runway 29; (2) Rehabilitate Terminal Apron; (3) Extend Taxiway Bravo to Runway 33 and
Runway 15, and (4) Construct Taxiway F from Runway 11-29 to Taxiway B.
The Consultant shall demonstrate experience in several disciplines including but not limited to Civil, Pavement
Design, Airfield Electrical, Cost Estimating, Airfield Construction Phasing, Resident Inspection, Climate
Resiliency, and Sustainable Design.
The contract will be work order based, and Consultant's fee for each work order shall be negotiated; however,
the total fee for the contract shall not exceed TWO MILLION FIVE HUNDRED THOUSAND DOLLARS
($2,500,000) per contract.
A Supplemental Information Package will be available, on July 1, 2026, on the Capital Bid Opportunities
webpage of Massport http://www.massport.com/massport/business/bids-opportunities/capital-bids as an
attachment to the original Legal Notice, and on COMMBUYS (www.commbuys.com) in the listings for this
project. If you have problems finding it, please contact Susan Brace at Capital Programs SBrace@massport.com
The Supplemental Information Package will provide detailed information about Scope of Work, Selection
Criteria and Submission Requirements.
In recognition of the unique nature of the project and the services required to support it, the Authority has
scheduled a Consultant Briefing on Microsoft teams at 10 a.m. on Wednesday, July 15, 2026,
https://teams.microsoft.com/meet/222611385380435?p=d3yOOoidpb78FoPK7e; Meeting ID: 222 611 385 380
435 Passcode: Up7Va9fs Dial in: +1 929 -346-7445 Phone meeting ID: 288 432 658#. At this session, an
overview of the project will be provided, the services requested by the Authority will be described, and questions
will be answered.
By responding to this solicitation, consultants agree to accept the terms and conditions of Massport's standard
Federal work order agreement, a copy of the Authority's standard agreement can be found on the Authority's
web page at http://www.massport.com/massport/business/capital-improvements/important-documents/. The
Consultant shall specify in its cover letter that it has the ability to obtain requisite insurance coverage.
This submission shall be addressed to Luciana Burdi, Chief Infrastructure Officer and received no later than
12:00 Noon on August 13, 2026, Via Bid Express https://www.bidexpress.com/businesses/27137/home.
Any submission which is not received by the deadline shall be rejected by the Authority as non-responsive.
MASSACHUSETTS PORT AUTHORITY
Richard A. Davey
CEO & Executive Director
2 Rev 4.22.2026

BACKGROUND
Background:
The Authority is seeking qualified multidiscipline consulting firms or teams, with proven experience to
provide professional services including planning, design, construction phase services, and resident
inspection for its airfield capital improvement projects at Worcester Regional Airport. The Consultant
must be able to work closely with the Authority and other interested parties in order to provide such
services in a timely and effective manner. Multiple consultant selections will be made under this RFQ in
accordance with FAA guidelines for Consultant selection.
The RFQ includes specific scope for the following four (4) projects: (1) Rehabilitate Taxiway B from former
Taxiway F to Runway 29; (2) Rehabilitate Terminal Apron; (3) Extend Taxiway Bravo to Runway 33 and
Runway 15, and (4) Construct Taxiway F from Runway 11-29 to Taxiway B.
The Consultant shall demonstrate experience in several disciplines including but not limited to Civil, Pavement
Design, Airfield Electrical, Cost Estimating, Airfield Construction Phasing, Resident Inspection, Climate
Resiliency, and Sustainable Design.
This series of projects supports the FAA Airport Capital Improvement Program (ACIP) for Worcester
Regional Airport. The listed projects are anticipated to be eligible for FAA grant funding and will require
compliance with FAA design and construction standards. Each project is identified in the paragraphs below
along with a brief description. These projects reflect the current plan for grant eligible work within the next
two to three years based on the ACIP developed and reviewed with the FAA New England Region Airports
Division. The order of projects is numerical only. The actual sequence of work is dependent on several
factors including the need for any environmental approvals, current pavement conditions, electrical needs,
along with tenant construction activity and overall airport operations.
Refer to the attached graphic entitled "Worcester Regional Airport Projects for Consultant Selection."
(1) W331 Rehabilitate Taxiway B from former Taxiway F to Runway 29
Taxiway B is a key taxiway that services Runway 11-29 and Runway 15-33 and provides access to
the terminal apron. The project limits would extend from the former Taxiway F intersection and to
Taxiway A, and the taxiway section closest to the terminal apron would need to be reviewed for a
potential realignment to meet FAA runway to taxiway centerline distance standards. This taxiway
section is in excess of ten years old and in need of pavement rehabilitation.
3 Rev 4.22.2026

The lighting systems on this portion of taxiway consist of edge and centerline lights. As part of this
project new circuitry will be included and all fixtures will be upgraded to the newest LED models.
The rehabilitation and electrical upgrades will require close coordination with Worcester Airport
Operations, especially during the development of phasing concepts due to the use of the taxiway and
its role as serving as a main aircraft route.
Anticipated project schedule: Design FY26; Construction FY27
Estimated construction cost: $5.5 million
Note: Massport Fiscal Year runs from July 1 to June 30. FY 27 Starts July 1, 2026, and ends June
30, 2027
(2) W302 Rehabilitate Terminal Apron
The terminal apron was constructed of rigid Portland Cement Concrete pavement in 1996 as part of
the major airport terminal improvement project. The PCC apron is located where there are four jet
bridge gates at the terminal building that serves various air carriers. This project scope would include
the repairs such as select removal and replacement of the PCC apron slabs, spall repairs, joint
replacement, to restore its pavement life span.
4 Rev 4.22.2026

The rehabilitation will require close coordination with Worcester Airport Operations, especially
during the development of phasing concepts due to the proximity of the terminal gates.
Anticipated project schedule: Design FY27; Construction FY28
Estimated construction cost: $2.3 million
(3) W311 Extend Taxiway Bravo to Runway 33 and Runway 15.
Taxiway B currently ends up at Taxiway A on the south side and at Taxiway E on the north side.
Due to existing topographic issues and potential ledge Taxiway B does not terminate at the end of
Runway 15 nor Runway 33. This project scope would include extending Taxiway B to the end of
Runway 15 and to the end of Runway 33.
The existing lighting system on these sections of Taxiway B consists of edge lights on the north side
and centerline and edge on the south side. As part of this project new electrical infrastructure will be
included such as light bases and conduit, light fixtures and guidance signs with new circuitry.
The taxiway extensions with electrical work will require close coordination with Worcester Airport
Operations, especially during the development of phasing concepts due to the use of the taxiway and
its proximity to airfield tenants and Fixed Base Operators (FBOs).
Anticipated project schedule: Design FY29; Construction FY30
Estimated construction cost: $3.2 million
5 Rev 4.22.2026

(4) W309 Construct Taxiway F from Runway 11-29 to Taxiway B.
The most recent geometry study and future Airport Layout Plan identify a new replacement taxiway
of the old Taxiway F coming off the approximate mid-point of Runway 11-29 and continues a taxi
route across Runway 15-33 to Taxiway B. This proposed taxiway will allow aircraft to safely turn
off Runway 11-29 that either miss the entrance to Taxiway D coming from the west or exit Runway
11-29 sooner coming from the east. This new taxiway will also square off at a 90-degree crossing
of Runway 15-33 compared to the existing angled crossing that exists today meeting FAA design
criteria.
The name of the new taxiway would require a Taxiway Foxtrot name until the existing Taxiway
Delta can re-aligned/re-configured as shown on the Airport Layout Plan.
The proposed taxiway would include new taxiway edge lighting and guidance signs.
The proposed taxiway with electrical work will require close coordination with Worcester Airport
Operations, especially during the development of phasing concepts due to the impact to Runway 11-
29 and Runway 15-33.
Anticipated project schedule: Design FY29; Construction FY30
Estimated construction cost: $7 million
6 Rev 4.22.2026

SCOPE OF WORK:
The Authority is seeking a qualified multidiscipline consulting firm/team, with proven experience to
provide professional services including planning, design, and construction support and resident inspection
services, relative to the projects at Worcester Regional Airport, Worcester, Massachusetts. The Consultant
must be capable of working collaboratively with the Authority and other stake holders to ensure the timely
and effective delivery of all project phases.
The Consultant shall demonstrate experience in several disciplines including but not limited to:
* Airfield Civil
* Airfield pavement design
* Airfield electrical
* Airfield Civil 3D/CIM
* Airfield construction phasing
* Subsurface investigation and construction acceptance testing
* Construction Cost Estimating
* LEAN Practices,
* Resident inspection,
* LSP services as applicable
* Climate Resiliency,
* Sustainable Design and
* FAA AGIS requirements as applicable.
Topographic survey of the runway and utility base maps will be provided by Massport.
The scope of work shall include, but not be limited to the following:
(1) The Consultant must commence work by performing a detailed review of existing conditions, original
design documents, record drawings, available reports, and submittals. With this information, the
Consultant shall prepare a Preliminary Design Report in accordance with FAA guidelines which identifies
the project scope, budgetary cost, schedule, and logistical concerns. It is anticipated, as part of the
rehabilitation design, that the Consultant perform the necessary investigation of the existing pavement
and, as needed, underlying aggregates and soils, to confirm the limits and depths of the pavement which
needs to be rehabilitated.
(2) The Consultant will be expected to assist in any environmental permitting required as part of these
changes, in particular with relation to Natural Heritage Endangered Species Protection (as appropriate by
project).
(3) The Consultant will be expected to develop design documents suitable for bidding and construction.
This shall include specifications, cost estimates, contract drawings including but not limited to phasing,
civil and electrical. A construction safety and phasing plan (CSPP) shall also be developed for the project.
(4) The Consultant will be required to perform Construction Administration services and provide full-
time resident inspection services for all aspects of construction. This will likely include providing
multiple inspectors on a daily basis based on construction activities as well as supporting work on
weekends and at night.
(5) The Consultant will be required to provide the necessary acceptance testing during construction and
manage the closeout of the construction contract.
7 Rev 4.22.2026

(6) Construction of the airfield electrical project and pavement rehabilitations will need to be coordinated
and phased to minimize impacts to airport operations. The implementation of each project is likely to take
place in one construction season or a portion of one season. The Consultant will be required to develop
detailed phasing plans for review with internal Massport departments and for Massport to use when
presenting the project to the ORH users and the FAA for multiple meetings.
(7) Provide Licensed Site Professional (LSP) services to evaluate environmental conditions within areas
of proposed work early in design, plan soil and groundwater management strategy, support
characterization of soil and other waste for disposal, provide input to design and bid documents, and
provide support for other hazardous and contaminated materials management and/or LSP services as
needed.
In recognition of the unique nature of the project and the services required to support it, the Authority has
scheduled a Consultant Briefing on Microsoft teams at 10 a.m. on Wednesday, July 15, 2026,
https://teams.microsoft.com/meet/222611385380435?p=d3yOOoidpb78FoPK7e; Meeting ID: 222 611 385
380 435 Passcode: Up7Va9fs Dial in: +1 929 -346-7445 Phone meeting ID: 288 432 658#. At this session, an
overview of the project will be provided, the services requested by the Authority will be described, and
questions will be answered
EVALUATION CRITERIA:
The submission shall be evaluated on the basis of the following equally weighted criteria:
(1) Demonstrated experience and knowledge of the team for similar projects of similar size and
complexity particularly important to demonstrate for the Project Manager. Highlight the
experience and expertise for major sub-consultants and their assigned staff. Familiarity with
public construction procurement under MGL Ch. 30, and
(2) Project understanding and proposed technical approach including QA/QC process during
document preparation, cost management and scheduling capabilities, construction oversight,
ability to plan and perform work with minimal disruption to operations, and
(3) Demonstrated experience in integrating and managing BIM/VDC in the planning, design and
construction. Experience of utilizing Lean Design & Construction (Last Planner System(R),
Scrum or others tools) to increase the reliability and significantly improve projects and teams'
performance, and
(4) Demonstrated project experience in sustainable and resilient high performance building and
infrastructure design and construction, including experience with low, net zero ready or net
zero emissions, water, and waste, lifecycle analysis including embodied carbon, innovative
renewable energy strategies, and building and infrastructure sustainability certification
schemes relevant to this proposal. Firms are encouraged to demonstrate "outside of the box"
thinking for examples of inclusion of sustainable practices into its projects, and specify how
those practices may be applied to this project proposal. Firms must demonstrate the capability
to incorporate design features into any project type that reflect best practices in environmental
stewardship.
The Authority recommends that each evaluation criteria is addressed in the response as a separate section.
The selection shall involve a two-step process including the shortlisting of a minimum of three firms based
on an evaluation of the Statements of Qualifications received in response to this solicitation, followed
8 Rev 4.22.2026

MPA project #_Company Name-YY-MM-DD.pdf
Example: L2302_Massport-23-04-24.pdf
Files submitted via Bid Express must follow the above filing naming convention specific in the
"Description" field for each document in the "Required Document Upload" table in Bid Express. The file
name and description entered during the file upload process ensures each file can be readily identified by
Massport.
All submissions must be in .pdf format and must be in such a way that they can be read on a computer and
printed on 8 12" x 11" paper, unless otherwise specified.

immediately by a final selection of the consultant by the Authority. The Authority reserves the right to
interview the firms prior to final selection, if deemed appropriate.
SUBMISSION REQUIREMENTS:
Each submission shall include a Statement of Qualifications that provides detailed information in
response to the evaluation criteria set forth below and include Architect/Engineer & Related Services
questionnaires SF 330 (https://www.gsa.gov/reference/forms/architectengineer-qualifications)
with the appropriate number of Part IIs.
All individuals responsible for technical disciplines shall, upon commencement of the project, be registered
Architects or Engineers, in that discipline, in the Commonwealth of Massachusetts.
The Consultant shall specify in its cover letter that it has the ability to obtain requisite insurance coverage.
The Authority may reject any application if any of the required information is not provided: Cover
Letter, Insurance Requirements and SF330 Part IIs for the Prime and every sub-consultant.
Make sure that the Cover Letter is "Signed under the pains and penalties of perjury", and that you
mention the Insurance in the Cover Letter itself.
RFQ Instructions for Electronic Submission:
Electronic submissions will be via https://www.bidexpress.com/businesses/27137/home. Please refer to
https://www.massport.com/massport/business/bids-opportunities/capital-bids/ website for instructions on
how to submit an electronic RFQ submittal.
1. Download RFQ documents in Bid Express and fully review them before submitting your electronic
Statement of Qualifications.
2. Upload ALL required documents listed below in accordance with the instructions on Bid Express
and those in the RFQ. Failure to include all required materials or to provide materials in a format
different than that specified may have a negative effect on the evaluation or result in
disqualification.
3. Click the "Submit" button in Bid Express to review your response for completeness and to
encrypt/submit your response electronically.
File Naming Convention:
MPA project #_Company Name-YY-MM-DD.pdf
Example: L2302_Massport-23-04-24.pdf
Files submitted via Bid Express must follow the above filing naming convention specific in the
"Description" field for each document in the "Required Document Upload" table in Bid Express. The file
name and description entered during the file upload process ensures each file can be readily identified by
Massport.
All submissions must be in .pdf format and must be in such a way that they can be read on a computer and
printed on 8 12" x 11" paper, unless otherwise specified.
Please consider the number of pages being submitted, including the following:
* Resumes of the top 10 key individuals, each limited to one (1) page under SF 330, Section E,
* No more than ten (10) projects each limited to one (1) page under SF 330, Section F,
* No more than ten pages (5 sheets) between SF 330 Section H and "other relevant materials" section
of the submission.
9 Rev 4.22.2026

EVENT DATE/TIME
Solicitation: Release Date and Supplemental Package Available Wednesday, July 1, 2026
Consultant Briefing Wednesday, July 15, 2026
Deadline for submission of written questions Monday, July 20, 2026, at 12:00PM (noon)
Official answers published (Estimated) Friday, July 24, 2026
Solicitation: Close Date / Submission Deadline August 13, 2026, at 12:00PM (noon)

This contract will be funded, in part, by a federal Airport Improvement Program (AIP) grant and, as such,
certain federal terms and conditions will apply to the contract.
By responding to this solicitation, consultants agree to accept the terms and conditions of Massport's
standard work order agreement, a copy of the Authority's standard agreement can be found on the
Authority's web page at http://www.massport.com/massport/business/capital-improvements/important-
documents/. The Consultant shall specify in its cover letter that it has the ability to obtain requisite insurance
coverage.
In recognition of the unique nature of the project and the services required to support it, the Authority has
scheduled a Consultant Briefing on Microsoft teams at 10 a.m. on Wednesday, July 15, 2026,
https://teams.microsoft.com/meet/222611385380435?p=d3yOOoidpb78FoPK7e; Meeting ID: 222 611 385 380
435 Passcode: Up7Va9fs Dial in: +1 929 -346-7445 Phone meeting ID: 288 432 658#. At this session, an
overview of the project will be provided, the services requested by the Authority will be described, and
questions will be answered.
This submission, shall be addressed to Luciana Burdi, Intl. Assoc. AIA, CCM, MCPPO, NAC, FCMAA
Chief Infrastructure Officer and received no later than 12:00 Noon on August 13, 2026, via Bid Express
https://www.bidexpress.com/businesses/27137/home. Any submission which is not received by the
deadline shall be rejected by the Authority as non-responsive. Any information provided to the Authority
in any Proposal or other written or oral communication between the Proposer and the Authority will not be,
or deemed to have been, proprietary or confidential, although the Authority will use reasonable efforts not
to disclose such information to persons who are not employees or consultants retained by the Authority
except as may be required by M.G.L. c.66.
The procurement process for these services will proceed according to the following anticipated schedule:
EVENT DATE/TIME
Solicitation: Release Date and Supplemental Wednesday, July 1, 2026
Package Available
Wednesday, July 15, 2026
Consultant Briefing
Monday, July 20, 2026, at 12:00PM (noon)
Deadline for submission of written questions
Friday, July 24, 2026
Official answers published (Estimated)
August 13, 2026, at 12:00PM (noon)
Solicitation: Close Date / Submission Deadline
Times are Eastern Standard Time (US).
Questions may be sent via email to CPBidQuestions@massport.com subject to the deadline for receipt
stated in the timetable above. In the subject lines of your email, please reference the MPA Project Name
and Number. Questions and their responses will be posted on on Bid Express
https://www.bidexpress.com/ and Capital Bid Opportunities webpage of Massport
http://www.massport.com/massport/business/bids-opportunities/capital-bids as an attachment to the
original Legal Notice and on COMMBUYS (www.commbuys.com) in the listings for this project.
10 Rev 4.22.2026

This page summarizes the opportunity, including an overview and a preview of the attached documents.
Get Government Bids Like This by Email Receive daily bid alerts that match your keywords, business categories, and target regions.

See Also

Follow Construction Services for the Construction of the New Project Office at East

DEPT OF DEFENSE

Header Information Bid Number: BD-27-1030-0H100-0H002-132949 Description: 612874 SHREWSBURY-WORCESTER Bridge Preservation, S-14-021=W-44-115, I-290 (EB

Commonwealth of Massachusetts

Due by 10/27/2026

Follow East Bulkhead Replacement, East Boat Basin, Cape Cod Canal, Sandwich MA Active

DEPT OF DEFENSE

Due by 9/21/2026

Follow W50S8126BA012 Active Contract Opportunity Notice ID W50S8126BA012 Related Notice Department/Ind. Agency DEPT

DEPT OF DEFENSE

Due by 9/29/2026

* Disclaimer: This website provides information about bids, requests for proposals (RFPs), or requests for qualifications (RFQs) for convenience only and does not serve as an official public notice. Individuals who wish to respond to or inquire about bids, RFPs, or RFQs should contact the relevant government department directly.