VNET 2nd ISP Circuit 07/01/2025-06/30/2026
| Agency: | STATE, DEPARTMENT OF |
|---|---|
| State: | Federal |
| Type of Government: | Federal |
| FSC Category: |
|
| Set Aside: | Local Area Set-Aside (FAR 26.2) |
| Posted Date: | May 6, 2025 |
| Due Date: | May 21, 2025 |
| Solicitation No: | 19M05525P0401 |
| Original Source: | Please Login to View Page |
| Contact information: | Please Login to View Page |
| Bid Documents: | Please Login to View Page |
Description
APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.
APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.
The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).
- Contract Opportunity Type: Solicitation (Original)
- Original Published Date: May 06, 2025 01:08 pm CEST
- Original Date Offers Due: May 21, 2025 04:00 pm CEST
- Inactive Policy: 15 days after date offers due
- Original Inactive Date: Jun 05, 2025
-
Initiative:
- None
- Original Set Aside: Local Area Set-Aside (FAR 26.2)
- Product Service Code: DG10 - IT AND TELECOM - NETWORK AS A SERVICE
-
NAICS Code:
- 517112 - Wireless Telecommunications Carriers (except Satellite)
-
Place of Performance:
MAR
The Embassy of the United States of America in Rabat invites you to submit your quotes for the below mentioned services. The purpose of this document is to provide Posts with the standard NT specifications and requirements when ordering the internet circuits from the local ISP (Internet Service Provider).
This internet circuit shall be high-end, professional grade service that differs from the residential, dial up service. NT requires dedicated (not shared or bundled) Internet Bandwidth, 24/7, “always-on” with unlimited usage. Fiber optic, terrestrial connectivity is preferred. The local ISP access circuit to the Post must meet the following specifications/requirements for connectivity.
- A /28 subnet static Public IP addresses for VPN equipment, network mask, and default gateway IP address.
- ISP interface connectors: LC fiber connector (MM-multimode) – Gigabit interface
- ISP availability: "Always on"
- ISP connection: IPs must NOT repeat and NOT use Network Address Translation (NAT).
- ISP must permit all IP protocols (including but not limited to ICMP, UDP, TCP, and IPSEC) to transit without filters or proxies. Unfiltered access to the Internet is required without ISP firewall blocking or stateful inspection.
- ISP must permit installation of Customer VPN encryption devices on circuit.
- ISP must permit ping and trace route traffic from 169.252.0.0/16 and 169.253.0.0/16 to the ISP connection (LC fiber Gigabit MM router interface which terminates Customer VPN encryption device).
-
High quality performance, the following parameters in a vendor’s Service Level Agreement (SLA) should be used:
-
Packet Loss
- Availability of 99.9%.
-
Packet Loss
- Period of performance: from 07/01/2025 to 06/30/2026
- Speed required: 80 Mbps
- Km 5.7 Avenue Mohamed VI
- Souissi , Rabat 10170
- Morocco
- Fouad Mouaatakid
- mouaatakidf@state.gov
- Phone Number 212537637653
- Rabat GSO Contracts
- RabatGSOContracts@state.gov
- May 06, 2025 01:08 pm CESTSolicitation (Original)
See Also
Follow RFQ: Requirement to reaward a 50MB commercial lease Intra-SWA. Active Contract Opportunity
DEPT OF DEFENSE
Due by 9/28/2026
Follow D--S&P Global Ratings Direct Subscription Active Contract Opportunity Notice ID 140D0426Q0886 Related
INTERIOR, DEPARTMENT OF THE
Due by 9/15/2026
Follow PROVIDE, INSTALL, AND MAINTAIN A 10GB, NON-SWITCHED, ETHERNET CIRCUIT BETWEEN MA AND
DEPT OF DEFENSE
Due by 9/30/2026
Follow PROVIDE, INSTALL, AND MAINTAIN A 10GB, NON-SWITCHED, ETHERNET CIRCUIT BETWEEN MA AND
DEPT OF DEFENSE
Due by 9/30/2026