Virginia Callan Annex Rennovation Electrical Scope

Agency: Victoria College
State: Texas
Type of Government: State & Local
Posted Date: Aug 27, 2025
Due Date: Sep 3, 2025
Original Source: Please Login to View Page
Contact information: Please Login to View Page
Bid Documents: Please Login to View Page

Description

Status: OPEN
Title: Virginia Callan Annex Rennovation Electrical Scope
E-BID
Due Date: 9/3/2025

Open
Reference No.
RFP: 25/26-0005
Due Date
September 3, 2025 at 2:0:0 PM CDT
Conference Date
8/20/2025
Time Remaining
7 Days
Basic Info
Release Date
8/17/2025
Type
Request for Proposals
Categories
Electrical Construction
Electrical / Electrician Service
Electrical Engineering
Electrical Repair
Contact Info
Contact Name
Amber Baker
Email Address
amber.baker@victoriacollege.edu
Phone No.
3615726461
Download Package
Attachments
Description

VIRGINIA CALLAN WELDER PERFORMANCE ANNEX RENOVATION INTERIOR ELECTRICAL

207 N LIBERTY ST.

VICTORIA, TX 77901


MANDATORY PRE-PROPOSAL CONFERECE: 2:00pm, Wednesday, August 29th on site - 207 N Liberty St. Victoria, TX 77901


SCOPE OF WORK:

A. Work to be done under this contract shall include the furnishing of all labor, materials,

apparatus, and connections to complete, in finished operating condition, the work for

Virginia Callan Welder Performance Annex Renovation Interior.

B. Contractor shall take into account that deviations from routing and layout of new work

indicated on the Drawings may be required to avoid interference with existing structure

and facilities. Contractor shall be responsible for rerouting of existing conduit, piping,

etc., to avoid interference with new work if deviations in routing of new work cannot be

made to avoid interference with existing conditions. Wiring, piping, ductwork, etc.,

which serves loads or areas to remain in use either temporarily or permanently will be

rerouted as required and as directed to preserve continuity of service.

C. All items of labor, material, or equipment not required in detail by the Specifications or

Drawings, but incidental to, or necessary for the complete installation and proper

operation of all phases of work described herein, or reasonably implied in connection

therewith, shall be furnished as if called for in detail by the Specifications or Drawings.

D. Existing underground utilities are not indicated on the Drawings. The Contractor shall

be responsible for jobsite locating and protecting all existing underground utilities prior

to trenching or pier drilling.

Mandatory Conference Date

Date: August 20, 2025 at 2:00 PM CDT

At Site

207 N Liberty St

Victoria, TX 77901

Get Government Bids Like This by Email Receive daily bid alerts that match your keywords, business categories, and target regions.

See Also

Solicitation Details eResponse Instructions Subscribe Print PDF Type: Invitation For Bids (IFB) Status:

City of Austin

Due by 11/17/2026

Bid Information Type RFP-MA Status Issued Number 2321 (Electrical Supplies) Issue Date &

Alief Independent School District

Due by 4/30/2028

Project ID: Title: RFSOQ for Electrical Support Addenda: 1 Release Date: 10/12/2026 Due

Tarrant Regional Water District

Due by 11/20/2026

Due 11/9/2026 4:00 pm US/Central Open 7000211771 - Supply & Delivery of 750KVAR

CPS Energy

Due by 11/09/2026

* Disclaimer: This website provides information about bids, requests for proposals (RFPs), or requests for qualifications (RFQs) for convenience only and does not serve as an official public notice. Individuals who wish to respond to or inquire about bids, RFPs, or RFQs should contact the relevant government department directly.