| Agency: | University of Washington |
|---|---|
| State: | Washington |
| Type of Government: | State & Local |
| NAICS Category: |
|
| Posted Date: | Feb 11, 2025 |
| Due Date: | Mar 11, 2025 |
| Original Source: | Please Login to View Page |
| Contact information: | Please Login to View Page |
| Bid Documents: | Please Login to View Page |
Project Description: The project includes the following work: The primary scope is the renovation of approximately 40,000 SF of the existing 4th and 5th floors of the University of Washington Medical Center Northwest A-wing, 1550 N 115th Street Seattle, WA 98133. These floors are comprised of medical/surgical inpatient units with 36 patient rooms per floor. This is an interior tenant improvement only with no changes to building envelope. The renovation will meet the requirements of the Department of Health licensing. Project scope is limited to avoid a substantial alteration designation and Seattle Energy Code upgrades. Patient rooms and nurse stations will be updated with a more efficient layout and refreshed finishes. Patient room updates will include installation of new patient lifts, headwalls, plumbing fixtures, nurse call system, lighting and wall and floor finishes. Nurse stations will be updated with a more efficient layout and will minimize noise throughout the unit. The corridors will be updated with new flooring, wall finishes, lighting and wayfinding. Staff lounge and conference rooms will be updated. Mechanical system scope includes the replacement of the heating, ventilation, and cooling systems (HVAC) ductwork and VAV boxes and plumbing scope is to replace in-kind lavatories and water closets. Medical gas scope includes replacement of outlets in patient headwalls and new zone valve boxes. Electrical scope includes minor electrical and low voltage upgrades. Construction will occur in 2 phases per floor, non-concurrently, for a total of 4 phases. While construction is occurring on one half of a floor, the other half will continue to be an occupied inpatient unit. There will be a 2-week transition period between each phase to allow for UWMC to move in and move out. Thorough coordination will be required throughout all phases of construction to minimize impacts to the occupied space adjacent, above, and below the construction site.
Questions: Questions about this project should be directed to:
A/E Name: Ankrom Moisan Architects
Contact Person: Juan Flores
Phone Number: 206.576.1633
Email:
juanf@ankrommoisan.com
Mandatory Pre-Bid Site Meeting: The Project site is available for inspection by prospective bidders at a mandatory pre-bid site meeting and walk-through. All prospective bidders must attend one of the following meetings:
1. 9:00 am on Thursday February 20, 2025 at University of Washington Medical Center Northwest A-Wing, 1550 N 115th Street Seattle, WA 98133. Meet in the lobby near Starbucks.
2. 9:00 am on Friday February 21, 2025 at University of Washington Medical Center Northwest A-Wing, 1550 N 115th Street Seattle, WA 98133. Meet in the lobby near Starbucks.
Bid Documents: Bid documents, plans, specifications and addenda are available to view at
https://university-of-washington.public-portal.us.workdayspend.com/
With Free Trial, you can:
You will have a full access to bids, website, and receive daily bid report via email and web.
Project ID: SPL PW# A&E Seismic 2026-05 COL Title: Columbia Branch - Historical
City of Seattle
Bid Due: 6/10/2026
Project ID: Title: Spanaway Lake Fishing Pier Replacement Design Addenda: 0 Release Date:
Pierce County
Bid Due: 6/15/2026
Project ID: Title: Design Consultant - Chambers Creek Dam Removal and Estuary Bank
Pierce County
Bid Due: 6/24/2026
RFP | Forestry | Tunk Block Fire Tunk Creek Rehabilitation Disaster Relief Project
The Confederated Tribes of the Colville Reservation
Bid Due: 6/11/2026