UT NP ARCH 100(2) Bridges on Delicate Arch Road
| Agency: | TRANSPORTATION, DEPARTMENT OF |
|---|---|
| State: | Utah |
| Type of Government: | Federal |
| FSC Category: |
|
| NAICS Category: |
|
| Set Aside: | No Set aside used |
| Posted Date: | Sep 8, 2026 |
| Due Date: | Sep 23, 2026 |
| Solicitation No: | 6982AF27B000005 |
| Original Source: | Please Login to View Page |
| Contact information: | Please Login to View Page |
| Bid Documents: | Please Login to View Page |
Description
APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.
APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.
The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).
- Contract Opportunity Type: Presolicitation (Original)
- Original Published Date: Sep 08, 2026 12:32 pm MDT
- Original Response Date: Sep 23, 2026 02:00 pm MDT
- Inactive Policy: 15 days after response date
- Original Inactive Date: Oct 08, 2026
-
Initiative:
- None
- Original Set Aside: No Set aside used
- Product Service Code: Y1LB - CONSTRUCTION OF HIGHWAYS, ROADS, STREETS, BRIDGES, AND RAILWAYS
-
NAICS Code:
- 237310 - Highway, Street, and Bridge Construction
-
Place of Performance:
Moab , UTUSA
PROJECT NUMBER: UT NP ARCH 100(2)
PROJECT NAME: Bridges on Delicate Arch Road
PROJECT DESCRIPTION:
Delicate Arch Road (DAR) is within Arches National Park (Park) and provides access to
Delicate Arch. DAR is a functional class 1 roadway (Principal Park Road) and is heavily
traveled by visitors and often congested during periods with moderate-to-high levels of
visitation.
DAR crosses three low-gradient ephemeral washes (Salt Valley Wash, Salt Wash, and
Winter Camp Wash) near their confluence in the Salt Wash Basin downstream of Wolfe
Ranch. Culverts installed during original road construction in the mid-1990s and during
subsequent upgrades are inadequate to allow unobstructed stream flow and sediment
transport downstream. This existing condition produces flooding and sediment
deposition, which creates unsafe conditions for visitors, triggers road closures, potentially
strands Park visitors, diminishes visitor experience of the Park, and generates high
operational costs associated with traffic management, visitor safety, and cleanup
operations.
SCOPE OF THE WORK:
This project will be designated as Reconstruction (4R) with one segment of restoration
(3R), and will design and construct 100’ span concrete bridges at the Salt Valley Wash,
Salt Wash, and Winter Camp Wash. The DA roadway profile at each Wash will be raised
to accommodate a 10-year design frequency and allow a medium-sized excavator to
access each wash. The DA will be realigned at the Salt Valley wash, moving the roadway
and new bridge location to the north of the existing roadway and drainage crossing. The
remaining 3R sections of the roadway will receive full depth reclamation (FDR) or
removal of pavement, including all parking areas, followed by a 4-inch pavement
overlay.
PRINCIPAL WORK ITEMS:
- 20420-0000 Embankment Construction: 10,000 CUYD
- 25101-0300 Placed Riprap, Class 3: 1,725 CUYD
- 30202-2000 Roadway Aggregate, Method 2: 5,140 TON
-
40101-5600 Asphalt Concrete Pavement, Gyratory Mix, 1/2-Inch or 3/4-Inch Nominal Maximum Size Aggregate, 0.3 To
- 55201-0200 Structural Concrete, Class A (AE): 752 CUYD
- 55401-2000 Reinforcing Steel, Epoxy Coated: 138,000 LB
- 55601-1100 Bridge Railing, Steel, Two Rail: 642 LNFT
- 56501-0200 Drilled Shaft, 24-Inch Diameter: 750 LNFT
- 56501-0300 Drilled Shaft, 30-Inch Diameter: 890 LNFT
- 60901-1300 Curb, Concrete, 15-Inch Depth (Reinforced, Colored): 3,921 LNFT
- 61701-4500 Guardrail System Mgs, Type 2, Class A Steel Posts: 1,290 LNFT
- 63506-0500 Temporary Traffic Control, Flagger: 5,800 HOUR
ANTICIPATED SCHEDULE:
Advertisement – September 2026
Award – November 2026
NTP – December 2026
Contract Completion – December 2028
ESTIMATED COST RANGE:
Total estimated cost between $10,000,000 and $20,000,000
This will be solicited as a full and open competition.
- 12300 W. DAKOTA AVE
- LAKEWOOD , CO 80228
- USA
- Laura Slauter
- cflcontracts@dot.gov
- Ryan Phillips
- cflcontracts@dot.gov
- Sep 08, 2026 12:32 pm MDTPresolicitation (Original)
Related Document
| Sep 29, 2026 | [Presolicitation (Updated)] UT NP ARCH 100(2) Bridges on Delicate Arch Road |
| Oct 6, 2026 | [Solicitation (Updated)] UT NP ARCH 100(2) Bridges on Delicate Arch Road |
| Oct 15, 2026 | [Solicitation (Updated)] UT NP ARCH 100(2) Bridges on Delicate Arch Road |
| Oct 22, 2026 | [Solicitation (Updated)] UT NP ARCH 100(2) Bridges on Delicate Arch Road |
See Also
Project: SLCo SLP110326 SPCC Renovation Bid Package #00-Group #2 Preconstruction Assistance - Courtesy
State Government of Utah
Due by 12/03/2026
Follow F-35 Composite Repair and Training Facility / F-35 Maintenance Facility, Hill Air
DEPT OF DEFENSE
Due by 11/12/2026
Project: Construction: Taylorsville High School Addition Ref. #: DB27-011-RFP Department: SCHOOL DISTRICTS -
State Government of Utah
Due by 11/19/2026
Project: SLCo FAC133816-1 Midvale Campus Renovation General Contractor Selection Stage 2 - CONST
State Government of Utah
Due by 11/19/2026