UT FLAP SLA 10(1) Mill Creek Canyon Road
| Agency: | TRANSPORTATION, DEPARTMENT OF |
|---|---|
| State: | Utah |
| Type of Government: | Federal |
| FSC Category: |
|
| NAICS Category: |
|
| Posted Date: | Nov 20, 2024 |
| Due Date: | Nov 12, 2024 |
| Solicitation No: | 6982AF24B000015 |
| Original Source: | Please Login to View Page |
| Contact information: | Please Login to View Page |
| Bid Documents: | Please Login to View Page |
Description
APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.
APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.
The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).
- Contract Opportunity Type: Solicitation (Updated)
- Updated Published Date: Nov 20, 2024 11:29 am MST
- Original Published Date: Sep 20, 2024 05:54 am MDT
- Updated Date Offers Due: Nov 12, 2024 02:00 pm MST
- Original Date Offers Due: Nov 05, 2024 02:00 pm MST
- Inactive Policy: 15 days after date offers due
- Updated Inactive Date: Nov 27, 2024
- Original Inactive Date: Nov 20, 2024
-
Initiative:
- None
- Original Set Aside:
- Product Service Code: Y1LB - CONSTRUCTION OF HIGHWAYS, ROADS, STREETS, BRIDGES, AND RAILWAYS
-
NAICS Code:
- 237310 - Highway, Street, and Bridge Construction
-
Place of Performance:
Millcreek , UTUSA
SOLICITATION TYPE: FULL AND OPEN COMPETITION with HubZone Preference
PROJECT NUMBER: UT FLAP SLA 10(1)
PROJECT NAME: MILL CREEK CANYON ROAD
PROJECT DESCRIPTION:
Mill Creek Canyon Road provides access to recreational sites in the Uinta-Wasatch-Cache National Forest from 3800 S. Wasatch Boulevard to the Upper Big Water Trailhead. The purpose of the project is to improve safety, improve access to high quality recreational opportunities, and protect the water and wildlife resources through natural resources best practices. Mill Creek Canyon Road is located within Salt Lake County in northern Utah. The majority of the road is located within the Unita-Wasatch-Cache National Forest but is maintained by Salt Lake County.
The project consists of reconstruction and widening of Mill Creek Canyon Road from Big Water Trailhead to Elbow Fork (3.1 miles) to a 20-foot paved width and from Elbow Fork to Winter Gate (1.4 miles) to 24-foot paved width. Improve pertinent picnic area parking and trailhead areas, including, Big Water Trailhead, Alexander Basin, Clover Springs Picnic Area, Fir Crest Picnic Area, Elbow Fork, and Winter Gate (Maple Cove) parking/trailheads.
To complete the proposed widening and realignment, timber removal, rock and soil cuts and fills, profile adjustments, curve widening, ditch reconstruction, retaining walls, culvert replacement, asphalt surfacing, erosion control, singing, and pavement markings are expected. Due to the mountainous terrain, significant boulders and areas with noted seepage or soft subgrade will be encountered. The project also includes drainage improvements consisting of extending existing box culverts with headwalls and wingwalls, replacement of the White Bridge box culvert, installation of a new Mill Creek box culvert, ditch or curb and gutter establishment, vegetated swales, and water quality basins. The project also includes installation of parking area vault toilets and 3-inch diameter electrical conduit and 2-inch diameter communications conduit with pull boxes below the roadway to support future utilities. An estimated eight retaining walls are proposed along the road or at parking areas to stabilize steep slopes and minimize the overall disturbance footprint.
PRINCIPAL WORK ITEMS:
- 20101-0000 Clearing and Grubbing, 31.6 ACRE
- 20401-0000 Roadway Excavation: 53,500 CUYD
- 25201-0000 Special Rock Embankment 5,500 CUYD
- 252201-0000 Rockery (Retaining Wall) 3,100 SQFT
- 25902-0000 Soil Nail Retaining Wall 9,000 SQFT
- 30101-0000 Aggregate Base: 25,000 TON
-
40101-5600 Asphalt Concrete Pavement, Gyratory Mix, ½-Inch or ¾-Inch Nominal Maximum Size Aggregate, 0.3 to
- 60201-Various – CMP: 1,425 LNFT
- 60220-0000 Precast Reinforced Concrete Box Culvert: 140 LNFT
- 63501-0000 Temporary Traffic Control: LPSM
ANTICIPATED SCHEDULE:
Advertisement – September 2024
Award – October 2024
NTP – January 2025
Winter Shutdown – November 2025 to April 2026
Contract Completion – October 2026
ESTIMATED COST RANGE:
Schedule A estimated total cost is between $20,000,000 and $30,000,000
NON-MANDATORY PRE-BID SITE VISIT:
Representatives from the Federal Highway Administration (FHWA) will conduct a meeting on Tuesday, October 8, 2024, from 9:00 a.m. to approximately 1:00 p.m. FHWA will provide a brief project presentation, a driving tour stopping at various locations to present design elements along the route and be available to answer questions for the balance of the time period.
Access to the project roadways are not restricted to the public during the site visit, please provide your own transportation and personal protective equipment. Tour stopping locations have limited parking, please consolidate vehicles to the extent practical.
Interested parties will meet at the Maple Grove Picnic Area/Winter Gate of Mill Creek Canyon Road, approximately 4.7 miles east of the intersection of Wasatch Blvd and 3800S (Mill Creek Canyon Road) Mill Creek, UT, at 9:00 a.m.
If you would like to attend the pre-bid meeting, please email to cflcontracts@dot.gov by Friday, October 4, 2024.
ATTENDANCE AT THE PROJECT PRE-BID MEETING IS NOT MANDATORY TO BID THE PROJECT AND ACCESS TO THE SITE WILL BE AVAILABLE THROUGHOUT THE SOLICITATION PERIOD.
- 12300 W. DAKOTA AVE
- LAKEWOOD , CO 80228
- USA
- Kelly Palmer
- cflacquisitions@dot.gov
- Phone Number 720-963-3500
- Leslie Karsten
- CflContracts@dot.gov
- Nov 20, 2024 11:29 am MSTSolicitation (Updated)
- Nov 12, 2024 02:24 pm MST Solicitation (Updated)
- Nov 07, 2024 08:28 am MST Solicitation (Updated)
- Nov 04, 2024 06:30 am MST Solicitation (Updated)
- Oct 31, 2024 03:13 pm MDT Solicitation (Updated)
- Oct 25, 2024 12:45 pm MDT Solicitation (Updated)
- Oct 15, 2024 01:15 pm MDT Solicitation (Updated)
- Oct 09, 2024 10:14 am MDT Solicitation (Updated)
- Oct 08, 2024 12:58 pm MDT Solicitation (Updated)
- Sep 23, 2024 07:34 am MDT Solicitation (Updated)
- Sep 20, 2024 09:55 pm MDT Presolicitation (Original)
- Sep 20, 2024 05:54 am MDT Solicitation (Original)
Related Document
| Sep 20, 2024 | [Solicitation (Original)] UT FLAP SLA 10(1) Mill Creek Canyon Road |
| Sep 23, 2024 | [Solicitation (Updated)] UT FLAP SLA 10(1) Mill Creek Canyon Road |
| Oct 8, 2024 | [Solicitation (Updated)] UT FLAP SLA 10(1) Mill Creek Canyon Road |
| Oct 9, 2024 | [Solicitation (Updated)] UT FLAP SLA 10(1) Mill Creek Canyon Road |
| Oct 15, 2024 | [Solicitation (Updated)] UT FLAP SLA 10(1) Mill Creek Canyon Road |
| Oct 26, 2024 | [Solicitation (Updated)] UT FLAP SLA 10(1) Mill Creek Canyon Road |
| Nov 1, 2024 | [Solicitation (Updated)] UT FLAP SLA 10(1) Mill Creek Canyon Road |
| Nov 4, 2024 | [Solicitation (Updated)] UT FLAP SLA 10(1) Mill Creek Canyon Road |
| Nov 7, 2024 | [Solicitation (Updated)] UT FLAP SLA 10(1) Mill Creek Canyon Road |
| Nov 12, 2024 | [Solicitation (Updated)] UT FLAP SLA 10(1) Mill Creek Canyon Road |
See Also
Project: Multiple Mountain View Corridor Sewer Projects Contractor Prequalification Ref. #: 901 Department:
State Government of Utah
Due by 9/15/2026
Project: NS27-109 Tooele County School District - Copper Canyon Elementary Fencing Upgrades Ref.
State Government of Utah
Due by 9/29/2026
Project: DFCM Construction - Prequalified General Stage II - General- New Storage Building
State Government of Utah
Due by 10/08/2026
Project: SLCo FAC133816 Midvale Campus Renovation General Contractor Selection Stage 1 - RFQ
State Government of Utah
Due by 9/23/2026