| Agency: | Gurnee village |
|---|---|
| State: | Illinois |
| Type of Government: | State & Local |
| NAICS Category: |
|
| Posted Date: | Jul 27, 2026 |
| Due Date: | Jul 30, 2026 |
| Original Source: | Please Login to View Page |
| Contact information: | Please Login to View Page |
| Bid Documents: | Please Login to View Page |
Village of Gurnee
Notice to Bidders
UST System Replacement Project (#304-01)
Download the Bid Packet for complete details.
TIME AND PLACE OF OPENING OF BIDS:
Sealed proposals for the improvement described below will be received at the office of the Village of Gurnee,
Public Works, 1151 Kilbourne Road, Gurnee, Illinois 60031, until 10:00 A.M., on JULY 30, 2026. Proposals will be
opened and read publicly at that time.
“Village of Gurnee Public Works, UST System Replacement Project”
LOCATION:
The project is located at 1151 Kilbourne Road, Gurnee, Illinois 60031.
beginning at the Public Works offices, 1151 Kilbourne Road, Gurnee, Illinois 60031.
BIDDERS INSTRUCTIONS:
PROJECT SPECIFICATIONS FOR:
UST SYSTEM REPLACEMENT PROJECT
VILLAGE OF GURNEE
PUBLIC WORKS FACILITY
1151 KILBOURNE ROAD
GURNEE, ILLINOIS
PROJECT NO. 304-01
PREPARED FOR:
VILLAGE OF GURNEE
325 NORTH O'PLAINE ROAD
GURNEE, ILLINOIS 60031
JULY 9, 2026
PREPARED BY:
MJR Environmental Services, Inc.
Engineering, Design, Project Management
TABLE OF CONTENTS
PROJECT SPECIFICATIONS FOR:
OWNER: VILLAGE OF GURNEE
325 NORTH O'PLAINE ROAD
GURNEE, ILLINOIS 60031
BID FOR: UST SYSTEM REPLACEMENT WORK
PROJECT: VILLAGE OF GURNEE
PUBLIC WORKS FACILITY
1151 KILBOURNE ROAD
GURNEE, ILLINOIS
ENVIRONMENTAL
CONSULTANT: MJR ENVIRONMENTAL, INC.
31 HILLCREST DRIVE
SUGAR GROVE, ILLINOIS 60554
(630) 253-3375
PROJECT NO.: 304-01
DATE: JULY 9, 2026
DIVISION 0 - BIDDING AND CONTRACT REQUIREMENTS
SECTION Notice to Bidders N-1
Proposal (Bid Form) P-1-5
Bid Bond BB-1-3
List of Subcontractors and Suppliers SS-1
References REF-1
Performance Bond PFB-1-4
Payment Bond PYB-1-5
Instructions to Bidders IB-1-4
General Conditions of the Contract GC-1-10
DIVISION 1 - GENERAL REQUIREMENTS
SECTION 001010 - Project Summary 001010-1-8
001310 - Project Management and Coordination 001310-1-5
DIVISION 2 - SITE WORK
SECTION 002080 - UST System Removal Work 002080-1-14
002081 - Soil Remediation Work 002081-1-10
002082 - UST System Installation Work 002082-1-24
003001 - Concrete Work 003001-1-6
131250 - Canopy Installation and Features 131250-1-5
Table of Contents July 9, 2026
UST System Replacement Work Village of Gurnee Public Works
TOC-1
LIST OF DRAWINGS
C-1 - Area Location Map
C-2 - Site Plan
UST-1 - UST System Removal Plan
UST-2 - UST System Installation Plan
UST-3 - UST System Installation Sections and Details
EXHIBITS
Exhibit A - Geo-Technical Subsurface Soil Report
Exhibit B - IEPA CCDD Soil Report and Certification
Table of Contents July 9, 2026
UST System Replacement Work Village of Gurnee Public Works
TOC-2
| VILLAGE OF GURNEE NOTICE TO BIDDERS | Municipality: VILLAGE OF GURNEE Road District WARREN County LAKE Project No. 304-01 |
|---|
Municipality: VILLAGE OF GURNEE
VILLAGE OF GURNEE Road District WARREN
County LAKE
NOTICE TO BIDDERS Project No. 304-01
TIME AND PLACE OF OPENING OF BIDS:
Sealed proposals for the improvement described below will be received at the office of the Village of Gurnee,
Public Works, 1151 Kilbourne Road, Gurnee, Illinois 60031, until 10:00 A.M., on JULY 30, 2026. Proposals will be
opened and read publicly at that time.
DESCRIPTION OF WORK:
"Village of Gurnee Public Works, UST System Replacement Project"
LOCATION:
The project is located at 1151 Kilbourne Road, Gurnee, Illinois 60031.
PROPOSED IMPROVEMENT:
The work of this Contract will include the removal of concrete and asphalt pavement, the removal of one (1),
8,000-gallon gasoline UST system, one (1), 6,000-gallon diesel fuel UST system, all fuel island features and the
fuel island, soil remediation work, demolition and removal of the existing canopy structure, and other features
from the south side of the Village of Gurnee Public Works Facility. The work will also include the installation
of one (1), new, 12,000-gallon double-wall FRP gasoline UST system, one (1), new, 8,000-gallon double-wall
FRP diesel fuel UST system, with new product piping and dispensers, new raised concrete fuel island, new fuel
management system, new fuel island canopy, and other features specified herein at the north side of the Village
of Gurnee Public Works Facility. A mandatory Pre-Bid Meeting is scheduled for July 16, 2026 at 1:00 p.m.
beginning at the Public Works offices, 1151 Kilbourne Road, Gurnee, Illinois 60031.
BIDDERS INSTRUCTIONS:
1. Plans and bid documents will be online at https://www.gurnee.il.us/government/transparency-portal/bids-
rfps or by request, via email to publicworks@village.gurnee.il.us.
2. It will be the bidder's responsibility to verify any addenda via the Village's website. Addenda will be
posted to the Village's Transparency Portal.
3. The awarding authority reserves the right to waive technicalities and to reject any or all proposals as
provided in Check Sheet LRS 6 of the "Supplemental Specifications and Recurring Special Provisions,"
prepared by the Illinois Department of Transportation.
4. Contractor shall not pay less than the prevailing rates of wages to all laborers, workmen and mechanics
performing work under this contract, and shall comply with the requirements of the Illinois Wages of
Employees on Public Works Act (820 ILCS 130/1-12).
By Order Of The:
Village of Gurnee
(Awarding Authority)
Andy Harris / Village Clerk
N-1
| VILLAGE OF GURNEE PROPOSAL (BID FORM) | Municipality: VILLAGE OF GURNEE Road District WARREN County LAKE Project No. 304-01 |
|---|
Municipality: VILLAGE OF GURNEE
VILLAGE OF GURNEE
Road District WARREN
County LAKE
PROPOSAL (BID FORM)
Project No. 304-01
1. Proposal of (Bidders Legal Name): for the
Village of Gurnee Public Works, UST System Replacement Project, which the contract is based on
the lump sum price entered below.
2. The specifications for the proposed work are those prepared by the Village of Gurnee Public Works,
1151 Kilbourne Road, Gurnee, Illinois 60031 in collaboration with MJR Environmental, Inc.
(Environmental Consultant).
3. The specifications referred to herein are the notes on the Plans, the General Conditions of the Contract,
2012 International Building Code, 2012 International Mechanical Code, 2012 International Fuel Gas Code,
2012 International Fire Code, 2012 International Wildland Urban Interface Code, State of Illinois Plumbing
Code, 2002 National Electric Code, Illinois Accessibility Code, ADA Accessibility Guidelines for
Buildings and Facilities, Village of Gurnee Zoning Ordinance and the Village of Gurnee Municipal Code,
and all standards and codes listed in the technical sections of these Specifications; latest editions effective
upon the date of the bid opening, which are made part of these documents by reference. In case of conflict
between these Specifications, the most restrictive requirement shall be binding.
4. The undersigned agrees to accept, as part of the contract, the applicable Specifications, General Conditions
of the Contact and any Special Provisions contained in this proposal.
5. The undersigned agrees to start work only upon receiving a "Notice to Proceed" letter from the Village of
Gurnee for each year under contract.
6. The undersigned agrees to complete the work by May 14, 2027 unless additional time is granted in
accordance with the specifications. Refer to Section 001010 for additional scheduling details.
7. The undersigned agrees to liquidated damages at a rate of $750 per day for failure to complete the work in
readiness for final payment by May 14, 2027. Refer to Section 001010 for additional scheduling details.
8. The pay items shall consist of two (2) lump sum entries, and a lump sum total.
9. The undersigned firm certifies that it has not been convicted of bribery or attempting to bribe an officer or
employee of the State of Illinois, nor has the firm made an admission of guilt of such conduct which is a
matter of record, nor has an official, agent or employee of the firm committed bribery or attempted bribery
on behalf of the firm and pursuant to the direction or authorization of a responsible official of the firm.
The undersigned firm further certifies that it is not barred from bidding on this contract as a result of a
conviction for the violation of State laws prohibiting bid-rigging or bid-rotating.
P-1
10. The undersigned submits herewith the "Schedule of Prices" covering the work to be performed under this
contract. (Page P-3, P-4, and P-5).
11. The following documents are submitted with and made a condition of this Proposal:
a. Required Bid Security;
b. List of Proposed Subcontractors;
c. List of Proposed Suppliers;
d. List of References
e. Performance Bond
f. Payment Bond
The undersigned acknowledges receipt of the bid documents (Project Specifications) for the work indicated
above, including all Division 0 Sections, this Proposal/Bid Form, Division 1 Sections, UST System Removal
Work (Section 002080), Soil Remediation Work (Section 002081), UST System Installation Work (Section
002082), Concrete Work (Section 003001), Canopy Installation and Features (Section 131250), the Project
Drawings, all specified and/or referenced documents as listed herein, and all Addenda.
The Undersigned Agrees to:
The undersigned has, before submitting this proposal, carefully examined the provisions of the contract,
inspected in detail the site of the proposed work, investigated and become familiar with all the local conditions
affecting the contract and is fully acquainted with the detailed requirements of the construction. By submitting
this proposal, the undersigned conclusively assures and warrants to the Village of Gurnee that the undersigned
has made these examinations and that the undersigned understands all requirements for the performance of
the work. If the undersigned's proposal is accepted, the undersigned agrees to be responsible for all errors in
the proposal resulting from the undersigned's failure or neglect to comply with the Instructions for Bidders
and agrees that the Village of Gurnee will, in no case, be responsible for any costs, expenses, losses, or change
in anticipated profits resulting from such failure or neglect of the undersigned to make these examinations.
The undersigned agrees to provide submittals within fourteen (14) calendar days of the acceptance of the bid
proposal by the Village of Gurnee. Upon approval of submittals, the first phase of work shall commence upon
receipt of a Contract and as new key equipment items can be delivered for installation. The second phase of
work shall commence on or about March 15, 2027 and shall be completed on or before May 14, 2027, unless
an extension of time is granted in accordance with the specifications. Refer to Section 001010 for additional
scheduling details.
A proposal guaranty in the form of a bid bond (refer to Page BB-1 of these Specifications), executed by a
corporate surety company, a bank cashier's check or a certified check payable to the Village of Gurnee for
not less than five percent (5%) of the amount bid accompanies this proposal.
If this proposal is accepted and the undersigned fails to execute the contract, it is hereby agreed that the Bid
Bond or proposal guaranty check shall be forfeited to the Village of Gurnee.
Bidder's Acknowledgements: Acceptance Period, Instructions, and Receipt of Addenda
P-2
Bid Acceptance Period:
This Bid will remain subject to acceptance for sixty (60) days after the Bid opening, or for such longer
period of time that Bidder may agree to in writing upon request of Owner.
Instructions to Bidders:
Bidder accepts all of the terms and conditions of the Instructions to Bidders, including without
limitation those dealing with the disposition of Bid security.
Receipt of Addenda:
Bidder hereby acknowledges receipt of the following Addenda:
Addendum Number: Addendum Date:
Having examined the site of work, having become familiar with local conditions affecting the cost of the work
and with all requirements of the bidding documents including the Project Manual, Invitation to Bid,
Instructions to Bidders, Supplementary Instructions to Bidders, General Conditions, Technical Specifications,
Project Drawings, and duly issued Addenda, Bidder hereby agrees to perform all work and furnish all labor,
materials, and equipment specifically required by the bidding documents, including such additional work as
may be included as related requirements in other divisions or sections of the Specifications. To furnish the
described labor, materials, equipment, services, insurance, etc. for the stated Base Bid lump sum prices, the
requested allowances, all unit prices, and requested Alternate Bids, if applicable, as requested in this Bid
Form.
Schedule of Prices:
A. Base Bid:
1. The Bidder agrees to furnish all labor, materials, tools, equipment, insurance, services, etc. to fully
complete all work associated with the removal of one (1), 8,000-gallon gasoline UST system and
one (1), 6,000-gallon diesel fuel UST system, including concrete and asphalt pavement saw-cutting
and removal as specified, earthwork, including soil remediation (510 tons) and removal of
stockpiled soil from exclusion zone at new UST area (150 tons), backfill and site grading, removal
of all product and vent piping, vent line risers, existing fuel island and product dispensers, related
conduit, and other surface features, as specified herein and as shown on the Project Drawings.
Provide Base Bid Total (Base Bid Item A.1):
_____________________________________________________dollars ($________________)
P-3
2. The Bidder agrees to furnish all labor, materials, tools, equipment, insurance, services, etc. to fully
complete all work associated with the installation of one (1), new, 12,000-gallon double-wall FRP
gasoline UST system, one (1), new, 8,000-gallon double-wall FRP diesel fuel UST system, with
new product piping and dispensers, new raised concrete fuel island, new fuel management system,
new fuel island canopy, as specified herein and as shown on the Project Drawings.
Provide Base Bid Total (Base Bid Item A.2):
_____________________________________________________dollars ($________________)
PROVIDE BASE BID GRAND TOTAL (BASE BID ITEM A.1 AND A.2):
___________________________________________________DOLLARS ($______________)
B. Alternate Bid:
1. The Village of Gurnee is not requesting any Alternate Bids at this time.
C. Unit Prices:
Provide Unit Prices for the following work which may or may not occur during the course of the project:
1. Provide all services necessary, as requested,
and in accordance with these Specifications, to
perform additional pumping, transport, and disposal
as special liquid waste, residual product from within
the existing USTs and/or as impacted groundwater or
surface water run-off beyond (or less than) the
2,000-gallon Base Bid allowance noted in Section
002080 (Include all additional pumping, transport, and
disposal as per gallon price (add to/deduct from Base Bid
A.1 sum) (applies to both UST systems): $____________
add/deduct
per gallon
2. Provide all services necessary, only as requested,
and in accordance with these Specifications and
regulatory agencies, to perform the remediation
of confirmed petroleum-impacted backfill materials
and soil during/following the removal of the UST
systems, per Section 002081, including landfill
profiling (if needed), all excavation work, transport,
and manifested disposal beyond (or less than) the
660-ton Base Bid allowance (add to/deduct from
Base Bid A.1 sum) (applies to both UST systems): $____________
add per ton
P-4
3. Provide all services necessary, as requested,
and in accordance with these Specifications, to
perform additional gravel backfill installation
per Sections 002080 or 002081 beyond the
Base Bid scope of work (add to Base Bid A.1
sum): $____________
add per ton
Signatures:
(If a partnership)
__________________________________________________
(Company Name)
__________________________________________________
(Signed By)
__________________________________________________
(Business Address)
__________________________________________________
__________________________________________________
(Insert Names/Addresses of All Partners)
__________________________________________________
__________________________________________________
__________________________________________________
(If a corporation)
__________________________________________________
(Corporate Name)
__________________________________________________
(Signed By)
__________________________________________________
(Business Address)
__________________________________________________
__________________________________________________
(Insert Names of Officers)
President:__________________________________________
Secretary:__________________________________________
Treasurer:__________________________________________
Attest:_____________________________________________
P-5
| Bidder Name: Address (principal place of business): | Surety Name: Address (principal place of business): |
|---|---|
| Owner Name: Village of Gurnee 325 North O'Plaine Road Gurnee, Illinois 60031 | Bid Project: Village of Gurnee Public Works UST System Replacement Project 1151 Kilbourne Road Gurnee, Illinois Bid Due Date: July 30, 2026, 10:00 a.m. |
| Bond Penal Sum: Date of Bond: | |
| Surety and Bidder, intending to be legally bound hereby, subject to the terms set forth in this Bid Bond, do each cause this Bid Bond to be duly executed by an authorized officer, agent, or representative. | |
| Bidder Surety (Full formal name of Bidder) (Full formal name of Surety) (corporate seal) By: By: (Signature) (Signature) (Attach Power of Attorney) Name: Name: (Printed or typed) (Printed or typed) Title: Title: Attest Attest: (Signature) (Signature) Name: Name: (Printed or typed) (Printed or typed) Title: Title: | |
| Notes: (1) Note: Addresses are to be used for giving any required notice. (2) Provide execution by any additional parties, such as joint venturers, if necessary. |
VILLAGE OF GURNEE PUBLIC WORKS
UST SYSTEM REPLACEMENT PROJECT
BID BOND
Bidder Surety
Name: Name:
Address (principal place of business): Address (principal place of business):
Owner Bid
Name: Project:
Village of Gurnee Village of Gurnee Public Works
325 North O'Plaine Road
UST System Replacement Project
Gurnee, Illinois 60031 1151 Kilbourne Road
Gurnee, Illinois
Bid Due Date: July 30, 2026, 10:00 a.m.
Bond
Penal Sum:
Date of Bond:
Surety and Bidder, intending to be legally bound hereby, subject to the terms set forth in this
Bid Bond, do each cause this Bid Bond to be duly executed by an authorized officer, agent, or
representative.
Bidder Surety
(Full formal name of Bidder) (Full formal name of Surety) (corporate seal)
By: By:
(Signature) (Signature) (Attach Power of Attorney)
Name: Name:
(Printed or typed) (Printed or typed)
Title: Title:
Attest
Attest:
(Signature) (Signature)
Name: Name:
(Printed or typed) (Printed or typed)
Title: Title:
Notes: (1) Note: Addresses are to be used for giving any required notice. (2) Provide execution by any additional parties, such as
joint venturers, if necessary.
BB-1
With Free Trial, you can:
You will have a full access to bids, website, and receive daily bid report via email and web.
Project: Modernization of Elevators at CCB, CCAB, and DVC (RFP) Ref. #: 2615-02205
Cook County
Bid Due: 8/05/2026
Project: Signal Upgrades for Milwaukee District West Elgin Subdivision Ref. #: RFP 191763
Metra Rail
Bid Due: 8/07/2026
Follow Sludge Removal Active Contract Opportunity Notice ID FA440726QTW14 Related Notice Department/Ind. Agency
DEPT OF DEFENSE
Bid Due: 8/04/2026
Follow Z1DA--Security Upgrades Jesse Brown VA Medical Center Active Contract Opportunity Notice ID
VETERANS AFFAIRS, DEPARTMENT OF
Bid Due: 9/03/2026