USCGC Scioto Starboard Main Diesel Engine
| Agency: | HOMELAND SECURITY, DEPARTMENT OF |
|---|---|
| State: | Iowa |
| Type of Government: | Federal |
| FSC Category: |
|
| NAICS Category: |
|
| Set Aside: | Total Small Business Set-Aside (FAR 19.5) |
| Posted Date: | May 19, 2025 |
| Due Date: | May 23, 2025 |
| Solicitation No: | 70Z08525Q0019310 |
| Original Source: | Please Login to View Page |
| Contact information: | Please Login to View Page |
| Bid Documents: | Please Login to View Page |
Description
- Contract Opportunity Type: Special Notice (Original)
- Original Published Date: May 19, 2025 11:19 am PDT
- Original Response Date: May 23, 2025 08:00 am PDT
- Inactive Policy: 15 days after response date
- Original Inactive Date: Jun 07, 2025
-
Initiative:
- None
- Original Set Aside: Total Small Business Set-Aside (FAR 19.5)
- Product Service Code: J020 - MAINT/REPAIR/REBUILD OF EQUIPMENT- SHIP AND MARINE EQUIPMENT
-
NAICS Code:
- 336611 - Ship Building and Repairing
-
Place of Performance:
Keokuk , IA 52632USA
For informational purposes only. This will be awarded Sole source.
STATEMENT OF WORK (SOW)
FOR
USCGC SCIOTO #1 MDE Troubleshoot and Repair
SCIOTO experienced a Main Diesel Engine shutdown and recorded low coolant level, suspecting a head leak and low compression and has an immediate need for technical support for tasks outlined in this Statement of Work (SOW).
1.0 GENERAL
-
- Background
The 65’ WLR asset, USCGCSCIOTO, is experiencing Main Diesel Engine issues as well as coolant leaking into the Main and requires qualified technical representative to troubleshoot and repair the issue.
-
- Scope
The scope of this contract is defined by the efforts and tools required to support USCGC SCIOTO (WLR 65504). The Contractor shall provide all labor, materials, and tools necessary to repair the MDE.
-
- OBJECTIVE
The goal is to return CGC SCIOTO’s Isotta Franschinni Main Diesel Engine to designed system parameters.
-
- APPLICABLE DOCUMENTS
-
-
- Compliance Documents
-
The following documents provide specifications, standards, or guidelines that must be complied with in order to meet the requirements of this contract:
Surface Forces Logistics Center Standard Specification (SFLC Std Spec) 0000, 2020, General Requirements
- SPECIFIC REQUIREMENTS/TASKS
Unless otherwise stated, this contract applies to on-site support for USCGC SCIOTO (WLR 65504) in Keokuk IA.
2.1 Renew Rudder Seal
The Contractor shall perform any inspections or evaluations, as deemed necessary, to determine best path forward prior to commencing work.
-
-
- The Contractor shall inspect, troubleshoot, and repair the MDE leaking coolant IAW OEM Specifications.
- The Contractor shall preform operation test of Main Diesel Engine once repair is complete.
-
2.2 Test Thoroughly and Document
The Contractor shall ensure the system is fully functional by preforming a system operational test to be witnessed by Engineer Petty Officer (EPO) or the EPO’s designated representative.
2.2.1 The Contractor shall provide a trip report documenting all findings no later than 48 hours after returning to the home office.
- CONTRACTOR PERSONNEL
3.1 The Contractor shall provide qualified personnel to perform all requirements specified in this SOW.
- OTHER APPLICABLE CONDITIONS
4.1 PERIOD of Performance
The period of performance for this contract shall not exceed 3 calendar days from the date of award.
4.2 PLACE OF PERFORMANCE
The primary place of performance will be at CGC SCIOTO at 221 Mississippi Drive, Keokuk IA 52632 unless an alternate location is approved by the Coast Guard.
4.3 HOURS OF OPERATION
Contractor employees shall generally perform all work between the hours of 0730 and 1600 EST, Monday through Friday (except Federal holidays). However, there may be occasions when Contractor employees shall be required to work other than normal business hours, including weekends and holidays, to fulfill requirements under this SOW. Precise times may be negotiated with the cutter Engineer Petty Officer (EPO) as scheduling is subject to ship’s operations.
4.5 Daily Progress Reports
The Contractor shall hold a daily progress meeting with the Engineer Petty Officer and/or Commanding Officer upon arrival at the asset each morning of the visit. This report shall include a summary of all Contractor work performed, an assessment of technical progress, schedule status, and discuss any hazardous work conditions or necessary precautions the crew need to be made aware of prior to commencing work.
4.6 General Report Requirements
The Contractor shall provide all written reports in electronic format with read/write capability using applications that are compatible with DHS workstations (Windows and Microsoft Office Applications).
5.0 GOVERNMENT FURNISHED RESOURCES
NA
6.0 CONTRACTOR FURNISHED PROPERTY
The Contractor shall furnish all materials, equipment, and services necessary to fulfill the requirements of this contract, except for the Government Furnished Resources specified in Section 5.0.
- GOVERNMENT ACCEPTANCE PERIOD
The EPO will inspect deliverables prior to acceptance and provide the contractor with an e-mail that provides documented reasons for non-acceptance. If the deliverable is acceptable, the EPO will send an e-mail to the Contractor notifying it that the deliverable has been accepted.
8.0 DELIVERABLES
The Contractor shall provide a trip report IAW 2.2 of this SOW.
- COAST GUARD ISLAND, BLDG 50-7
- ALAMEDA , CA 94501
- USA
- Justin Wooldridge
- justin.r.wooldridge@uscg.mil
- Phone Number (206) 820-5327
- Lindsay Mongiovi
- lindsay.n.mongiovi@uscg.mil
- Phone Number 5716086752
- May 19, 2025 11:19 am PDTSpecial Notice (Original)
See Also
Bid Information Type Request for Proposal (Public) Status Issued Number RFQ-1001509 (Articulated Loader
Iowa State University
Due by 9/17/2026
Bid Information Type Request for Bid Status Issued Number PUR0826-056 (Boiler System Replacement
City of Cedar Rapids
Due by 9/25/2026
Follow Notice of Intent to award a sole-source contract Active Contract Opportunity Notice
DEPT OF DEFENSE
Follow Bldg. 154 - Boiler #3 Refractory Repair Active Contract Opportunity Notice ID
AGRICULTURE, DEPARTMENT OF
Due by 9/18/2026