USCGC Healy Relief Valves Overhaul
| Agency: | HOMELAND SECURITY, DEPARTMENT OF |
|---|---|
| State: | Washington |
| Type of Government: | Federal |
| FSC Category: |
|
| NAICS Category: |
|
| Set Aside: | Total Small Business Set-Aside (FAR 19.5) |
| Posted Date: | Sep 23, 2026 |
| Due Date: | Sep 28, 2026 |
| Solicitation No: | 70Z08526Q0028500 |
| Original Source: | Please Login to View Page |
| Contact information: | Please Login to View Page |
| Bid Documents: | Please Login to View Page |
Description
APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.
APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.
The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).
- Contract Opportunity Type: Combined Synopsis/Solicitation (Original)
- Original Published Date: Sep 23, 2026 09:42 am PDT
- Original Date Offers Due: Sep 28, 2026 08:00 am PDT
- Inactive Policy: 15 days after date offers due
- Original Inactive Date: Oct 13, 2026
-
Initiative:
- None
- Original Set Aside: Total Small Business Set-Aside (FAR 19.5)
- Product Service Code: J020 - MAINT/REPAIR/REBUILD OF EQUIPMENT- SHIP AND MARINE EQUIPMENT
-
NAICS Code:
- 336611 - Ship Building and Repairing
-
Place of Performance:
Seattle , WA 98134USA
STATEMENT OF WORK (SOW)
Vessel: USCGC HEALY (WAGB 20)
Project: Relief Valves Overhaul
1.0 SCOPE
Requirements for the inspection, overhaul, and testing of two (2) relief valves, Part Number:
S8LJE-02RF1-03RF1-SS-H2-TB, belonging to the United States Coast Guard Cutter
(USCGC) HEALY, homeported in Seattle, WA.
Location: Contractor’s Facility.
2.0 BACKGROUND
USCGC HEALY requires routine periodic maintenance and overhaul of mechanical systems
to ensure operational readiness and safety. The specified relief valve requires a full
overhaul, including the replacement of all soft goods, reassembly, and testing to restore it
to Original Equipment Manufacturer (OEM) specifications.
3.0 REFERENCES
The Contractor shall adhere to the following references during the performance of this
work:
3.1 Original Equipment Manufacturer (OEM) Technical Manuals and specifications for
PN: S8LJE-02RF1-03RF1-SS-H2-TB.
3.2 U.S. Coast Guard Standard Specification (CG-47) - General Requirements for Ship
Repair.
4.0 TECHNICAL REQUIREMENTS CLIN 001
The Contractor shall provide all labor, materials, equipment, and facilities necessary to
perform the following:
4.1 Disassembly and Cleaning
Carefully disassemble the relief valve in accordance with OEM guidelines.
Thoroughly clean all internal and external components to remove scale, debris, and
marine growth without damaging the base metal or seating surfaces.
4.2 Inspection
Perform a visual and dimensional inspection of all hard parts (body, spring, stem,
disc, nozzle, etc.).
Identify any wear, pitting, scoring, or damage that exceeds OEM tolerances.
Deliverable: Submit a Condition Found Report (CFR) to the Coast Guard Technical
Point of Contact (TPOC) detailing the inspection results and recommending any
additional repairs or replacement of hard parts prior to proceeding.
4.3 Overhaul and Reassembly
Upon approval of the CFR, replace all soft goods (including O-rings, gaskets,
packing, and seals) using 100% genuine OEM replacement parts.
Machine or lap seating surfaces as necessary to achieve a proper seal, strictly
within OEM tolerances.
Reassemble the valve in accordance with OEM specifications, applying the correct
torque values to all fasteners.
4.4 Testing and Calibration
Perform hydrostatic shell testing and seat leakage testing in accordance with
applicable OEM and industry standards.
Set, calibrate, and pop-test the relief valve to the designated set pressure required
by the ship's system parameters.
A??ix a new metallic calibration tag to the valve indicating the set pressure, test date,
and contractor identification.
Deliverable: Provide a certified Test Report documenting the set pressure, pop
pressure, reseat pressure, and confirmation of zero leakage.
5.0 GOVERNMENT FURNISHED PROPERTY (GFP)
The Coast Guard will provide the following:
Two (2) Relief Valve, PN: S8LJE-02RF1-03RF1-SS-H2-TB. USCG will ship valves to the
contractor. Contractor is responsible for shipment of valves to USCG Base Seattle
via two-day delivery methods.
6.0 Period of Performance: within 15 days from the award.
6.1 CLIN 0002: Potential Repairs based on CFR not to exceed ($1,500 dollars)
6.2. Pricing for any additional travel costs, material, or field service days will be requested
and handled by the KO under the terms of the contract. Any repairs beyond the base scope
identified because of the troubleshooting shall be documented in a Condition Found
Report (CFR) with a technical description of the recommended repairs. The CFR shall be
provided to the Technical POCs and the Contracting O??icer.
6.3. Any additional work will be authorized only by the KO through a written contract
modification. The contractor shall not perform any repairs beyond the base scope until
specifically authorized in writing by the KO. If the Government elects to proceed with
additional repairs, the KO will issue a written contract modification that identifies the
authorized additional work and associated firm fixed price. The contractor shall base any
proposal for additional repairs on the findings in the CFR.
For questions regarding this SOW contact: MKCM Armando Perez @
Armando.perez@uscg.mil
- COAST GUARD ISLAND, BLDG 50-7
- ALAMEDA , CA 94501
- USA
- Justin Wooldridge
- justin.r.wooldridge2@uscg.mil
- Phone Number 2068205327
- Lindsay Mongiovi
- lindsay.n.mongiovi@uscg.mil
- Phone Number 5716086752
- Sep 23, 2026 09:42 am PDTCombined Synopsis/Solicitation (Original)
See Also
Number RFP 6637-26 Title General Repair and Maintenance of Light Duty Vehicles and
City of Spokane
Due by 11/10/2026
Follow Bravo Dive Boat 65DS1101 Active Contract Opportunity Notice ID N4523A26Q1110 Related Notice
DEPT OF DEFENSE
Due by 12/04/2026
Number ITB 6495-26 Title Scaffolding Services As-Needed For Boiler Maintenance Outages Scheduled and
City of Spokane
Due by 1/19/2027
Follow Maintenance, Repair, and Preservation of YON-325 Active Contract Opportunity Notice ID N4523A27Q1004
DEPT OF DEFENSE
Due by 11/18/2026