USCGC Gasconade SSDG Control Panel replacement
| Agency: | HOMELAND SECURITY, DEPARTMENT OF |
|---|---|
| State: | Missouri |
| Type of Government: | Federal |
| FSC Category: |
|
| NAICS Category: |
|
| Set Aside: | Total Small Business Set-Aside (FAR 19.5) |
| Posted Date: | Dec 23, 2025 |
| Due Date: | Jan 6, 2026 |
| Solicitation No: | 70Z08526Q0002157 |
| Original Source: | Please Login to View Page |
| Contact information: | Please Login to View Page |
| Bid Documents: | Please Login to View Page |
Description
APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.
APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.
The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).
- Contract Opportunity Type: Combined Synopsis/Solicitation (Original)
- Original Published Date: Dec 23, 2025 10:51 am PST
- Original Date Offers Due: Jan 06, 2026 08:00 am PST
- Inactive Policy: 15 days after date offers due
- Original Inactive Date: Jan 21, 2026
-
Initiative:
- None
- Original Set Aside: Total Small Business Set-Aside (FAR 19.5)
- Product Service Code: J020 - MAINT/REPAIR/REBUILD OF EQUIPMENT- SHIP AND MARINE EQUIPMENT
-
NAICS Code:
- 336611 - Ship Building and Repairing
-
Place of Performance:
Saint Louis , MO 63118USA
Statement of Work (SOW)
Project Title: Replacement, Installation, and Calibration of CAT 10R-9661 - Kit ELEK GP Controller on both SSDG’s aboard CGC GASCONADE
-
Background
The purpose of this project is to replace both existing controllers on the cutters SSDG’s with the CAT 10R-9661 - Kit ELEK GP, ensuring proper installation and calibration in accordance with the manufacturer's instructions. This work is critical to maintaining the operational efficiency and reliability of the equipment.
- Contractor Furnished Equipment
Qty 2 – CAT Kit ELEK GP – 10R-6991
3. Scope of Work
The contractor shall provide all necessary labor, tools, equipment, and expertise to perform the following tasks:
-
Removal of Old Controller:
- Safely disconnect and remove the existing controllers from the equipment.
- Ensure no damage is caused to surrounding components during removal.
-
Installation of New Controller:
- Install the CAT 10R-9661 - Kit ELEK GP controllers in accordance with the manufacturer's specifications.
- Verify that all connections are secure and properly aligned.
-
Calibration of Controller:
- Calibrate the newly installed controllers per the manufacturer's instructions.
- Ensure the controllers are functioning optimally and meets operational requirements.
4. Deliverables
The contractor shall provide the following:
- Two fully installed and calibrated CAT 10R-9661 - Kit ELEK GP controllers.
- Documentation of calibration settings and procedures performed.
- A brief report confirming the successful completion of the work and equipment functionality.
5. Period of Performance
The work shall be completed within 5 business days from the start date agreed upon by the contractor and the project manager.
6. Location of Work
The work will be performed at CGC GASCONADE, 100 Arsenal Street, ST. Louis MO, 63118
7. Contractor Responsibilities
The contractor shall:
- Comply with all safety regulations and standards during the execution of work.
- Provide qualified personnel to perform the tasks outlined in this SOW.
- Ensure all tools and equipment used are in good working condition.
8. Government Furnished Equipment (GFE)
None
9. Acceptance Criteria
The work will be considered complete when:
- The old controllers have been removed without damage to the equipment.
- The new controllers have been installed and calibrated per the manufacturer's instructions.
- The equipment is fully operational and meets performance standards.
10. Points of Contact
Questions related to anything listed within this statement of work, or access to the ship should be directed to: MKCS Matt Morin, 571-607-9267, matthew.j.morin@uscg.mil
- COAST GUARD ISLAND, BLDG 50-7
- ALAMEDA , CA 94501
- USA
- DONNA O'NEAL
- Donna.J.O'Neal@uscg.mil
- Phone Number 5103931145
- Lindsay Mongiovi
- lindsay.n.mongiovi@uscg.mil
- Phone Number 5716086752
- Dec 23, 2025 10:51 am PSTCombined Synopsis/Solicitation (Original)
See Also
Project:KSD 2026 Elevator Maintenance Agreement Details: The Kirkwood School District seeks proposals for
Kirkwood School District
Due by 10/06/2026
Bid Number: IFB 26-113 Bid Title: 26-113 Elevator Maintenance and Service - Per
St. Charles County
Due by 9/21/2026
RFP - HVAC Inspection + Preventive Maintenance and On Call Services Mission Parks
Drexel Technologies
Due by 9/17/2026
Follow Council Bluff Primary Electric And Well Improvements Active Contract Opportunity Notice ID
AGRICULTURE, DEPARTMENT OF
Due by 9/28/2026