USCGC Gasconade SSDG Control Panel replacement

Agency: HOMELAND SECURITY, DEPARTMENT OF
State: Missouri
Type of Government: Federal
FSC Category:
  • J - Maintenance, Repair, and Rebuilding of Equipment
NAICS Category:
  • 336611 - Ship Building and Repairing
Set Aside: Total Small Business Set-Aside (FAR 19.5)
Posted Date: Dec 23, 2025
Due Date: Jan 6, 2026
Solicitation No: 70Z08526Q0002157
Original Source: Please Login to View Page
Contact information: Please Login to View Page
Bid Documents: Please Login to View Page

Description

Follow
USCGC Gasconade SSDG Control Panel replacement
Active
Contract Opportunity
Notice ID
70Z08526Q0002157
Related Notice
Department/Ind. Agency
HOMELAND SECURITY, DEPARTMENT OF
Sub-tier
US COAST GUARD
Office
SFLC PROCUREMENT BRANCH 2(00085)
Looking for contract opportunity help?

APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.

APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.

The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).

General Information
  • Contract Opportunity Type: Combined Synopsis/Solicitation (Original)
  • Original Published Date: Dec 23, 2025 10:51 am PST
  • Original Date Offers Due: Jan 06, 2026 08:00 am PST
  • Inactive Policy: 15 days after date offers due
  • Original Inactive Date: Jan 21, 2026
  • Initiative:
    • None
Classification
  • Original Set Aside: Total Small Business Set-Aside (FAR 19.5)
  • Product Service Code: J020 - MAINT/REPAIR/REBUILD OF EQUIPMENT- SHIP AND MARINE EQUIPMENT
  • NAICS Code:
    • 336611 - Ship Building and Repairing
  • Place of Performance:
    Saint Louis , MO 63118
    USA
Description

Statement of Work (SOW)

Project Title: Replacement, Installation, and Calibration of CAT 10R-9661 - Kit ELEK GP Controller on both SSDG’s aboard CGC GASCONADE




  1. Background

    The purpose of this project is to replace both existing controllers on the cutters SSDG’s with the CAT 10R-9661 - Kit ELEK GP, ensuring proper installation and calibration in accordance with the manufacturer's instructions. This work is critical to maintaining the operational efficiency and reliability of the equipment.






  1. Contractor Furnished Equipment





Qty 2 – CAT Kit ELEK GP – 10R-6991





3. Scope of Work

The contractor shall provide all necessary labor, tools, equipment, and expertise to perform the following tasks:




  1. Removal of Old Controller:


    • Safely disconnect and remove the existing controllers from the equipment.

    • Ensure no damage is caused to surrounding components during removal.



  2. Installation of New Controller:

    • Install the CAT 10R-9661 - Kit ELEK GP controllers in accordance with the manufacturer's specifications.

    • Verify that all connections are secure and properly aligned.



  3. Calibration of Controller:

    • Calibrate the newly installed controllers per the manufacturer's instructions.

    • Ensure the controllers are functioning optimally and meets operational requirements.





4. Deliverables

The contractor shall provide the following:




  • Two fully installed and calibrated CAT 10R-9661 - Kit ELEK GP controllers.

  • Documentation of calibration settings and procedures performed.

  • A brief report confirming the successful completion of the work and equipment functionality.



5. Period of Performance

The work shall be completed within 5 business days from the start date agreed upon by the contractor and the project manager.



6. Location of Work

The work will be performed at CGC GASCONADE, 100 Arsenal Street, ST. Louis MO, 63118



7. Contractor Responsibilities

The contractor shall:




  • Comply with all safety regulations and standards during the execution of work.

  • Provide qualified personnel to perform the tasks outlined in this SOW.

  • Ensure all tools and equipment used are in good working condition.



8. Government Furnished Equipment (GFE)

None



9. Acceptance Criteria

The work will be considered complete when:




  • The old controllers have been removed without damage to the equipment.

  • The new controllers have been installed and calibrated per the manufacturer's instructions.

  • The equipment is fully operational and meets performance standards.



10. Points of Contact

Questions related to anything listed within this statement of work, or access to the ship should be directed to: MKCS Matt Morin, 571-607-9267, matthew.j.morin@uscg.mil


Attachments/Links
Contact Information
Contracting Office Address
  • COAST GUARD ISLAND, BLDG 50-7
  • ALAMEDA , CA 94501
  • USA
Primary Point of Contact
Secondary Point of Contact
History
  • Dec 23, 2025 10:51 am PSTCombined Synopsis/Solicitation (Original)
Get Government Bids Like This by Email Receive daily bid alerts that match your keywords, business categories, and target regions.

See Also

Follow J091--Aboveground Fuel Tank Inspection Services - Kansas City VAMC Active Contract Opportunity

VETERANS AFFAIRS, DEPARTMENT OF

Due by 12/11/2026

Follow Operations Mechanical BPA Active Contract Opportunity Notice ID W912P927QA006 Related Notice Department/Ind.

DEPT OF DEFENSE

Due by 12/11/2026

Breese Generator Building 8822 StatusAccepting Bids Prebid Date 11/17/26 10:00am Bid Date 11/24/26

Drexel Technologies

Due by 11/24/2026

Basic Information Negotiation DHSS 0000000059SL Title SCIEX 6500 Generator Service Agreement Negotiation Type

State Government of Missouri

Due by 11/25/2026

* Disclaimer: This website provides information about bids, requests for proposals (RFPs), or requests for qualifications (RFQs) for convenience only and does not serve as an official public notice. Individuals who wish to respond to or inquire about bids, RFPs, or RFQs should contact the relevant government department directly.