USCGC Alder Fire Main Repair

Agency: HOMELAND SECURITY, DEPARTMENT OF
State: California
Type of Government: Federal
FSC Category:
  • J - Maintenance, Repair, and Rebuilding of Equipment
NAICS Category:
  • 336611 - Ship Building and Repairing
Set Aside: Total Small Business Set-Aside (FAR 19.5)
Posted Date: Dec 3, 2025
Due Date: Dec 10, 2025
Solicitation No: 70Z08526Q0001432
Original Source: Please Login to View Page
Contact information: Please Login to View Page
Bid Documents: Please Login to View Page

Description

Follow
USCGC Alder Fire Main Repair
Active
Contract Opportunity
Notice ID
70Z08526Q0001432
Related Notice
Department/Ind. Agency
HOMELAND SECURITY, DEPARTMENT OF
Sub-tier
US COAST GUARD
Office
SFLC PROCUREMENT BRANCH 2(00085)
Looking for contract opportunity help?

APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.

APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.

The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).

General Information
  • Contract Opportunity Type: Combined Synopsis/Solicitation (Original)
  • Original Published Date: Dec 03, 2025 08:48 am PST
  • Original Date Offers Due: Dec 10, 2025 08:00 am PST
  • Inactive Policy: 15 days after date offers due
  • Original Inactive Date: Dec 25, 2025
  • Initiative:
    • None
Classification
  • Original Set Aside: Total Small Business Set-Aside (FAR 19.5)
  • Product Service Code: J020 - MAINT/REPAIR/REBUILD OF EQUIPMENT- SHIP AND MARINE EQUIPMENT
  • NAICS Code:
    • 336611 - Ship Building and Repairing
  • Place of Performance:
    San Francisco , CA 94130
    USA
Description

Statement of Work

USCGC ALDER (WLB 216)

Fire Main Piping Crop & Renew

1. Purpose and Scope

• KTR shall renew firemain piping located in compartment 1-12-1-L, Passage.

2. Deliverables and Performance Requirements

• Protective measures: The KTR must furnish and install all protective measures IAW SFLC Std Spec 0000, paragraph 3.3.3 (Vessel component, space, and equipment protection).

• Interferences: The KTR must handle all interferences IAW SFLC Std Spec0000, (Interferences).

• Contamination prevention: The KTR must take all precautions to prevent contamination of personnel and spaces IAW all applicable Federal, state, and local regulations.

• Fluid handling: The KTR must remove and dispose of removed fluids from the affected piping system, IAW all applicable Federal, state, and local regulations. Do not drain any fluids into any spaced, bilge, or exterior location.

• Piping renewal particulars: The KTR must accomplish the following tasks, using Coast Guard Drawing 225–WLB–521–001, REV F as guidance:

o Crop out necessary length of piping (6” diameter), to include all necessary FPL supply (3” diameter) and pressure gauge/sensor supply (1/4” diameter) piping.

o Fabricate necessary piping arrangement previously cropped IAW CG Drawing.

o Install all fabricated piping to include all required gaskets/seals IAW CG Drawing.

o KTR must provide a means of sealing any open piping while any portion of the system is open (i.e.: upstream valve blind flange).

• Pipe hangers: Furnish, fit, and install new pipe hangers, as necessary.

• Pipe labeling: The KTR must label affected piping as follows:

o Name of the piping system service.

o Destination, where feasible.

o Direction of flow, indicated by an arrow three inches long pointing away from the lettering.

• Leak Test: After completing all authorized mechanical (i.e. threaded, bolted, etc.) joint repairs, the Contractor must test the affected piping system's operation using the system fluid at normal operating pressure. Ensure zero visible leakage from or deformation of mechanical parts by repairing all leaks and discrepancies.

• Touch-up preservation: The KTR must prepare and coat all new and disturbed surfaces to match existing adjacent surfaces in accordance with SFLC Std Spec 6310, (Touch-ups and minor coating repairs.)

• Piping insulation installation: The KTR must install new insulation materials over the exposed pipe surfaces at thicknesses appropriate to the application and temperature ranges specified in ASTM F683 Tables.

o Associated pipe hangers



o Valves

o Fittings

o Flanges

3. Period of Performance

• ALDER is available during the following dates:

o 17 December 2025 – 10 January 2026

o 08 February – 07 March 2026.

4. Location and Method of Performance

• Guard Sector San Francisco

1 Yerba Buena Island

San Francisco, CA 94130

5. Roles and Responsibilities

• KTR shall provide Marine Chemist to include certification and all associated documentation for initial certification for hot work.

• KTR shall provide competent person to include certification and all associated documentation for recertification for hot work.

• KTR shall notify USCGC ALDER POC of any planned hot work prior to COB the day prior to planned hot work.

• USCGC ALDER shall provide all necessary fire watches during working hours (0700-1500).

• KTR shall provide all necessary fire watches after working hours.

6. Acceptance Criteria

• N/A

7. Security and Confidentiality

• KTR shall provide:

o State Issued Identification numbers to include issuing state for all personnel

o Vehicle license plate number to include issuing state for all KTR vehicles

o Each vehicle year, make, and model

8. Reporting Requirements

• N/A

9. Legal Compliance

• KTR shall comply with all applicable Federal, State, and Local laws and regulations.

10. Performance Monitoring

• N/A


Attachments/Links
Contact Information
Contracting Office Address
  • COAST GUARD ISLAND, BLDG 50-7
  • ALAMEDA , CA 94501
  • USA
Primary Point of Contact
Secondary Point of Contact
History
  • Dec 03, 2025 08:48 am PSTCombined Synopsis/Solicitation (Original)
Get Government Bids Like This by Email Receive daily bid alerts that match your keywords, business categories, and target regions.

See Also

Project ID: 2026-IFB-LM-0419 Title: Authorized Honda Motorcycle Service, Repair, Maintenance, and OEM Parts

City of Pasadena

Due by 9/30/2026

Project ID: Title: Access Control System Replacement and Maintenance Addenda: 0 Release Date:

County of San Mateo

Due by 10/14/2026

Follow Performance Assurance Services Active Contract Opportunity Notice ID M6700426Q0072 Related Notice Department/Ind.

DEPT OF DEFENSE

Due by 9/25/2026

Basic Information Title 26HS0013 - Cemetery Operations Equipment Maintenance and Repair Services Agency

State Government of California

Due by 9/25/2026

* Disclaimer: This website provides information about bids, requests for proposals (RFPs), or requests for qualifications (RFQs) for convenience only and does not serve as an official public notice. Individuals who wish to respond to or inquire about bids, RFPs, or RFQs should contact the relevant government department directly.