USCGC Alder Cargo Hatch Welding
| Agency: | HOMELAND SECURITY, DEPARTMENT OF |
|---|---|
| State: | California |
| Type of Government: | Federal |
| FSC Category: |
|
| NAICS Category: |
|
| Set Aside: | Total Small Business Set-Aside (FAR 19.5) |
| Posted Date: | Apr 30, 2026 |
| Due Date: | May 11, 2026 |
| Solicitation No: | 70z08526Q0024676 |
| Original Source: | Please Login to View Page |
| Contact information: | Please Login to View Page |
| Bid Documents: | Please Login to View Page |
Description
APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.
APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.
The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).
- Contract Opportunity Type: Combined Synopsis/Solicitation (Original)
- Original Published Date: Apr 30, 2026 09:55 am PDT
- Original Date Offers Due: May 11, 2026 08:00 am PDT
- Inactive Policy: 15 days after date offers due
- Original Inactive Date: May 26, 2026
-
Initiative:
- None
- Original Set Aside: Total Small Business Set-Aside (FAR 19.5)
- Product Service Code: J020 - MAINT/REPAIR/REBUILD OF EQUIPMENT- SHIP AND MARINE EQUIPMENT
-
NAICS Code:
- 336611 - Ship Building and Repairing
-
Place of Performance:
San Francisco , CA 94130USA
Statement of Work
USCGC ALDER (WLB 216)
Cargo Hold Hatch Cofferdam Drain Piping Crop & Renew
1. Purpose and Scope
. KTR shall renew necessary portions of the cargo hold hatch cofferdam drain piping
located in compartment 2-30-0-AA, Cargo Hold.
2. Deliverables and Performance Requirements
. Protective measures: The KTR must furnish and install all protective measures IAW
SFLC Std Spec 0000, paragraph 3.3.3 (Vessel component, space, and equipment
protection).
. Interferences: The KTR must handle all interferences IAW SFLC Std Spec0000,
(Interferences).
. Contamination prevention: The KTR must take all precautions to prevent
contamination of personnel and spaces IAW all applicable Federal, state, and local
regulations.
. Fluid handling: The KTR must remove and dispose of removed fluids from the
affected piping system, IAW all applicable Federal, state, and local regulations. Do not
drain any fluids into any spaced, bilge, or exterior location.
. Piping renewal particulars: The KTR must accomplish the following tasks, using
Coast Guard Drawing 225–WLB–528–001, REV K as guidance:
o Crop out necessary length of piping (3” & 2” diameter), to include all necessary
funnel pieces of the cofferdam system.
o Fabricate necessary piping arrangement previously cropped IAW CG Drawing.
o Install all fabricated piping to include all required gaskets/seals IAW CG
Drawing.
o KTR must provide a means of sealing any open piping while any portion of the
system is open (i.e.: upstream valve blind flange).
. Pipe hangers: Furnish, fit, and install new pipe hangers, as necessary.
. Pipe labeling: The KTR must label affected piping as follows:
o Name of the piping system service.
o Destination, where feasible.
o Direction of flow, indicated by an arrow three inches long pointing away from
the lettering.
. Leak Test: After completing all authorized mechanical (i.e. threaded, bolted, etc.)
joint repairs, the Contractor must test the affected piping system's operation using the
system fluid at normal operating pressure. Ensure zero visible leakage from or
deformation of mechanical parts by repairing all leaks and discrepancies.
. Touch-up preservation: The KTR must prepare and coat all new and disturbed
surfaces to match existing adjacent surfaces in accordance with SFLC Std Spec 6310,
(Touch-ups and minor coating repairs.)
. Piping insulation installation: The KTR must install new insulation materials over
the exposed pipe surfaces at thicknesses appropriate to the application and temperature
ranges specified in ASTM F683 Tables.
- COAST GUARD ISLAND, BLDG 50-7
- ALAMEDA , CA 94501
- USA
- Lindsay Mongiovi
- lindsay.n.mongiovi@uscg.mil
- Phone Number 5716086752
- Justin Wooldridge
- justin.r.wooldridge2@uscg.mil
- Phone Number 2068205327
- Apr 30, 2026 09:55 am PDTCombined Synopsis/Solicitation (Original)
See Also
Project ID: 2026-IFB-LM-0419 Title: Authorized Honda Motorcycle Service, Repair, Maintenance, and OEM Parts
City of Pasadena
Due by 9/30/2026
Project ID: Title: Access Control System Replacement and Maintenance Addenda: 0 Release Date:
County of San Mateo
Due by 10/14/2026
Follow Performance Assurance Services Active Contract Opportunity Notice ID M6700426Q0072 Related Notice Department/Ind.
DEPT OF DEFENSE
Due by 9/25/2026
Basic Information Title 26HS0013 - Cemetery Operations Equipment Maintenance and Repair Services Agency
State Government of California
Due by 9/25/2026