US Route 1 Corridor - Installation of Adaptive Signal Control Technology (ASCT)
| Agency: | State Government of Connecticut |
|---|---|
| State: | Connecticut |
| Type of Government: | State & Local |
| NAICS Category: |
|
| Posted Date: | Feb 12, 2026 |
| Due Date: | Mar 11, 2026 |
| Solicitation No: | Town Project 20-26 |
| Original Source: | Please Login to View Page |
| Contact information: | Please Login to View Page |
| Bid Documents: | Please Login to View Page |
Description
The Town of Greenwich is seeking a qualified contractor to construct modifications at twenty-nine signalized intersections along Route 1 in Greenwich. The project includes the implementation of traffic signal modifications, including Adaptive Signal Control Technology, signal heads, pedestrian signals, signal controllers, cabinets, and system integration, plus the construction of ADA-compliant curb ramps to improve traffic operations and increase pedestrian accessibility.
Michael Kiselak 101 Field Point Road Greenwich CT, 06830 United States Tel: 2036223839 Fax: michael.kiselak@greenwichct.gov
See Also
NUMBER TITLE STATUS BID TYPE NAME CONTACT INFORMATION AVAILABLE DATE CLARIFICATION DEADLINE DUE
City of Stamford
Due by 10/15/2026
Project ID: Title: Reconnecting Communities Initiative Addenda: 0 Release Date: 9/11/2026 Due Date:
City of New Haven
Due by 10/20/2026
City RFP - Waste Characterization Study 2027.0092, City RFP - Waste Characterization Study
State Government of Connecticut
Due by 10/15/2026
UConn Gampel Pavilion Reno - Phase 2 REBID 2 DPR Construction (DPR) is
State Government of Connecticut
Due by 9/24/2026