| Agency: | Town of Greenwich |
|---|---|
| State: | Connecticut |
| Type of Government: | State & Local |
| NAICS Category: |
|
| Posted Date: | Mar 10, 2026 |
| Due Date: | Apr 7, 2026 |
| Solicitation No: | 7945 |
| Original Source: | Please Login to View Page |
| Contact information: | Please Login to View Page |
| Bid Documents: | Please Login to View Page |
| Bid Number: |
7945
|
| Bid Title: |
Upper Havemeyer Field Drainage Improvements
|
| Category: | Town of Greenwich |
| Status: | Open |
|
| March 4, 2026 |
|---|
| TOWN OF Greenwich CONNECTICUT |
| Upper Havemeyer Field TOWN PROJECT NUMBER: RFP 7945 |
RFB #7945 EXHIBIT H
WESTON & SAMPSON ENGINEERS, INC.
712 Brook Street, Suite 103
Rocky Hill, CT 06067
tel: 860.513.1473
TECHNICAL
SPECIFICATIONS
March 4, 2026
TOWN OF
Greenwich
CONNECTICUT
Upper Havemeyer Field
TOWN PROJECT NUMBER:
RFP 7945
RFB #7945 EXHIBIT H
SECTION 00 01 10: TABLE OF CONTENTS
DIVISION 00: PROCUREMENT/CONTRACTING REQUIREMENTS
00 01 10 Table of Contents
00 31 43 Permits
00 43 43 Prevailing Wage Rates - BY TOWN
DIVISION 01: GENERAL REQUIREMENTS
01 11 00 Control of Work and Materials
01 12 16 Scope and Sequence of Work
01 14 00 Special Provisions
01 14 19.16 Dust Control
01 31 19.23 Construction Meetings
01 32 16 Construction Schedule
01 32 33 Construction Photographs
01 33 23 Submittals
01 55 26.13 Signage (Traffic Control)
01 56 26 Temporary Chain Link Fence
01 56 39 Temporary Tree and Plant Protection
01 57 19 Environmental Protection
01 73 29 Cutting, Coring & Patching
01 74 13 Cleaning Up
01 78 00 Project Closeout
01 78 39 Project As-Built Record Drawings
01 92 13 Operations and Maintenance Manuals
DIVISION 02: EXISTING CONDITIONS
02 41 13 Selective Site Demolition
02 41 19.16 Minor Electrical Demolition
DIVISION 31: EARTHWORK
31 00 00 Earthwork
31 05 13.13 Loam (Topsoil)
31 05 19.13 Filter Fabric
31 23 16.23 Rock Excavation and Disposal
31 23 19 Dewatering
31 50 00 Support of Excavation
04/20/2022 00 01 10-1
RFB #7945 EXHIBIT H
DIVISION 32: EXTERIOR IMPROVEMENTS
32 18 23 Natural Athletic Field Turf
32 84 00 Irrigation System
32 92 19 Seeding
32 92 23 Sodding
DIVISION 33: UTILITIES
33 05 26.13 Tracer Tape
33 39 13 Precast Manholes and Catch Basins
33 41 13.16 Polyethylene Drainage Pipe (Perforated)
33 41 13.28 Reinforced Concrete Pipe
33 44 00 PVC Yard Drain Structure
04/20/2022 00 01 10-2
RFB #7945 EXHIBIT H
SECTION 00 31 43
PERMITS
PART 1 - GENERAL
1.01 DESCRIPTION:
This Section provides specific information and defines specific requirements of the
Contractor regarding the preparation and acquisition of permits required to perform the
work of this project.
1.02 RELATED WORK:
A. Section 01 11 00, CONTROL OF WORK AND MATERIALS
B. Section 01 14 19.16, DUST CONTROL
C. Section 01 55 26.13, SIGNAGE (TRAFFIC CONTROL)
D. Section 01 57 19, ENVIRONMENTAL PROTECTION
I. Section 31 00 00, EARTHWORK
J. Section 31 23 19, DEWATERING
1.03 GENERAL REQUIREMENTS:
A. The Owner has obtained or will obtain and pay for the permits listed below, which are
required for this project. The Contractor shall assist in obtaining certain permits, as
indicated. The Contractor shall obtain and pay for all other permits required, as defined
under the Permits subsection of Section 00 72 00, GENERAL CONDITIONS.
06/15/2022 00 31 43-1
RFB #7945 EXHIBIT H
Permits by Owner Status
Building Permit *
Backflow Preventers *
*Contractor shall prepare permit application and obtain the permit after
contract is awarded, bearing all expenses. Owner will pay for and/or
waive the permit application fee, if applicable.
PART 2 - PRODUCTS
Not Used.
PART 3 - EXECUTION
3.01 PERFORM WORK IN ACCORDANCE WITH REQUIREMENTS:
A. The Contractor shall perform the work in accordance with the Contract Documents,
including the attached permits/order of conditions, and any applicable municipal
requirements.
B. Prior to commencing any construction activities, the Contractor shall demonstrate to the
Owner and the Engineer, through on-site inspection and submitting copies of permits or
approvals, that it is in full compliance with the terms and conditions of all permits
specified herein. The Contractor shall maintain full compliance with all permits
throughout the performance of the work, and upon request, grant access to permitting
authorities to inspect the site for the purpose of verifying such compliance.
END OF SECTION
\\Wse03.local\WSE\Projects\CT\Greenwich CT\Greenwich- Upper Havemeyer\Specifications\00 31 43
Permits.docx
06/15/2022 00 31 43-2
RFB #7945 EXHIBIT H
SECTION 00 43 43
PREVAILING WAGE RATES
RFB #7945 EXHIBIT H
SECTION 01 11 00
CONTROL OF WORK AND MATERIALS
PART 1 - GENERAL
Not Used.
PART 2 - PRODUCTS
Not Used
PART 3 - EXECUTION
3.01 HAULING, HANDLING AND STORAGE OF MATERIALS:
A. The Contractor shall, at its own expense, handle and haul all materials furnished by it
and shall remove any of its surplus materials at the completion of the work.
B. The Contractor shall provide suitable and adequate storage for equipment and materials
furnished by it that are liable to injury and shall be responsible for any loss of or damage
to any equipment or materials by theft, breakage, or otherwise.
C. All excavated materials and equipment to be incorporated in the Work shall be placed so
as not to injure any part of the Work or existing facilities and so that free access can be
had at all times to all parts of the Work and to all public utility installations in the vicinity
of the work. Materials and equipment shall be kept neatly piled and compactly stored in
such location as will cause a minimum of inconvenience to public travel and adjoining
owners, tenants and occupants.
D. The Contractor shall be responsible for all damages to the work under construction during
its progress and until final completion and acceptance even though partial payments have
been made under the Contract.
*3.02 EASEMENTS:
A. As indicated on the drawings, the work is located in easements obtained by the Owner.
The Contractor has no rights outside of the easements unless they are obtained from the
property owner.
B. Contractor shall schedule work so that it will cause minimum inconvenience and
nuisance to abutting property owners, over the shortest possible time.
C. Easements shall be kept clean; no rubbish or discarded construction materials shall be
allowed to accumulate. Storage of excess construction materials, including soil, ledge,
equipment, or machinery on easements will not be allowed.
08/07/2018 01 11 00-1
RFB #7945 EXHIBIT H
D. Restoration of fences, shrubs, trees and grass shall be completed promptly following
completion of the work in an easement, to minimize disruption and inconvenience to
property owners.
E. Unless approved by the Engineer, the use of easements for ease of access to and egress
from other areas of the project will not be permitted.
3.03 OPEN EXCAVATIONS:
A. All open excavations shall be adequately safeguarded by providing temporary barricades,
caution signs, lights and other means to prevent accidents to persons, and damage to
property. The Contractor shall, at its own expense, provide suitable and safe means for
completely covering all open excavations and for accommodating travel when work is
not in progress.
B. Bridges provided for access to private property during construction shall be removed
when no longer required.
C. The length of open trench will be controlled by the particular surrounding conditions but
shall always be confined to the limits prescribed by the Engineer.
D. If the excavation becomes a hazard, or if it excessively restricts traffic at any point, then
special construction procedures shall be taken, such as limiting the length of trench and
prohibiting stocking excavated material in the street.
E. All street excavations shall be completely closed at the end of each work day. Backfilling
or use of steel plates of adequate strength to carry traffic shall be used.
3.04 MAINTENANCE OF TRAFFIC:
A. Unless permission to close the street is received in writing from the proper authority, all
excavated materials and equipment shall be placed so that vehicular and pedestrian traffic
may be safely maintained at all times.
B. Should the Chief of Police deem it necessary, uniformed officers will be assigned to
direct traffic. The Contractor shall make all arrangements in obtaining uniformed officers
required.
C. The Contractor shall at its own expense, as directed by the Police Traffic Control/Safety
Officer, provide and erect acceptable barricades, barrier fences, traffic signs, and all other
traffic devices not specifically covered in a bid item, to protect the work from traffic,
pedestrians, and animals. It shall provide sufficient temporary lighting such as
lanterns/flashers (electric battery operated) or other approved illuminated traffic signs
08/07/2018 01 11 00-2
RFB #7945 EXHIBIT H
and devices to afford adequate protection to the traveling public, at no additional cost to
the Owner.
D. The Contractor shall furnish all construction signs that are deemed necessary by and in
accordance with Part VI of the Manual on Uniform Traffic Control Devices as published
by the U.S. Department of Transportation. In addition, the Contractor may be required
to furnish up to 128 square feet of additional special construction warning signs. Size
and exact wording of signs shall be determined by the Engineer during construction.
E. The intent of policing is to ensure public safety by direction of traffic. Police officers are
not to serve as watchmen to protect the Contractor's equipment and materials.
F. Nothing contained herein shall be construed as relieving the Contractor of any of its
responsibilities for protection of persons and property under the terms of the Contract.
3.05 CARE AND PROTECTION OF PROPERTY:
The Contractor shall be responsible for the preservation of all public and private property,
and shall use every precaution necessary to prevent damage thereto. If any direct or
indirect damage is done to public or private property by or on account of any act,
omission, neglect, or misconduct in the execution of the work on the part of the
Contractor, such property shall be promptly restored by the Contractor, at its expense, to
a condition similar or equal to that existing before the damage was done, to the
satisfaction of the Engineer.
3.06 PROTECTION AND RELOCATION OF EXISTING STRUCTURES AND
UTILITIES:
A. All existing buildings, utilities, pipes, poles, wires fences, curbings, property line markers
and other structures which the Engineer decides must be preserved in place without being
temporarily or permanently relocated, shall be carefully supported and protected from
damage by the contractor. Should such property be damaged, it shall be restored by the
Contractor, at no additional cost to the Owner.
B. The Contractor shall determine the location of all underground structures and utilities
(including existing water services, drain lines, electrical lines, and sewers). Services to
08/07/2018 01 11 00-3
RFB #7945 EXHIBIT H
buildings shall be maintained, and all costs or charges resulting from damage thereto
shall be paid by Contractor.
C. When fences interfere with the Contractor's operations, it shall remove and (unless
otherwise specified) promptly restore them in accordance with Section 01 14 19.19
EXISTING FENCES.
D. On paved surfaces the Contractor shall not use or operate tractors, bulldozers, or other
power-operated equipment with treads or wheels which are shaped so as to cut or
otherwise damage such surfaces.
E. All property damaged by the Contractor's operations shall be restored to a condition at
least equal to that in which it was found immediately before work was begun. Suitable
materials and methods shall be used for such restoration.
F. Restoration of existing property and structures shall be carried out as promptly as
practicable and shall not be left until the end of the construction period.
3.07 MAINTENANCE OF FLOW:
A. The Contractor shall at its own cost, provide for the flow of sewers and drains interrupted
during the progress of the work, and shall immediately cart away and dispose of all
offensive matter. The entire procedure of maintaining existing flow shall be fully
discussed with the Engineer well in advance of the interruption of any flow.
B. All existing drainage facilities including, but not limited to; brooks, streams, canals,
channels, ditches, culverts, catch basins and drainage piping shall be adequately
safeguarded so as not to impede drainage or to cause siltation of downstream areas in any
manner whatsoever. If the Contractor damages or impairs any of the aforesaid drainage
facilities, it shall repair the same within the same day.
C. At the conclusion of the work, the Contractor shall remove all silt in drainage structures
caused by its operations as described in Section 01 74 13, CLEANING UP.
3.08 REJECTED MATERIALS AND DEFECTIVE WORK:
A. Materials furnished by the Contractor and condemned by the Engineer as unsuitable or
not in conformity with the specifications shall forthwith be removed from the work by
the Contractor, and shall not be made use of elsewhere in the work.
B. Any errors, defects or omissions in the execution of the work or in the materials furnished
by the Contractor, even though they may have been passed or overlooked or have
appeared after the completion of the work, discovered at any time before the final
08/07/2018 01 11 00-4
With Free Trial, you can:
You will have a full access to bids, website, and receive daily bid report via email and web.
26-013 CT6 H6003-05 Infusion Center Miscellaneous Renovations Project scope includes design and construction
State Government of Connecticut
Bid Due: 8/07/2026
RFP for Statewide Farebox Upgrade Project The State of Connecticut Department of Transportation
State Government of Connecticut
Bid Due: 9/16/2026
UConn - University Second Electrical Feed - Invite to Bid The project is
State Government of Connecticut
Bid Due: 8/13/2026
Number 8666 Title CCTV and Multi-Sensor Inspections of large Diameter (18-inch to 72-inch)
City of Waterbury
Bid Due: 8/05/2026