Upper Baker Installing Trailer Pads and Utilities
| Agency: | AGRICULTURE, DEPARTMENT OF |
|---|---|
| State: | Utah |
| Type of Government: | Federal |
| FSC Category: |
|
| NAICS Category: |
|
| Set Aside: | Total Small Business Set-Aside (FAR 19.5) |
| Posted Date: | Jul 7, 2026 |
| Due Date: | Aug 10, 2026 |
| Solicitation No: | 1240LT26Q0126 |
| Original Source: | Please Login to View Page |
| Contact information: | Please Login to View Page |
| Bid Documents: | Please Login to View Page |
Description
APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.
APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.
The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).
- Contract Opportunity Type: Combined Synopsis/Solicitation (Original)
- Original Published Date: Jul 07, 2026 09:10 am MDT
- Original Date Offers Due: Aug 10, 2026 05:00 pm MDT
- Inactive Policy: 15 days after date offers due
- Original Inactive Date: Aug 25, 2026
-
Initiative:
- None
- Original Set Aside: Total Small Business Set-Aside (FAR 19.5)
- Product Service Code: S119 - UTILITIES- OTHER
-
NAICS Code:
- 237110 - Water and Sewer Line and Related Structures Construction
-
Place of Performance:
Monticello , UT 84535USA
This contract is comprised of installing utility lines, connections to existing lines and connections to trailer pads. Utilities included are electrical, water and sewer. Option items included are trenching, providing and spreading gravel and installation of an asphalt apron. Water and Sewer lines and connections must be kept 10ft apart. Contractor must work with and is responsible for all communications, supplies and permits with utility companies associated. All utilities will be installed in compliance with State and/or San Juan County code.
Utilities –
Water - The new water line will be connected to the existing water line between the meter and bunkhouse. Main water line will remain same size as existing line. Existing line is a 2” poly line. New water line will be a 2” HDPE blue Poly and connect to existing. One stop and waste to be installed within 5ft of new and existing line connection.
Sewer – The new sewer line will be connected to the existing sewer line at the bunkhouse. Main line will be 6” with trailer connections being 6” to 3” Wye’s. Drainage must remain between 1/8” – ¼” per ft across the entirety of the line. Must meet state code.
Electrical – A transformer and drop-down meter will need to be coordinated and installed with Empire Electric and conduit and wiring ran from meter to the trailer pads. Contractor will be responsible for determining sizing of conduit and wiring. Must meet state code.
Option Items –
Trenching and Backfilling – Trenching will need to be 36” deep to meet frost line requirements.
Crushed Aggregate – Grade G Road Base for the trailer pads and roadway
- MANTI LASAL NATIONAL FOREST 599 W PRICE RIVER DRIVE
- PRICE , UT 84501
- USA
- Derrick A Dodson
- derrick.dodson@usda.gov
- Jaren McCourt
- Jaren.mccourt@usda.gov
- Jul 07, 2026 09:10 am MDTCombined Synopsis/Solicitation (Original)
See Also
RFP #26-04064BCM - Janitorial Services for UTA Buildings Posted 09/15/2026, Closes 10/15/2026 REQUEST
Utah Transit Authority
Due by 10/15/2026
Project: SLCo FAC133224 Window Washing - RFC Ref. #: SLCoFAC133224-RFC Department: COUNTIES -
State Government of Utah
Due by 9/25/2026
Follow Hill AFB Snow Removal BPA Active Contract Opportunity Notice ID FA820127Q0002 Related
DEPT OF DEFENSE
Due by 10/05/2026
Open TB Control and Refugee Health Professional Services for TB Control and Refugee
State Government of Utah
Due by 1/14/2027