Upgraded HVAC and Fire Life Safety Project at the Air Traffic Control Tower (ATCT) in Portland, MA
| Agency: | TRANSPORTATION, DEPARTMENT OF |
|---|---|
| State: | Maine |
| Type of Government: | Federal |
| FSC Category: |
|
| NAICS Category: |
|
| Set Aside: | Total Small Business Set-Aside (FAR 19.5) |
| Posted Date: | Sep 25, 2024 |
| Due Date: | Nov 22, 2024 |
| Solicitation No: | 697DCK-24-R-00596 |
| Original Source: | Please Login to View Page |
| Contact information: | Please Login to View Page |
| Bid Documents: | Please Login to View Page |
Description
APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.
APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.
The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).
- Contract Opportunity Type: Solicitation (Original)
- Original Published Date: Sep 25, 2024 12:22 pm EDT
- Original Date Offers Due: Nov 22, 2024 12:00 pm EST
- Inactive Policy: 15 days after date offers due
- Original Inactive Date: Dec 07, 2024
-
Initiative:
- None
- Original Set Aside: Total Small Business Set-Aside (FAR 19.5)
- Product Service Code: Z1BA - MAINTENANCE OF AIR TRAFFIC CONTROL TOWERS
-
NAICS Code:
- 238210 - Electrical Contractors and Other Wiring Installation Contractors
-
Place of Performance:
Portland , ME 04102USA
The PWM ATCT HVAC project is primarily an equipment replacement/upgrade project with Mechanical Controls. The existing chiller and dry cooler will be replaced with two new chillers. The existing boiler will be replaced with two redundant boilers. The hot water and chilled pumps will be replaced with new VFD pumps along with a new piping configuration to be installed. A total of four new CRUs will be installed to replace the existing CRUs. The existing RTU that controls the base building air will be fully replaced along with all its duct work. New VAVs to be installed in the base building system as well. The existing stair pressurization will be replaced along with the removal/addition of several smoke detectors throughout the building. The existing ballasted base building roof will be fully replaced with a PVC membrane roof system. All existing three way hydronic valves will be replaced with two way Belimo energy valves. The existing TRANE BAS will be replaced in full with Schneider Electric EcoStruxure BAS. New equipment will also be installed including fan coil unit and bathroom exhaust fans. Incidental work includes hydronic piping, domestic water piping, pipe insulation, wall insulation, framing, and gypsum board, painting, joint sealants, electrical wiring and devices, concrete pads, and equipment supports. A significant portion of the work also includes temporary heating and cooling, testing & balancing and commissioning. The list is not all inclusive and other items of work are required.
- AAQ-500, FAA SW REGIONAL OFFICE 10101 HILLWOOD PKWY
- FORT WORTH , TX 76177
- USA
- Ms. Joni Haynes
- joni.l.haynes@faa.gov
- Erin Crabtree
- erin.m.crabtree@faa.gov
- Sep 25, 2024 12:22 pm EDTSolicitation (Original)
Related Document
| Oct 15, 2024 | [Solicitation (Updated)] Upgraded HVAC and Fire Life Safety Project at the Air Traffic Control Tower (ATCT) in Portland, ME |
| Nov 14, 2024 | [Solicitation (Updated)] Upgraded HVAC and Fire Life Safety Project at the Air Traffic Control Tower (ATCT) in Portland, ME |
| Dec 2, 2024 | [Solicitation (Updated)] Upgraded HVAC and Fire Life Safety Project at the Air Traffic Control Tower (ATCT) in Portland, ME |
| Dec 16, 2024 | [Solicitation (Updated)] Upgraded HVAC and Fire Life Safety Project at the Air Traffic Control Tower (ATCT) in Portland, ME |
| Dec 18, 2024 | [Solicitation (Updated)] Upgraded HVAC and Fire Life Safety Project at the Air Traffic Control Tower (ATCT) in Portland, ME |
| Jan 6, 2025 | [Solicitation (Updated)] Upgraded HVAC and Fire Life Safety Project at the Air Traffic Control Tower (ATCT) in Portland, ME |
See Also
Follow USCG Sector Field Office Southwest Harbor - Major Maintenance and Repair Galley
HOMELAND SECURITY, DEPARTMENT OF
Due by 9/17/2026
Follow Chicken Ranch siding replacement Active Contract Opportunity Notice ID 1240LU26Q0123 Related Notice
AGRICULTURE, DEPARTMENT OF
Due by 9/30/2026
Follow USCG Sector Field Office Southwest Harbor - Major Maintenance and Repair Galley
HOMELAND SECURITY, DEPARTMENT OF
Due by 9/17/2026
Bid Number: P27-18 Bid Title: Dock 11 & 13 Roof Renovations - BGR
City of Bangor
Due by 9/23/2026