Description

Program/Jacket Number: 452-072
Title: United States Army Reserve Command (Microfiche)
Bid Opening Date: September 29, 2026
Contract Type: One-Time Bid
Scope: This statement of work is for digitization for approximately 51,000 cards Microfiches, 17 boxes of Microfiche. Along with shredding all 17 boxes once approval is given.
Contractor will be required to separate each card for scanning. Handwork intervention (Light Intervention) may be required.
Quantity: 51,000
Ship/Deliver Date: September 30, 2027
Files: 452-072

Attachment Preview

Specifications by JH Jacket 452-072
Page 1 of 9 Requisition: 6-52072
Reviewed by TS
U.S. Government Publishing Office (GPO)
Government Publishing and Printing Procurement
General Terms, Conditions, and Specifications
for the procurement of
United States Army Reserve Command (Microfiche)
As requisitioned from the U.S. Government Publishing Office (GPO) by the
DLA Document Services DOCON
BID OPENING: Bids shall be opened at 11:00 a.m., prevailing Eastern Standard Time, on September 29, 2026
at the U.S. Government Publishing Office. All parties interested in attending the bid opening shall email
bids@gpo.gov one (1) hour prior to the bid opening date and time to request a Microsoft Teams live stream link.
This must be a separate email from the bid submission. The link will be emailed prior to the bid opening.
Any questions before or after award concerning these specifications contact Juliann Handziak at
Jhandziak@gpo.gov or (614) 488-4616, Ext. 3. No collect calls.
BID SUBMISSION: Bidders must email bids to bids@gpo.gov for this solicitation. No other method of bid
submission will be accepted at this time. The Jacket Number 452-072 and bid opening date must be specified in
the subject line of the emailed bid submission. Bids received after the bid opening date and time specified above
will not be considered for award.
ADDITIONAL EMAILED BID SUBMISSION PROVISIONS: The Government will not be responsible for
any failure attributable to the transmission or receipt of the emailed bid including, but not limited to, the
following:
1. Illegibility of bid.
2. Emails over 75 MB may not be received by GPO due to size limitations for receiving emails.
3. The bidder's email provider may have different size limitations for sending email; however, bidders are advised
not to exceed GPO's stated limit.
4. When the email bid is received by GPO, it will remain unopened until the specified bid opening time.
Government personnel will not validate receipt of the emailed bid prior to bid opening. GPO will use the
prevailing time (specified as the local time zone) and the exact time that the email is received by GPO's email
server as the official time stamp for bid receipt at the specified location.
BIDDERS PLEASE NOTE: The GPO 910 "BID" Form is no longer required. Bidders are to fill out,
sign/initial, as applicable, pages 8-9.
INSPECTION OF MATERIAL: Contractor is required to examine furnished material immediately upon
receipt, pursuant to GPO Publication 310.2, Contract Clauses, 7. Government Furnished Property (GFP). If at that
time there is disagreement with the description or requirements as presented in the specifications and prior to the
performance of any work, the contractor shall contact the contract administrator Juliann Handziak at 614-488-
4616, x3. Failure to bring any discrepancies to the attention of the GPO will not relieve the contractor of the
responsibility to perform. An accurate number of originals cannot be determined at this time. Contractor must
inform the US GPO Publishing Specialist via email immediately if furnished material is 10% more than estimated
count.
GPO CONTRACT TERMS: Any contract which results from this Invitation for Bid will be subject to the
applicable provisions, clauses, and supplemental specifications of GPO Contract Terms (GPO Pub. 310.2,
effective 12/1/87, Rev. 01-18).
* GPO Contract Terms (GPO Publication 310.2): https://www.gpo.gov/docs/default-source/forms-and-
standards-files-for-vendors/contractterms2018.pdf

Page 2 of 9 Jacket 452-072
WARRANTY: Contract Clause 15, "Warranty", of GPO Contract Terms (Publication 310.2, effective December
1, 1987 (Rev. 01-18)) is amended for the solicitation to the effect that the warranty period is EXTENDED from
120 days to one calendar year from the date the check is tendered as final payment. All other provisions remain
the same.
SECURITY WARNING: It is the contractor's responsibility to properly safeguard personally identifiable.
information (PII) from loss, theft, or inadvertent disclosure and to immediately notify the Government of
any loss of personally identifiable information. PII is "information which can be used to distinguish or trace an
individual's identity, such as their name, social security number, biometric , etc., alone, or when combined with
other personal or identifying information which is linked or linkable to a specific individual, such as date and
place of birth, mother's maiden name, etc. (Ref.: OMB Memorandum 07-16.) Other specific examples of PII
include, but are not limited to:
(a) Personal identification number, such as passport number, driver's license number, taxpayer
identification number, or financial account or credit card number.
(b) Address information, such as street address or personal email address; and,
(c) Personal characteristics, including photographic image (especially of face or other distinguishing
characteristic), fingerprints, handwriting, or other biometric image or template data (e.g., retina scans,
voice signature, facial geometry).
SECURITY CONTROL PLAN: The contractor shall operate and maintain an effective security system whereby
materials used to perform the contract are manufactured and/or stored (e.g. while awaiting distribution or
disposal) so as to ensure against theft and/or the unauthorized possession of the materials. Contractor is cautioned
that Government provided information shall not be used for non-government business. Specifically, Government
information shall not be used for the benefit of a third party.
The Government retains the right to conduct on-site security reviews at any time during this contract.
1.The plan shall contain at a minimum how government files (data) will be secured to prevent disclosure to a third
party prior to and after termination of contract.
2.Explain how all accountable materials will be handled throughout all phases of production.
3.How the disposal of waste materials will be handled; and,
4.How all applicable Government-mandated security/privacy/rules and regulations as cited in this contract shall
be adhered to by the contractor and/or subcontractor(s).
The Contractor shall assume all are unclassified, as all previously classified should have been declassified. There
could be instances where the record(s) were declassified (noted on the first page), but the markings on subsequent
pages were not properly removed. In the event are found with classified markings, the Contractor shall
immediately protect the record and contact DLA/Army/GPO.
The Contractor must utilize a Federal accredited moderate boundary network to ensure the protection of Federal .
The may contain Controlled Unclassified Information (CUI) and in most cases are not marked properly or have
old markings. The Contractor must safeguard the , and the must be kept under an authorized person's direct
control or protected with at least one physical barrier to protect CUI from unauthorized access. When not in an
authorized holder's direct possession, CUI will be kept in a locked desk drawer, filing cabinet or within a locked
office as long as the CUI is protected from unauthorized viewing.
The Contractor MUST follow all NARA (National Archives and Administration) standards and guidelines.
https://www.archives.gov/-mgmt/policy/digitization. Contractor MUST have in-depth knowledge of NIST
(National Institute of Standards and Technology) 800-37 Risk Management Framework (RMF) and NIST Special
Publication 800-53.
ADDITIONAL SECURITY REQUIREMENT: Contractor/ ALL employees handing the Materials/digital
output files at any point during this order MUST have an official Federal Tiered Background Investigation done
and active to be cleared to work on this project. Tier 2 or higher is required. If the contractor does not already
have this requirement fulfilled from previous work within the Federal Government, the contractor will be required

Page 3 of 9 Jacket 452-072
to complete this requirement within 60 days of award. If the contractor wishes to have it sponsored through DLA,
they will be required to have Tier 3 Background Investigations done. ALL costs for this will be at the contractor's
expense. Cost for the Background Investigation is per employee working on this order. Warehouse will need a 3-
day notice prior to any being removed.
QUOTATIONS - Contractor must submit a price for the line items within the comment section of the quote. A
charge will be allowed for each item or fraction thereof. This price will include the cost of ALL REQUIRED
OPERATIONS (including any miscellaneous charges); necessary to produce the products ordered.
PREAWARD SURVEY: In order to determine the responsibility of the prime contractor or any subcontractor,
the Government reserves the right to conduct an on-site preaward survey at the contractor's/subcontractor's facility
or to require other evidence of technical, production, managerial, financial, and similar abilities to perform, prior
to the award of a contract. As part of the financial determination, the contractor in line for award may be required
to provide one or more of the following financial documents:
1) Most recent profit and loss statement
2) Most recent balance sheet
3) Statement of cash flows
4) Current official bank statement
5) Current lines of credit (with amounts available)
6) Letter of commitment from paper supplier(s)
7) Letter of commitment from any subcontractor
The documents will be reviewed to validate that adequate financial resources are available to perform the contract
requirements. Documents submitted will be kept confidential and used only for the determination of responsibility
by the Government. Failure to provide the requested information in the time specified by the Government may
result in the Contracting Officer not having adequate information to reach an affirmative determination of
responsibility.
PAYMENT: Submitting invoices for payment via the GPO fax gateway (if no samples are required) utilizing the
GPO barcode coversheet application program is the most efficient method of invoicing. Instruction for using this
method can be found at the following web address:
http://winapps.access.gpo.gov/fms/vouchers/barcode/instructions.html .
Invoices may also be mailed to: U.S. Government Publishing Office, Office of Financial Management,
Attn: Comptroller, Stop: FMCE, Washington, DC 20401.
For more information about the billing process refer to the General Information of the Office of Finance web page
located at https://www.gpo.gov/how-to-work-with-us/vendors/how-to-get-paid.
NOTE: Partial Payments, as defined in GPO Pub. 310.2, Contract Terms, Contract Clause 25, are authorized
provided that each payment request is for one or more completed lots (payment for a partial lot will not be
permitted). Payment requests must include the signed certification for each lot, with the DOD coordinator's
signature of acceptance, for each invoice submitted to GPO. Lots will be determined after award, with agreement
between the DOD, GPO, and the contractor.
CONTRACTOR'S INVOICE FOR PAYMENT MUST BE ITEMIZED IN ACCORDANCE WITH THE
SCHEDULE OF PRICES.
NOTE: No guarantee can be made as to the total number of furnished pages. It is anticipated the approximate
count will be furnished. Upon completion of order, the contractor must submit the final actual number of pages
and number of mixed media produced and a final cost to the Columbus GPO where any adjustment in the
estimated cost will be made via a contract modification. The contractor's invoice for billing to the GPO -

Page 4 of 9 Jacket 452-072
Washington, DC MUST include a contract modification confirming the actual number of scans completed, before
payment is made.
PREAWARD SAMPLES: Contractor may be required to pickup a small sampling and perform an initial
preaward test prior to award and production, and submit to the agency electronically for review and approval to
demonstrate the contractor is able to produce this order exactly as specified in the contract. Scanned samples must
be received within 8 workdays from the date of request. Contractor must not enter job into production, order
materials/equipment, or make any financial commitments until contractor receives a signed purchase order. All
costs for this are at contractor expense.
GOVERNMENT IN-PLANT INSPECTIONS: The Government reserves the right to have Government
representative(s) inspect any operation under this contract at the start of its production and at any time during
production. In addition to the inspections indicated, the Government reserves the right to inspect all stages of
production.
TITLE: United States Army Reserve Command (Microfiche)
PRODUCT: These specifications cover digitization of large Microfiche collection. A total of 17 boxes to be
picked up from one location, approximately 51,000 total cards (21,420,000 images) of Microfiche in 17 boxes.
More information on collection below. Award will be based on total number of cards digitized.
QUANTITY: Approximately 51,000 cards (21,420,000 images), 17 boxes digitized.
DESCRIPTION: PREDOMINANT PRODUCTION FUNCTION: Scanning Services (NO PRINTING
REQUIRED).
SCOPE: This statement of work is for digitization for approximately 51,000 cards Microfiches, 17 boxes of
Microfiche. Along with shredding all 17 boxes once approval is given.
Contractor will be required to separate each card for scanning. Handwork intervention (Light Intervention) may
be required. Cards may be removed from their folders/envelopes for digitization. Cards are not required to be
reinserted into folders; however, all original contents must remain with their original box, and the established
order must be preserved. In the event rework is required, the contractor is solely responsible for tracking and
identifying the precise location of all cards within the box. Digital formats must replicate the original physical box
and folder organization. The contractor is permitted to disassemble and unbind furnished cards for the purpose of
digitization.
Contractor must exercise reasonable care to ensure that the integrity of the material is preserved. Where
materials are stapled, or otherwise fastened or bound, care must be used in handing the materials to
ensure that any part of the records are not obliterated or that the authenticity of the records becomes
questionable.
The contractor will be required to inspect all materials to determine their suitability for scanning. If
contractor determines that any document is unsuitable, contractor to contact Publishing Specialist at
Jhandziak@gpo.gov.
CHAIN OF CUSTODY: Chain of custody must be maintained at all times on ALL collections. Documentation
may be requested at any time to verify this. Procedures needed for ALL collections handing material are use of
transfer of custody form and tamper-proof seal on truck. No special procedures are needed during production.
PICKUP LOCATION:
The vendor will be escorted at all times while in the Government facility.

Page 5 of 9 Jacket 452-072
Pickup boxes with original contents at:
17 boxes to be picked up from: United States Army Reserve Command, 4710 Knox Street, Fort Bragg, NC 28310
Security requirements are required to gain access to the pickup location. The following are required: Driver's
license, USA Citizenship, Insurance, Registration, no arrest or warrants.
Files will be available to be picked up within one week of the PO being issued.
Collection:
QUANTITY: Approximately 51,000 Cards, 21,420,000 images, 17 boxes.
TRIM SIZE: Material will consist of 6x4" cards Microfiche. See products to be scanned for breakdown.
PRODUCTS TO BE SCANNED: Microfiche to be converted and scanned to single and multiple page PDF files
(approx. 51,000 cards) resulting in approx. 21,420,000 images. Content is single-sided, grayscale, text,
handwritten and are negative images. Each card has an estimated count of 420 images.
- The contractor is to prepare all documents for scanning (i.e. removing staples, paper clips, rubber bands and
other binding methods).
- Documents do not need to be reassembled
- Color Mode to be Grayscale
- Image clean up NOT required. Manual image enhancement/retouching is not required; however, all image
processing necessary to achieve the specified FADGI performance level is still required.
- OCR IS required
- Metadata requirements: CSV Load file. Unit Name, Year, Month along with all FADGI 3 star required fields
- Bates numbering requirements: NOT Required
- Naming Convention - ARMD File Naming Convention: U_Officesymbol_Meaningfulname_DDMMMYYYY
- Section 508 accessibility requirements: NOT required
- Scanned documents need to be text-searchable
- Files NOT to be compressed to reduce file size
DELIVERABLE: Media must be encrypted. Contractor to provide single-page and multiple-page PDFs and
FADGI 3-Star preservation master files. Files cannot be compressed to reduce file size. All files are to be high-
resolution printing optimization. Files to be provided on 2 suitable sized hard drives. 2 complete hard drive copies
to be provided. Encrypted Hard Drive that complies with FIPS 140-3/ Permanent files - FADGI 3 Star.
The documents do not need to be re-stapled or re-bound, but the order needs to remain intact.
Contractor to store ALL cards/ 17 boxes (Est. 51,000 cards of microfiche for 6 months) until the written approval
has been provided by GPO. Once approval is provided contractor is to dispose of all documents. Documents are
to be reduced to a size that ensures ALL the information is unreadable/unidentifiable. Letter of destruction is
required.
Waste must be destroyed in a manner that it is not possible to recreate the product; i.e. burning, pulping,
shredding, macerating, or other suitable means.
Destruction of source documents must be witnessed and documented to allow contractor to sign off that they were
destroyed. The contractor completing the destruction must provide destruction certificates to DLA/Army/GPO
upon completion of each service.
Shredding destruction must meet one of the following standards:
1) One-step method: Employ cross-cut shredders that produce particles measuring 1 mm x 5 mm 0.04 in. x0.2 in.)
or smaller.

Page 6 of 9 Jacket 452-072
2) One-step method: Pulverize / disintegrate paper using disintegrator devices equipped with a 3/32 in. (2.4 mm)
security screen.
Damaged Microfiche: If the contractor determines that any piece is damaged to the extent that a viable scan
cannot be made, the contractor is required to document the collection name/location and number of the damaged
pieces. All damaged, unscannable pieces shall be recorded on an Excel spreadsheet and submitted to the
customer through the GPO Contract Administrator. The contractor is responsible for maintaining the integrity of
the microfiche as they are furnished by the government. The contractor will be required to inspect all pieces to
determine their suitability for scanning.
STORAGE MEDIA: Contractor to provide two copies of files. Files to be stored/ provided on two identical
contractor supplied portable hard drive suitable for data required.
GOVERNMENT TO FURNISH (GFM):
Pickup boxes with original contents at:
17 boxes to be picked up from: United States Army Reserve Command, 4710 Knox Street, Fort Bragg, NC 28310
Pick up boxes with original contents. The Facility will be open between 8am - 2PM ET. Prior Notice and approval
is needed before picking up.
POC:
Thomas L. Adams, Administrator, thomas.l.adams.civ68@army.mil, 910-570-9548
Cody Gavigan, cody.gavigan@dla.mil, 614-693-4050
Contractor NOT to contact POC's until after award.
NOTE: CONTRACTOR MUST INFORM GPO IMMEDIATELY IF ORIGINALS FURNISHED IS MORE
THAN 10% OVER THE ORIGINAL ESTIMATED ORIGINALS. DO NOT PROCEED UNLESS
INSTRUCTED BY GPO.
CONTRACTOR TO FURNISH: All materials and operations, other than those listed under "GOVERNMENT
TO FURNISH," necessary to produce the product(s) in accordance with these specifications.
PROOFS: Text Box, Contractor is responsible that output is in conformance with visuals provided.
TEST BOX is required. Contents are to be provided through DODSafe Site (https://safe.apps.mil/my.policy). Box
is to be uploaded with project title, Req. Number, and jacket number. Scanning is not to proceed until approval is
given. GPO and end user is to be notified by email that the test box has been uploaded for review.
QUALITY ASSURANCE LEVELS AND STANDARDS: The following levels and standards shall apply to
these specifications:
QUALITY OF SCANNING: QUALITY OF SCANNING: All microfiche shall be digitized in accordance with
the FADGI Technical Guidelines for Digitizing Cultural Heritage Materials, Third Edition (May 2023), at the
FADGI 3-Star performance level applicable to microfilm/microfiche. Preservation master images shall be
produced as TIFF or JPEG 2000 (JP2) files and shall meet all applicable FADGI 3-Star image-quality and
technical requirements.
The contractor is responsible to appropriately scan each original source document, with scanner settings
established for each image scanned as appropriate to ensure the 100% accuracy of image capture. Images
must be scanned appropriately for accurately capturing all color, grayscale, and text values as applicable
and in accordance with all contract requirements.

Page 7 of 9 Jacket 452-072
SCHEDULE: Adherence to this schedule must be maintained. See "Notice of Compliance with Schedules", in
GPO Pub. 310.2.
Purchase Order will be e-mailed from U.S. Government Publishing Office by: October 1, 2026.
Deliver completed product (All scans completed, named, and hard drives delivered) no later than
September 30, 2027 (12 Months)
Contractor to make arrangements after award to pick up 17 estimated boxes from the location listed below.
ALL COSTS FOR PICK UP OF DOCUMENTS TO BE INCLUDED IN THE BID UNDER LINE ITEM 3.
ALL COST FOR SHREDDING 17 BOXES TO BE INCLUDED IN THE BID UNDER LINE ITEM 2.
RECEIPT FOR DELIVERY: As applicable, the contractor must furnish their own receipts for deliveries. These
receipts must include the GPO jacket number; total quantity delivered number of cartons, and quantity per carton;
date delivery made; and signature of the Government agent accepting delivery. The original copies of these
receipts must accompany the contractor's voucher for payment.
DISTRIBUTION: F.O.B. Destination. All pickup and shredding charges are to be included in the bid.
Hard drives to be delivered to ATTN: Thomas Adams/ Melissa Griffin, United States Army Reserve Command,
4710 Knox Street, Fort Bragg, NC 28310
ALL BOXES TO BE PICKED UP BY October 16, 2026
Contractor to store all digitized files/ boxes of originals for at a minimum of 6 months once scanning has been
completed. Written approval will be provided once files have been reviewed and accepted provided by GPO.
DETERMINATION OF AWARD: The Government will determine the lowest offer by applying the prices
listed in the "Schedule of Prices" to the following units of production which are the estimated requirements to
produce under this contract. These units do not constitute, nor are they to be construed as, a guarantee of the
volume of work which may be ordered. The bidder must make an entry in each of the spaces provided.
The following item designations correspond to those listed in the "Schedule of Prices."
1. Microfiche
2. Shredding
3. Transportation

Page 8 of 9 Jacket 452-072
SCHEDULE OF PRICES (PAGE 1 OF 2)
Prices must include the cost of all required materials and operations for each item listed in accordance with these
specifications. Bidder must make an entry in each of the spaces provided. Bids submitted with any obliteration,
revision, or alteration of the order and manner of submitting bids, may be declared nonresponsive.
An entry of NC (No Charge) shall be entered if bidder intends to furnish individual items at no charge to the
Government. Bids submitted with NB (no bid), NA (not applicable), or blank spaces for an item may be declared
non-responsive.
The Contracting Officer reserves the right to reject any offer that contains prices for individual items of
production (whether or not such items are included in the Determination of Award) that are inconsistent or
unrealistic in regard to other prices in the same offer or to GPO prices for the same operation if such action would
be in the best interest of the Government. All vouchers submitted to the GPO shall be based on the most
economical method of production.
INCLUDE THE FOLLOWING YOUR BID
ITEM PRICE Added Rate/Each
1. Microfiche (51,000 cards) $ $
2. Shredding (17) $ $
3. Transportation (17) $ $
TOTAL BID: $_________________
DISCOUNTS: Discount is offered for payment as follows: _________ Percent, _______calendar days. See
Article 12 "Discounts" of Solicitation Provisions in GPO Contract Terms (Publication 310.2).
BID ACCEPTANCE PERIOD: In compliance with the above, the undersigned agree, if this bid is accepted
within____________ calendar days (60 calendar days unless a different period is inserted by the bidder) from the
date for receipt of bids, to furnish the specified items at the price set opposite each item, delivered at the
designated points(s), in exact accordance with specifications.
Failure to provide a 60-day bid acceptance period may result in expiration of the bid prior to award.
AMENDMENT(S): Bidder hereby acknowledges amendment(s) number(ed) ____________________
(Initials)
***NOTE: SUBMIT BOTH PAGES 8 AND 9 VIA EMAIL (BIDS@GPO.GOV)***

Page 9 of 9 Jacket 452-072
SCHEDULE OF PRICES (PAGE 2 OF 2)
BIDDER'S NAME AND SIGNATURE: Unless specific written exception is taken, the bidder, by signing and
submitting a bid, agrees with and accepts responsibility for all certifications and representations as required by the
solicitation and GPO Contract Terms - Publication 310.2. When responding by email, fill out and return one
completed copy of all applicable pages (pgs. 8 - 9) that include the Jacket Number, Bid/Unit Prices, Discounts,
Amendments, Bid Acceptance Period, and Bidder's Name and Signature, including signing where indicated.
Valid electronic signatures will be accepted in accordance with the Uniform Electronic Transactions Act, 2.
Electronic signatures must be verifiable of the person authorized by the company to sign bids.
Failure to sign the signature block below may result in the bid being declared non-responsive.
_________________________________________ ___________________________________________
(Company Name) (GPO Contractor's Code)
(Street Address, City, State and Zip Code)
_________________________________________________________________________________________
(Printed Name and Title) (Telephone number)
_________________________________________________________________________________________
(Signature) (Date)
(E-Mail) (Facsimile Number)
************************************************************************************
THIS SECTION FOR GPO USE ONLY
Contracting Officer Review ____________ Date ___________ Certifier _______________ Date
(initials) (initials)
***NOTE: SUBMIT BOTH PAGES 8 AND 9 VIA EMAIL (BIDS@GPO.GOV)***

This page summarizes the opportunity, including an overview and a preview of the attached documents.
Get Government Bids Like This by Email Receive daily bid alerts that match your keywords, business categories, and target regions.

See Also

Project: Property Management Services Ref. #: RFP 27-004 Department: OFA Type: RFP Status:

Metropolitan Washington Council of Governments.

Due by 10/21/2026

Follow Household Goods Moving, Shipping, Transportation, and Storage Service Providers Software Integration Request

DEPT OF DEFENSE

Due by 9/30/2026

Follow NASA Launch Services II (NLS-II) 2026 On-Ramp Active Contract Opportunity Notice ID

NATIONAL AERONAUTICS AND SPACE ADMINISTRATION

Due by 10/05/2026

* Disclaimer: This website provides information about bids, requests for proposals (RFPs), or requests for qualifications (RFQs) for convenience only and does not serve as an official public notice. Individuals who wish to respond to or inquire about bids, RFPs, or RFQs should contact the relevant government department directly.