| Agency: | UCLA Capital Programs |
|---|---|
| State: | California |
| Type of Government: | State & Local |
| Posted Date: | Sep 10, 2025 |
| Due Date: | Sep 30, 2025 |
| Solicitation No: | 943719.01 |
| Original Source: | Please Login to View Page |
| Contact information: | Please Login to View Page |
| Bid Documents: | Please Login to View Page |
| Project Name | UCLA Westwood Center Suite 300 Reconfiguration |
| Project Number | 943719.01 |
| Project Description |
Subject to conditions prescribed by the University of California, Los Angeles, sealed bids for a lump sum contract are invited for the following work:
The scope of work is to reconfigure and renovate Suites 300, 315, 320, and 330, totaling approximately 6,520 gsf (6,264 asf), on the third floor of the UCLA Westwood Center to consolidate them into a single larger suite to be occupied by UCLA Health Planning, Design, and Construction team. The renovated space would provide open-office space, a private office, four restrooms, a breakroom, four booths, three conference rooms, a storage room, a plotter room, and a materials library. The UCLA Westwood Center, located at 924 Westwood Blvd is a 292,867 gsf (121,093 asf) 11-story building, with three basement levels and a mezzanine floor, constructed in 1972. The existing telecommunication room and Suite 350 would remain as-is. The proposed scope of work includes interior demolition; installation of new partitions, ceilings, and flooring; new interior finishes; and modifications to mechanical, electrical, and plumbing systems to support the new program. Asbestos-containing materials is present and would be abated prior to construction. Prime Contractor to select Abatement Contractor. Krieger Environmental to oversee all abatement work by University Representative. All work to be performed after-hours. The estimated construction cost is $2,955,000.00. TO VIEW AND DOWNLOAD ALL FURTHER INFORMATION (PREQUALIFICATION DOCUMENTS IF ANY; BIDDING DOCUMENTS; ADDENDA IF ANY; CONFERENCE/JOB WALK SIGN-IN SHEET; PLANHOLDERS LIST; PREQUALIFIED BIDDERS, IF ANY, ETC.), CLICK HERE: UCLA ONLINE PLANROOM |
| Estimated Construction Cost | $2,955,000.00 |
| 7723837 |
With Free Trial, you can:
You will have a full access to bids, website, and receive daily bid report via email and web.
Follow Peter Pepper Products healthFirst Freestanding Infection Prevention Stand Active Contract Opportunity Notice
VETERANS AFFAIRS, DEPARTMENT OF
Bid Due: 8/26/2026
Basic Information Title Modified Gaming Consoles for CCHCS Agency Dept of Corrections &
State Government of California
Bid Due: 9/01/2026
Project ID: Title: Purchase and Delivery of Electric Parts as Needed for Stock
City of Palo Alto
Bid Due: 9/01/2026
RFx Name: BPM012829 RFx Begin Date (UTC+0): RFB - LOS PENASQUITOS CANYON PRESERVE
County of San Diego
Bid Due: 9/11/2026