Tyonek - Water Distribution System Replacement Project

Agency: ALASKA NATIVE TRIBAL HEALTH CONSORTIUM
State: Alaska
Type of Government: State & Local
NAICS Category:
  • 237110 - Water and Sewer Line and Related Structures Construction
Posted Date: Jan 15, 2026
Due Date: Jan 27, 2026
Solicitation No: IFB ANTHC 26-B-12534
Original Source: Please Login to View Page
Contact information: Please Login to View Page
Bid Documents: Please Login to View Page

Description

Project: Tyonek - Water Distribution System Replacement Project
Ref. #: IFB ANTHC 26-B-12534
Type: IFB
Status:
Open
Open Date: Dec 4th 2025, 3:00 PM AKST
Questions Due Date: Jan 20th 2026, 4:00 PM AKST
Contact Information: Kristina Vnuk, kavnuk@anthc.org
Close Date: Jan 27th 2026, 3:30 PM AKST

Project Description: The Project includes phased construction of domestic water system improvements as the following:
Phase 1: Work of this Phase includes installation of approximately 2,200 linear feet (LF) of 8-inch arctic high density polyethylene (HDPE) pipe to replace the existing 8-inch ductile iron pipe (DIP) water main in the Indian Creek Subdivision (ICS), new hydrant assemblies, replacement of twenty-four (24) copper water services with jacketed insulated PEX pipe services with buried curb stops. Services will include electrical heat trace and home electrical connections with new circuit breaker.
Phase 2: Work of this Phase includes installation of approximately 1,800 LF of 8-inch arctic HDPE transmission main from the ICS to Lower Village distribution main, installing new pressure pumps, pipe connections, pressure switches and control panel in the water treatment plant.
The Contractor shall furnish all labor, materials, equipment, tools, services, testing, and incidentals to complete all Work for each Phase required by these Specifications and as shown on the Drawings.
Anticipated Schedule:
The Project has an expected substantial completion date of September 30, 2027 and final completion date of October 31, 2027.
Award Statement:
Award will be for either Phase 1 or Phase 2, whichever phase is within the available funding. ANTHC anticipates having funding available for a single phase; however, it reserves the right to award both phases should additional funding become available within the Bid Acceptance Period.


Get Government Bids Like This by Email Receive daily bid alerts that match your keywords, business categories, and target regions.

See Also

Project: ANMC Clean Steam Generator Replacement Ref. #: 27-B-13906 Type: IFB Status: Open

ALASKA NATIVE TRIBAL HEALTH CONSORTIUM

Due by 11/27/2026

ITB 2027-802 KINCAID ELEMENTARY SCHOOL SITE IMPROVEMENTS Click here to be added to

Anchorage School District

Due by 12/02/2026

Follow Alaska Construction IDIQ Sources Sought Active Contract Opportunity Notice ID 20261019 Related

GENERAL SERVICES ADMINISTRATION

Due by 11/19/2026

Basic Information Title ITB: . 0091022/SFHWY00696; KTN Ferry Terminal Electrical and Mechanical Improvements

State Government of Alaska

Due by 11/19/2026

* Disclaimer: This website provides information about bids, requests for proposals (RFPs), or requests for qualifications (RFQs) for convenience only and does not serve as an official public notice. Individuals who wish to respond to or inquire about bids, RFPs, or RFQs should contact the relevant government department directly.