Tucson Street Improvements from Olive Avenue to Aspen Including Intersection Improvements at Olive Avenue
| Agency: | City of Broken Arrow |
|---|---|
| State: | Oklahoma |
| Type of Government: | State & Local |
| NAICS Category: |
|
| Posted Date: | Mar 4, 2025 |
| Due Date: | Mar 28, 2025 |
| Original Source: | Please Login to View Page |
| Contact information: | Please Login to View Page |
| Bid Documents: | Please Login to View Page |
Description
- Start Date: 03/04/2025 10:00 a.m.
- Close Date: 03/28/2025 3:00 p.m.
The City of Broken Arrow, Oklahoma is hereby soliciting a Request for Qualifications (RFQ) from qualified Architect/Engineering (A/E) design firms for an Engineering and Construction Transportation Infrastructure project.
The professional services contract is for a street improvement project on Tucson Street from Olive Avenue to Aspen Avenue including intersection improvements at Olive Avenue. The project includes the design and production of contractor bid documents for the widening and improvements of an existing two-lane roadway located on Tucson Street between Olive Avenue and Aspen Avenue including the intersection of Tucson Street and Olive Avenue. Tucson Street is a 2-lane asphaltic concrete roadway in this location, with an existing bridge structure. The existing structure is a 3-cell 8’ x 8’ x 48’ RCB, skewed, constructed in 2007. An ODOT Bridge Inspection Report (CN 77, NBI 28736), is attached for reference. This project will also include the design of improvements or replacement of the existing bridge. All A/E firms interested in this project must submit a Statement of Qualifications (SOQ) in accordance with the Statement of Qualifications Requirements. All SOQ’s must be submitted no later than 3:00 pm on March 28, 2025 and should be addressed to Charlie Bright, P.E., Director of the Engineering & Construction, City of Broken Arrow, 485 N. Poplar Avenue, Broken Arrow,
Oklahoma, 74012, with the following label: “Tucson Street Improvements from Olive Avenue to Aspen Avenue Including Intersection Improvements at Olive Avenue”.
See Also
Follow 2-STEP SEALED BID - TINKER AFB WWYK250019 Remove and Replace Fire Sprinkler
DEPT OF DEFENSE
Due by 12/30/2026
Follow WWYK260004 - REPAIR STRUCTURAL INTEGRITY, B1134, POST 34 & NORTH WALL Active
DEPT OF DEFENSE
Due by 11/16/2026
Bid Title: Street Improvement-Queens Avenue-SST 27-1 Category: Engineering Status: Open Description: Notice To
City of Ponca City
Due by 11/11/2026
Bid Number: RFB 26-78 Bid Title: Ozark Trail Marker Obelisk Category: Requests for
City of Miami
Due by 12/03/2026