Truck Bed Upgrade on Oconee Ranger District, Georgia
| Agency: | AGRICULTURE, DEPARTMENT OF |
|---|---|
| State: | Georgia |
| Type of Government: | Federal |
| FSC Category: |
|
| NAICS Category: |
|
| Set Aside: | Total Small Business Set-Aside (FAR 19.5) |
| Posted Date: | Jul 9, 2026 |
| Due Date: | Jul 19, 2026 |
| Solicitation No: | 12444026Q0126 |
| Original Source: | Please Login to View Page |
| Contact information: | Please Login to View Page |
| Bid Documents: | Please Login to View Page |
Description
APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.
APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.
The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).
- Contract Opportunity Type: Combined Synopsis/Solicitation (Original)
- Original Published Date: Jul 09, 2026 01:50 pm EDT
- Original Date Offers Due: Jul 19, 2026 09:00 am EDT
- Inactive Policy: 15 days after date offers due
- Original Inactive Date: Aug 03, 2026
-
Initiative:
- None
- Original Set Aside: Total Small Business Set-Aside (FAR 19.5)
- Product Service Code: J023 - MAINT/REPAIR/REBUILD OF EQUIPMENT- GROUND EFFECT VEHICLES, MOTOR VEHICLES, TRAILERS, AND CYCLES
-
NAICS Code:
- 811121 - Automotive Body, Paint, and Interior Repair and Maintenance
-
Place of Performance:
GA 31024USA
*see attachments
Statement of Work (SOW)
2026 Chevrolet 3500 HD (Single Rear Wheel)
OEM Bed Removal and Installation of CM Truck Bed – Model 8'6/84/54/42
1. Vehicle Information
• Make/Model: 2026 Chevrolet 3500 HD
• Configuration: Single Rear Wheel
• Current Condition: Equipped with factory‑installed OEM pickup bed and back up camera on factory installed bed
• VIN: 1GC4KSEY1TF291258
2. Contractor Responsibilities
The contractor shall perform the following:
A. Removal of Factory Bed
• Safely disconnect all electrical, back up camera, sensors, fuel filler, and auxiliary connections tied to the OEM pickup bed.
• Remove factory bed without damage to the truck frame, chassis wiring, or components.
• Inspect and clean mounting points on the frame after bed removal.
B. Preparation for Upfit
• Verify chassis measurements and mounting compatibility for CM model 8'6/84/54/42.
• Ensure all wiring harnesses, lighting connectors, and fuel filler components are positioned for proper integration with the new bed.
• Provide any necessary mounting hardware if not included by the manufacturer.
C. Installation of CM Truck Bed (Model 8'6/84/54/42)
• Properly mount and secure the CM bed to manufacturer specifications and torque requirements.
• Align and install fuel filler neck, rear lighting, license plate lighting, and reverse sensors (if applicable).
• Connect and test all electrical systems including brake lights, turn signals, reverse lights, and marker lights.
• Ensure the bed sits level, securely fastened, and free of vibration or interference with vehicle components.
D. Quality Check and Testing
• Perform full inspection confirming structural security, proper alignment, and correct electrical function.
• Test vehicle lighting and safety systems to ensure compliance with DOT requirements.
• Verify proper clearance between bed, tires, frame, and suspension components.
3. Deliverables
• Completed removal of OEM bed
• Fully installed CM Truck Bed (Model 8'6/84/54/42)
• Documentation of all work performed
4. Schedule
• Work to begin on: 8/1/26
• Estimated completion: 8-12 weeks
5. Acceptance Criteria
The installation will be considered complete when:
• CM bed is mounted to manufacturer specifications
• All electrical and safety systems function correctly
• No fault codes or warning indicators are present
• Vehicle passes final inspection by the government/agency representative
6. Additional Requirements
• Contractor must follow all safety protocols and industry standards.
• Any changes, unexpected issues, or additional parts required must be approved before proceeding.
- 1720 Peachtree ST NW STE 876S
- Atlanta , GA 303092449
- USA
- Katie Morgan
- katie.morgan@usda.gov
- Phone Number 7064857110138
- Richard Kandrach - Contracting Specialist
- richard.kandrach@usda.gov
- Phone Number 9289139283
- Jul 09, 2026 01:50 pm EDTCombined Synopsis/Solicitation (Original)
Related Document
| Jul 20, 2026 | [Award Notice (Original)] Truck Bed Upgrade |
See Also
Follow C-5 MLG Trunnion Bearing Active Contract Opportunity Notice ID FA8538260019 Related Notice
DEPT OF DEFENSE
Due by 10/27/2026
Event ID Event Title Government Entity Start Date (ET) End Date (ET) PE-66096-NONST-2026-000000195
State Government of Georgia
Due by 9/15/2026
Follow Refrigeration Service for LDC at Fort Stewart, GA Active Contract Opportunity Notice
DEPT OF DEFENSE
Due by 9/14/2026
Event ID Event Title Government Entity Start Date (ET) End Date (ET) PE-67500-NONST-2027-000000176
State Government of Georgia
Due by 10/06/2026