NOTICE INVITING BIDS
TO FURNISH
TREE LINE INSPECTION SERVICES
FOR THE
CITY OF REDDING, CALIFORNIA
(Bid Number #5726)
August 3, 2026
In accordance with the provisions of the Municipal Code of the City of Redding, sealed bids
will be received by the City of Redding, at the 3rd Floor City Clerk’s Office at City Hall, 777
Cypress Avenue, Redding, California 96001-2718, until 3:00 P.M. PT, Tuesday, August 25, 2026,
to furnish tree line inspection services to the City of Redding / Redding Electric Utility, per the bid
specifications and general conditions.
BIDS RECEIVED AFTER THIS TIME AND DATE WILL NOT BE ACCEPTED OR CONSIDERED.
The said bids will be opened at 3:00 P.M. PT, on Tuesday, August 25, 2026, in the designated
City Hall Conference Room as posted in the main lobby of City Hall, 777 Cypress Avenue,
Redding, California.
Pre-Bid Conference Scheduled on Tuesday, August 11, 2026 at 8:00 A.M. PT to 10:30 A.M. PT,
in the Conference Room, City of Redding, Parks Building No. 4, 20055 Viking Way, Redding,
California 96003. Attendance is strongly recommended.
All bids must be submitted on standard bid forms provided by the City of Redding. The
bidder shall provide one (1) original (unbound) and one (1) complete copy of the bid
proposal submission. Fax or electronic submission of bid proposals will not be allowed.
The City will award any resulting contract in a manner consistent with the City’s purchasing
ordinance.
The cut-off date and time for receiving questions regarding this bid is 5:00 P.M. PT,
on Wednesday, August 12, 2026. All inquiries must be made in writing and may be submitted
to the email address shown below.
THE CITY OF REDDING
Purchasing Division
Jennifer Antunes
Jennifer Antunes, Buyer
jantunes@cityofredding.gov
NOTE
If a potential bidder/proposer received this solicitation document through
some means other than surface mail from the City of Redding (such as from the City
of Redding Internet web site, or from another prospective bidder/proposer), it is the
responsibility of the potential bidder/proposer to advise the assigned City of Redding
Purchasing contact of its intention to submit a bid/proposal so that any addenda or
other correspondence related to this solicitation will be sent to the potential
bidder/proposer. When contacting the Purchasing Division, the bidder/proposer shall
provide the solicitation number located on the cover page of this document.
Transmittal of this information must be in writing, by U.S. Mail, or e-mail.
Transmittal of this information via telephone is not acceptable.
Please submit bid on enclosed form only. Forward to:
City of Redding
City Clerk
777 Cypress Avenue
Redding, CA 96001
Mailing envelope is to be clearly marked on the outside with the following notation:
“Bid on Schedule No. 5726; opening at
3:00 P.M. on Tuesday, August 25, 2026”
Bids may not be considered unless:
1. Your original Bid submittal and the stated number of copies are received.
2. Original Bid proposal form is completed and signed in ink.
3. Signature is legible – No initials.
4. “Required w/ Submission” forms are completed and/or included.
5. Addendums are acknowledged (If any)
The City of Redding
Purchasing Division
FURNISH
TREE LINE INSPECTION SERVICES
FOR THE
CITY OF REDDING, CALIFORNIA
(Bid Number 5726)
I. GENERAL BACKGROUND
The City of Redding (City) is a general law city of the State of California, located
approximately 160 miles north of Sacramento and has a population of approximately
92,000. Redding Electric Utility (REU), a department of the City, is a publicly owned, not-
for-profit electric utility with approximately 44,900 customers.
The REU distribution system is frequently subject to fire hazards because of its semi-rural
setting and the local climate. Summer months are hot and dry and occasionally include
thunderstorms with minimal precipitation but intense lightning. Fall months are generally
dry and occasionally windy. These conditions contribute to significant fire risk.
REU has a large and geographically diverse service area and is the distribution service
provider for an area of 61 square miles. The distribution system has approximately 746
miles of 12,000-volt (12kV) power lines, approximately 72 miles of 115,000-volt (115kV)
transmission lines, and approximately 7,500 transformers within its service area.
II. SCOPE OF WORK
A. The purpose of this solicitation is to obtain a minimum of Two (2) Certified
Arborists/Foresters to patrol and inspect REU’s overhead power lines (see Attachment
#1). The selected Contractor will use geographic information system (GIS) Field Maps
based data files to create inspection points gathered during the term of the contract for
REU tree crews or future Contract crews. All utility assets will be preloaded prior to the
start of work. While minor variations between the map overlay and actual field locations
may occur, inspectors are not expected to correct or validate asset locations. If major
discrepancies are found between GIS data and actual field conditions, the contractor
shall provide the pole number(s) to the REU Vegetation Management Representative
for further review/updates. No special format is required, as the Field Maps application
includes a built-in camera capture feature that ensures photo documentation is stored in
the correct format for REU systems. Contractor is to supply labor, transportation,
equipment, mobilization, etc. to complete this project. REU to provide access to (GIS)
Field Maps data files (GIS Feature Class files) for successful bidder to install on their
own devices/equipment or REU/GIS will provide successful bidder an iPad (for use
under contract only) with appropriate software installed. Cellular connectivity is not
required in the field, data can be captured offline and synced later. The contractor will
be responsible for the following items:
a) Perform visual inspections of trees using the Tree Risk Assessment
Qualifications (TRAQ) method of tree inspections using a Field Maps based
data file. Complete detailed inspections on REU’s 300 miles of overhead
1
lines within Tier 3/2 high fire threat areas and entirety of REU electrical
system. Priority will be given to Tier 3 first followed by Tier 2 and
subsequently all remaining overhead lines; see mileage data in Section I.
b) Document all inspections on a tablet using appropriate software to
encompass all Requirements of Redding Electric Utility (REU) as well as
California Public Utilities Commission General Order 95 (G.O. 95) tree
clearance requirements for Tier 3/2 and remaining areas. G.O. 95 Rule 35
including Appendix E, Case 13, Table 1 radial clearances will be used for
non-high fire threat areas where practicable. Case 14, Table 1 radial
clearances will be used for Tier 3 and Tier 2 high fire threat areas where
practicable.
c) The Contractor will follow the REU tree policy guidelines during all
inspections which includes no overhangs on 115kV lines and maintains a
minimum clearance of 15 feet for overhangs on 12kV lines.
d) The Contractor will be required to inspect low-voltage secondary services
attached to homes and businesses, looking for “strain and abrasion” per
G.O. 95, Rule 35. They will also be required to inspect secondary
conductors from structure to structure (i.e., pole-to-pole).
e) Contractor shall supply all labor, transportation, equipment, deliverables,
incidentals, and mobilization to complete the job as described herein.
f) Workdays shall be Monday through Friday, 8:00 am to 5:00 pm, excluding
City Holidays or as agreed upon with the City of Redding representative.
g) Contractor shall complete Phase 1 and Phase 2 of the inspection work in
accordance with the defined timeframes and contract requirements.
h) Contractor shall remain available for emergency inspection work at any
point during the contract term, including the period between Phase 1 and
Phase 2. The Contractor is expected to respond to such requests within 48
hours of notice, for events such as Public Safety Power Shutoffs, extreme
weather events, or other unplanned emergency service needs. Emergency
work will be authorized on a case-by-case basis and billed at the approved
T&E rates included on Bid Proposal Form.
i) For emergency T & E work, the muster point shall be the REU Corporation
Yard, 20055 Viking Way Building #2, Redding, CA 96003. Billable time
will begin upon check-in at the muster point.
B. Phase 1 – Annual System Inspection
a) Phase 1 includes a complete inspection of ALL ASSIGNED OVERHEAD
AND SERVICE UTILITY ASSETS.
2
b) This phase shall be completed no later than December 31, 2026. Refer to the
liquidated damages section VIII.
c) All inspection records shall be completed during Phase 1. This includes
documenting all applicable vegetation conditions with entries for P1, P2, P3,
Facility Protection (FP), Removal, and No Work Required.
C. Phase 2 – Mid-Year Re-inspection Cycle
a) Phase 2 shall occur between May 17, 2027 and July 23, 2027. This phase is
intended to:
1. Reinspect previously trimmed spans for regrowth or follow-up
needs.
2. Identify any trees missed during Phase 1.
3. Vegetation that requires immediate action (P1 Inspection).
4. Identify new dead/dying vegetation with strike potential.
5. Minimum of (1) one Certified Arborist required
D. Emergency/ Additional Inspections – Time and Equipment (T&E) for additional
Inspector(s). City of Redding representative - Primary Point of Contact: Kyle Oilar,
Electric Line Supervisor- Vegetation Management; koilar@cityofredding.gov or (530)
224-4356.
a) For all emergency Time and Equipment (T&E) work, including straight
time and overtime, the Contractor shall check in and check out with a City
of Redding representative at the start and end of each workday. This may
be done in person, by phone/text, or via email, and is required to verify
hours worked. Failure to properly report time may result in denial of payment
for unverified hours.
1. An estimated (up to) (30) Thirty potential inspection days may be
needed throughout the contract term to address weather-related
events and other planned/unplanned service needs. These
additional inspections are anticipated to cover unforeseen
inspection situations. Billed under the optional Time and
Equipment (T&E) provision if requested and authorized.
b) Emergency inspections may be requested on a T&E basis due to:
1. Public Safety Power Shutoffs (PSPS).
2. Extreme weather events.
3. Unplanned emergency service needs.
3
This page summarizes the opportunity, including an overview and a preview of the attached documents.