| Agency: | Kissimmee Utility Authority |
|---|---|
| State: | Florida |
| Type of Government: | State & Local |
| NAICS Category: |
|
| Posted Date: | Sep 25, 2025 |
| Due Date: | Oct 14, 2025 |
| Solicitation No: | IFB 25-072-JG |
| Original Source: | Please Login to View Page |
| Contact information: | Please Login to View Page |
| Bid Documents: | Please Login to View Page |
| Date | Time | Mandatory | Location |
| Date | Time | Location |
| # | Required | Group | Make | Model | Description | Quantity | Unit of Measure | Price/ Percent | Type |
| Question | Date Asked | Answer | Date Answered |
| Is there an anticipated delivery need date for this material? | 9/11/2025 12:12:27 PM | July 1, 2026 | 9/16/2025 5:54:15 PM |
|
Could you please accept our company MVA POWER as approved manufacturer-Supplier For Steel poles Structures .
Our Plant located in Shanghai China. we are already supply many project of Tubular Steel Structures and Standard Steel Structures to many District and PUD in USA . Thank you |
9/17/2025 2:56:31 PM | Approved Manufacturers – The manufacturing plant for all poles and structures delivered must be located within the USMCA region. Suppliers or manufacturers that cannot meet this requirement are not approved for use. | 9/19/2025 1:15:04 PM |
|
Please provide Back files and Lca. for this request.
thank you |
9/18/2025 8:39:37 AM | The supporting background documents and the load calculation analysis can be found in the PDF file titled “IFB 25-072-JG Transmission & Substation Structures for Van Meter Substation”, specifically in Exhibit B, Section 3 – Specifications (pages 46–83). | 9/19/2025 1:15:24 PM |
|
Good morning
please provide Back files & Lca. for this request thank you |
9/19/2025 8:11:08 AM | The supporting background documents and the load calculation analysis can be found in the PDF file titled “IFB 25-072-JG Transmission & Substation Structures for Van Meter Substation”, specifically in Exhibit B, Section 3 – Specifications (pages 46–83). | 9/19/2025 1:15:38 PM |
| In the drawing "22-S-1021", there is only one Lightning Mast. It looks like LM1-LM6 is going to be the same Lightning Mast with different span . Can you verify with the client if we can design the Lightning mast with controlling/max span cases and quantity of 6? | 9/24/2025 8:16:32 AM | There is no wire between the lightning masts. As seen on drawing 22-S1021, we will instead be using Spline Ball Ionizers. Quantity of six lightning masts and quantity of one termination structure as can be seen on the General Arrangement drawing 22-E-1000. | 9/25/2025 4:48:14 PM |
| Can the bid be extended one week to 10/14? | 9/25/2025 2:49:24 PM | Yes, KUA has extended the bid due date to Tuesday, October 14, 2025. | 9/25/2025 4:47:41 PM |
| Code | Description |
| [285-84] | Transformers, Transmission Line Type |
| [839-60] | Poles, High Voltage Transmission |
| [925-78] | Power Generation, Transmission, Distribution - Engineering |
| [936-77] | Substation/High Voltage (Electrical) Maintenance and Repair |
| [285-3] | Arresters, Lightning |
| [839-60] | Poles, High Voltage Transmission |
| [285-74] | Pole Line Hardware: Anchors, Arms, Bolts, Braces, Brackets, Clevises, Connections, Insulators, Plates, Pole Steps, Racks, Rods, Shackles, Straps, Thimbles, Washers, etc. (See 765-95 for Wire Rope Accessories) |
| Publication | Date |
With Free Trial, you can:
You will have a full access to bids, website, and receive daily bid report via email and web.
Project ID: Title: Police K-9 Compound (Project No. 22209-118) Addenda: 0 Release Date:
City of St. Petersburg
Bid Due: 6/09/2026
RFQ-26-C-00022 26-C-00022 Howard F. Curren AWTP Aquifer Recharge Wells Pumping System Design-Build View
City of Tampa
Bid Due: 6/11/2026
Project ID: Y26-740 Title: Reams Road Improvement Project - Summerlake Park Blvd to
Orange County
Bid Due: 6/04/2026
Follow P683 AIRCRAFT ENGINE REPAIR FACILITY, NAVAL AIR STATION(NAS), JACKSONVILLE, FLORIDA Active Contract
DEPT OF DEFENSE
Bid Due: 6/09/2026