The scope of work includes installing two new foundations to perform a cut-in on the existing transmission Circuit 941 to interconnect with the new Miller Substation and FRP.
| Agency: | JEA |
|---|---|
| State: | Florida |
| Type of Government: | State & Local |
| NAICS Category: |
|
| Posted Date: | Mar 13, 2026 |
| Due Date: | Mar 27, 2026 |
| Original Source: | Please Login to View Page |
| Contact information: | Please Login to View Page |
| Bid Documents: | Please Login to View Page |
Description
The scope of work includes installing two new foundations to perform a cut-in on the existing transmission Circuit 941 to interconnect with the new Miller Substation and FRP. As part of the work, Circuit 941 will be split into two circuits: Circuit 975, which will connect to the existing Normandy Substation, and Circuit 941, which will continue to the existing Brandy Branch Substation. The transmission portion of the work is anticipated to be performed by a foundation contractor, with a transmission subcontractor required to hold the outage on Circuit 941. The contractor responsible for the outage must be qualified to obtain a JEA hold tag and operate breakers to safely perform the outage in accordance with the specifications and Appendix A. The contractor shall provide all materials, equipment, labor, and supervision necessary to complete the work in accordance with the construction plans and specifications, including coordinating the pickup, inspection, receipt, unloading, and installation of JEA-supplied materials at the job site in alignment with the anticipated delivery schedule.
USE THIS LINK TO ACCESS THE SOLICITATION VIA ZYCUS
https://zsn.zycus.com/guest/genericRegister/JEA074/iSource/1032510/
Mandatory Pre-Bid Meeting: March 18, 2026
Solicitation Due Date: March 27, 2026
See Also
Follow Y1DA--573-21-106 EHRM Infrastructure Upgrades and Data Center Construction - Gainesville VAMC Active
VETERANS AFFAIRS, DEPARTMENT OF
Project ID: ITB-2026-050 Title: INVITATION TO BID: Highland Village Stormwater Improvements Project (Phase
City of North Miami Beach
Due by 11/10/2026
Main Agency Brevard County Board of County Commissioners Status Active Fiscal Year 2027
Brevard County Board of County Commissioners
Due by 11/10/2026
Main Agency City of Holly Hill Status Active Fiscal Year 2027 Primary Contact
City of Holly Hill
Due by 12/16/2026