| Agency: | COMMERCE, DEPARTMENT OF |
|---|---|
| State: | Oklahoma |
| Type of Government: | Federal |
| FSC Category: |
|
| NAICS Category: |
|
| Set Aside: | Total Small Business Set-Aside (FAR 19.5) |
| Posted Date: | Jul 13, 2026 |
| Due Date: | Jul 21, 2026 |
| Solicitation No: | 1305M226Q0038 |
| Original Source: | Please Login to View Page |
| Contact information: | Please Login to View Page |
| Bid Documents: | Please Login to View Page |
APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.
APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.
The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).
The Government is seeking a 5-year IDIQ for the following:
Eaton 93PM UPS and maintenance bypass module (MBM) and Battery cabinet with batteries installed at sites specified in Table 3 of the SON (any associated installation travel costs must be built in to the per unit pricing).
Eaton 93PM UPS and MBM sidecar and Battery cabinet with batteries installed at the sites prescribed in Table 3 of the SON (any associated installation travel costs must be built in to the per unit pricing).
and;
Eaton 93PM UPS and sidecar w/MBM and Battery cabinet WITHOUT batteries; shipped to the National Logistics Support Center. (NO INSTALLATION)
Vendors are responsible for providing all information and documentation listed in Section L- Instructions, Conditions, and Notices to Bidders of attachment Sol_1305M226Q0038, including Volume I: Technical Compliance, Volume II: Installation Plan, Volume Ill: Past Performance, and Volume 4: Price. Evaluation information for those volumnes are provided in Section M - Evaluation Factors for Award. Failure to provide ALL required documents on time will result in submissions being deemed non responsive.
Amendment 1: posted 7/1/26; includes questions submited during the inquiries period with their respective answers. Additionally, an Excel document is attached that is referenced in the Q&A document.
Amendment 2: posted 7/6/26; no additional documents are included. This amendment only extends the response due date one week to 7/14/26 1:00pm ET.
Amendment 3: posted 7/13/26; no additional documents are included. This amendment only extends the response due date one additional week to 7/21/26 1:00pm ET.
| Jun 17, 2026 | [Presolicitation (Original)] TPS Installation IDIQ Presolictation Notice |
| Jun 22, 2026 | [Solicitation (Original)] Transition Power Supply Installation IDIQ with the Radar Operations Center |
| Jul 1, 2026 | [Solicitation (Updated)] Transition Power Supply Installation IDIQ with the Radar Operations Center |
| Jul 6, 2026 | [Solicitation (Updated)] Transition Power Supply Installation IDIQ with the Radar Operations Center |
With Free Trial, you can:
You will have a full access to bids, website, and receive daily bid report via email and web.
Follow F16_Panel_Distribution_NSN6110012758549_PN16E2504841 Active Contract Opportunity Notice ID F16_Panel_Distribution_NSN6110012758549_PN16E2504841 Related Notice Department/Ind. Agency DEPT
DEPT OF DEFENSE
Bid Due: 12/15/2027
UPS Batteries Replacement Project for the Hamm Institute UPS Batteries Replacement Project for
Oklahoma State University
Bid Due: 8/13/2026
UPS Batteries Replacement Project for the Hamm Institute UPS Batteries Replacement Project for
Oklahoma State University
Bid Due: 8/13/2026