TRAMONTO DRIVE (17537) BULKHEAD
| Agency: | City of Los Angeles |
|---|---|
| State: | California |
| Type of Government: | State & Local |
| Posted Date: | Aug 7, 2026 |
| Due Date: | Sep 2, 2026 |
| Solicitation No: | 231310 |
| Original Source: | Please Login to View Page |
| Contact information: | Please Login to View Page |
| Bid Documents: | Please Login to View Page |
Description
| Opportunity ID | 231310 |
| Organization | City of Los Angeles |
| Department | Engineering Bureau, Public Works |
| Stage | Open |
| Contact Name | Michael Womack |
| Contact Email | michae.womack@lacity.org |
| Category | Construction |
| Bid Method | Whole Item |
| Type | TOS - Task Order Solicitation |
| Description | ■ Only the following five Contractors can bid on this project as a Prime Contractor:• Calex Engineering• Clarke Contracting• Jilk Heavy Construction, Inc.• Mike Prlich & Sons, Inc.• Mladen Buntich Construction Company▬ ♦ The 17537 Tramonto Drive Bulkhead project site is located in the Castellammare area of the Pacific Palisades in Los Angeles, approximately 0.75 miles northwest of the intersection of Sunset Boulevard and Pacific Coast Highway. At the project site, the existing timber bulkhead on the southwest (downslope) side of Tramonto Drive was damaged in the Palisades Fire. After additional tieback analysis, it was determined that a full bulkhead replace would be required. This project will mitigate the threat to public safety and restore lateral support the roadway by constructing a new bulkhead retaining structure downslope of the existing damaged timber bulkhead on Tramonto Drive. ♦ The new proposed bulkhead will be approximately 320 feet in length and will be constructed with cast-in-drilled-hole (CIDH) piles with steel wide flange beams and colored pre-cast concrete lagging. The project also includes installation of new asphalt concrete paving, 12-inch high concrete curb and gutter, pedestrian handrail and a metal beam guardrail, and regrading and one tree removal to widen the roadway. The existing wall will be substantially abandoned in place, and will require removal of all timber lagging, new drilled weepholes through existing shotcrete, and for the existing piles to be cut approximately 3’-6” below finish surface. Existing tiebacks are to be protected in place.▬▬▬▬▬ ♦ See bid package for full scope & details ♦ Bid package only on RAMP- if you're one of the prequalified contractors, download it to be a planholder ♦ For Bid Results visit http://engineering.lacity.gov/contractors/ |
| Prime NAICS | |
| Prime NAICS | Industry |
| 237310: Highway, Street, and Bridge Construction | Construction |
| 237990: Other Heavy and Civil Engineering Construction | Construction |
| 238110: Poured Concrete Foundation and Structure Contractors | Construction |
Get Government Bids Like This by Email
Receive daily bid alerts that match your keywords, business categories, and target regions.
See Also
Follow MUX/MALE Engineering Logistics Support (ELS) Follow-On Active Contract Opportunity Notice ID N00019-26-RFPREQ-WPM266-0012
DEPT OF DEFENSE
Due by 11/14/2026
Project ID: MS27-020 Title: OLD TOWN COMMERCIAL FACADE IMPROVEMENT PROGRAM PROJECT AT 16825
City of Victorville
Due by 12/09/2026
Follow NSN 1560-015165233, WINDSHIELD PANEL,AIRCRAFT, WSDC 42F Active Contract Opportunity Notice ID SPE4A727R0096
DEPT OF DEFENSE
Due by 11/15/2026
Number Title Type NAICS Code(s) Due Date Issue Date Status RQ147008 PAD KIT
LA Metro
Due by 11/12/2026
* Disclaimer: This website provides information about bids, requests for proposals (RFPs), or requests for qualifications (RFQs) for convenience only and does not serve as an official public notice. Individuals who wish to respond to or inquire about bids, RFPs, or RFQs should contact the relevant government department directly.