Traffic Signal Project at Collier Drive and Ridge Road

Agency: City of Sevierville
State: Tennessee
Type of Government: State & Local
NAICS Category:
  • 237310 - Highway, Street, and Bridge Construction
Posted Date: Mar 24, 2026
Due Date: Apr 21, 2026
Original Source: Please Login to View Page
Contact information: Please Login to View Page
Bid Documents: Please Login to View Page
Bid Title: Traffic Signal Project at Collier Drive and Ridge Road
Category: General Bids
Status: Open
Publication Date/Time:
3/24/2026 12:00 AM
Closing Date/Time:
4/21/2026 11:59 PM
Related Documents:

Attachment Preview

Bid Package
for
Collier Drive at Ridge Road
Traffic Signal Project
City of Sevierville
Public Works Department
P. O. Box 5500
Sevierville, TN 37864-5500
Phone: (865) 868-1793
Fax: (865) 453-5518
Contact: Joseph Dodgen
Email: jdodgen@seviervilletn.org
March 2026
INFORMATION FOR BIDDERS
RECEIPT AND OPENING OF BIDS
The City of Sevierville, Tennessee (herein called the “Owner”) invites bids on the form(s) attached
hereto for Collier Drive at Ridge Road Traffic Signal Project. The Owner will RECEIVE BIDS UNTIL
April 21, 2026 at 11:00 AM, at Sevierville City Hall, 120 Gary Wade Boulevard, Sevierville, Tennessee,
37862, (Mailing address: P.O. Box 5500, Sevierville, Tennessee, 37864-5500). Bids will then be publicly
opened and read aloud at Sevierville City Hall, 120 Gary Wade Boulevard, Sevierville, Tennessee. The
envelopes containing the bids must be sealed, addressed to Tracy Baker, Assistant City Administrator,
and must bear the following information:
Name of Bidder
Bidder’s Address
Date and Time of Bid Opening
Bid Enclosed: Collier Drive at Ridge Road Traffic Signal Project
Bidders must submit one (1) original and two (2) copies of the bid package.
The Owner may consider informal any bid not prepared and submitted in accordance with the
provisions hereof, and may waive any informality or reject any and all bids. Any bid received after the
time and date specified shall not be considered.
QUALIFICATIONS OF BIDDERS
The Owner may make such investigations as he/she deems necessary to determine the ability of the
Bidder to supply the necessary services and equipment, and the Bidder shall furnish to the Owner all
such information and data for the purpose as the Owner may request. The Owner reserves the right to
reject any bid if the evidence submitted by, or investigation of, such Bidder fails to satisfy the Owner
that such Bidder is properly qualified to carry out the obligation of the contract by supplying the services
and equipment contemplated therein. Conditional bids will not be accepted.
METHOD OF AWARD - LOWEST QUALIFIED BIDDER
If at the time this contract is to be awarded the lowest base bid submitted by a responsible Bidder does
not exceed the amount of funds then estimated by the Owner as available to finance the contract; the
contract will be awarded on the bid. If such bid exceeds such amount, the Owner may reject all bids or
may award the contract on the lowest bid with such deductible alternates to produce a net amount,
which is within the available funds. In case of error or discrepancy in the mathematics of the bid price,
the unit prices shall prevail. Totals read at the opening of the bids are not guaranteed to be correct and
no final award of the contract will be made until bids and extensions have been verified.
The Owner reserves the right to determine the lowest qualified Bidder by research of qualifications of
the Bidders. This may be done by means not limited to the following: past experience with the Bidder,
interviews, submitted certifications, or research of other customers. Submitted costs may not
determine the qualified bidder.
Only one (1) award will be made from this contract.
2
OBLIGATION OF BIDDERS
At the time of the opening of bids, each Bidder will be presumed to have read and to be thoroughly
familiar with the specifications. The failure or omission of any Bidder to examine all the forms,
instruments, and documents shall in no way relieve the Bidder from any obligation in respect to his/her
bid.
Addenda to the Bid Package must be acknowledged by all bidders. Failure to acknowledge receipt of
Addendum Letters may be grounds for rejection.
Each Bidder is requested to fill out and return the attached Bid forms, Title VI Information, Affidavit
Regarding Drug-Free Workplace Program form, vendor information sheet, and the W-9 as a part of the
bid package.
VENDOR INFORMATION
Adequate vendor information shall be included with the bid for determination of meeting the
specifications. Any exceptions shall be explained in writing and submitted as a part of the bid package.
SHIPPING/DELIVERY
Any and all shipping and/or handling charges to be included in the unit bid prices.
PAST EXPERIENCE
Unless a current contract holder with the City of Sevierville, bidders shall supply a list of all customers
for which they have done similar work within the past twelve (12) months. The list shall include the
name of a contact person and his/her telephone number.
STORAGE OF EQUIPMENT
The successful Bidder will be responsible for providing a storage area for materials and equipment. City
of Sevierville property or street rights-of-way shall not be used, unless approved in advance by written
request.
TRAFFIC CONTROL
The Traffic Control Plan provided as part of the plans and specifications on sheet 8 shall be followed for
applicable work. When making traffic signal improvements or working within the ROW, proper
temporary traffic control shall be required and shall be in compliance with Part VI of the Manual on
Uniform Traffic Control Devices (2009) or latest edition as directed by the Owner. Before installation of
any traffic control signing, device, or activity, the contractor must contact Frank Rogers, Sevierville
Public Works Department, at (865) 429-4567. Traffic control devices shall not be displayed or erected
unless related conditions are present necessitating warnings. The lump sum unit price for the Traffic
Control shall include all associated costs for traffic control during the project.
Lane Closure Requests must be submitted to Joseph Dodgen, Sevierville Public Works Department, one
week prior to the requested closure date. These requests are to be approved before Lane Closure is in
place. Special events and other major traffic generating time frames will need to be administered to
minimize vehicular delay in the project area. These dates and times will be discussed during the Lane
Closure Request submittal period.
LICENSING AND CERTIFICATIONS
3
The successful Bidder must be a licensed contractor as required by the "CONTRACTOR'S LICENSING ACT
OF 1976", and as passed by the 89th General Assembly of the State of Tennessee and as amended in
succeeding Assemblies. The Contractor shall have the proper classifications of license as listed in the
Rules of Tennessee Board for Licensing General Contractors-Chapter 0680-1.
Employees performing the work for the successful Bidder must be certified by the International
Municipal Signal Association (IMSA), or work under the supervision of personnel with at least Traffic
Signal Technician Level III certification by IMSA.
GENERAL TERMS AND CONDITIONS
All work performed during this contract shall be in accordance with Section 730 of the current edition of
TDOT Standard Specifications for Road and Bridge Construction, The City of Sevierville SP730SV, chapter
9 of the current edition of TDOT Traffic Design Manual, and TDOT Roadway Design Standard Drawings
TSG-1 through TSG-13.
Successful bidder will have two hundred forty (240) calendar days from notice to proceed to be
substantially complete. Substantially complete shall be defined as having all traffic signal equipment
and traffic control devices installed and operational. Landscaping or general clean-up may take place
after the deadline.
LIQUIDATED DAMAGES
The Contractor shall pay to the Owner as liquidated damages the sum of five hundred dollars ($500.00)
for each calendar day that the Contractor shall be in default of completing the work within the time limit
named herein. If deadline is not reached, damages will be assessed and deducted from the final
payment to the Contractor.
PLANS AND SPECIFICATIONS
See attached 2026 Collier Drive at Ridge Road Traffic Signal Project Plans Final, by Cannon and Cannon
INC stamped 12/04/25 for project detailed plans and specifications. All materials and installations shall
meet the above referenced project plans and conform to all applicable ITE, TDOT, ADA, and MUTCD
specifications. Successful Bidder must submit for approval to the Owner all shop drawings,
manufacturer cut sheets, and details for all components proposed for installation.
INSTALLATION
Successful bidder is responsible for all equipment installations. Any and all installation charges shall be
included in the unit prices submitted.
SUBCONTRACTS
Sections 105 and 108 of the Tennessee Department of Transportation Standard Specifications address
the duties of the contractor and subletting of contracts.
IRAN DIVESTMENT ACT
By submission of this bid, each bidder and each person signing on behalf of any bidder certifies, and in
the case of a joint bid each party thereto certifies as to its own organization, under penalty of perjury,
that to the best of its knowledge and belief that each bidder is not on the list created pursuant to § 12-
15-106.
4
INSURANCE COVERAGE REQUIREMENTS
These coverage requirements apply to the Contractor and any Sub-Contractors who may perform
services on this project.
Commercial General Liability Insurance - $1,000,000 limit per occurrence for property damage and
bodily injury.
Business Automobile Liability Insurance - $1,000,000 limit per accident for property damage and
personal injury.
Workers' Compensation and Employers' Liability Insurance - Workers' Compensation statutory limits as
required by Tennessee law. This policy should include Employers' Liability coverage for $1,000,000 per
accident.
CONDITIONS FOR ALL COVERAGES
Additional Insured: The City of Sevierville, its Board of Mayor and Aldermen, officers,
employees, agents, representatives, boards, commissions, committees, and volunteers
(hereinafter referred to as Owner) are to be covered as additional insured respecting: liability
arising out of activities performed by or on behalf of the Contractor; products and completed
operations of the Contractor; premises owned, leased or used by the Contractor or premises on
which Contractor is performing services on behalf of the Owner. The coverage shall contain no
special limitations on the scope of protection afforded to the Owner.
Notice of Cancellation or Non-renewal: Each insurance policy required by this clause shall be
endorsed to state that coverage shall not be suspended, voided, cancelled, reduced in coverage
or in limits except after thirty (30) days prior written notice has been given to the Department
Head granting this bid and/or to the Risk Manager for the Owner.
Acceptability of Insurers: Insurance is to be placed with financially sound Tennessee admitted
insurers (Best's rating of A or better) or approved by Owner's Risk Manager, Rebecca Nowak,
phone, 865-453-5504.
Certificates of Insurance: Contractor shall furnish the Owner with certificates of insurance with
original endorsements affecting coverage required by this clause. The certificates and
endorsements for each policy are to be signed by a person authorized by that insurer to bind
coverage on its behalf. The certificates and endorsements are to be received and approved by
the Owner before work commences.
Defense, Indemnification and Hold Harmless Agreement: Contractor hereby agrees to
indemnify, defend and hold harmless the Owner from any and all loss, damage, cost, expense,
liability, claims, demands, suits, attorney's fees and judgments arising directly or indirectly from
or in any manner related to the work, project, event or other purposes in connection with the
Contractor's performance or failure to perform under the terms of this contract, regardless of
the active or passive nature of any negligence by the Owner, except as otherwise expressly
stated herein. Contractor shall not be responsible when such liability arises from the sole
negligence of the Owner. Contractor shall pay Owner for any costs incurred in enforcing this
provision.
5
This page summarizes the opportunity, including an overview and a preview of the attached documents.
* Disclaimer: This website provides information about bids, requests for proposals (RFPs), or requests for qualifications (RFQs) for convenience only and does not serve as an official public notice. Individuals who wish to respond to or inquire about bids, RFPs, or RFQs should contact the relevant government department directly.

Sign-up for a Free Trial, Government Bid Alerts

With Free Trial, you can:

You will have a full access to bids, website, and receive daily bid report via email and web.

Try One Week FREE Now

See Also

Project: Nashville JFHQ Building 100 Second Floor HVAC and Facility Update Nashville Joint

State Government of Tennessee

Bid Due: 6/11/2026

Form Details (Abstract): RFQ 361781 Status Active Document PDF File Abstract Negotiation Number

City of Memphis

Bid Due: 7/22/2026

Bid Number: 26-017 Bid Title: Sidewalk Replacement Category: Bid Postings Status: Open Description:

City of Bristol

Bid Due: 6/15/2026

Bid Title: FY2027-011 Sanitary Sewer Hard Connection Project Category: Bids & RFPs Status:

City of Oak Ridge

Bid Due: 6/30/2026