26-1648 Track Package

Agency: Government of Alberta
State: Alberta
Type of Government: State & Local
NAICS Category:
  • 336413 - Other Aircraft Parts and Auxiliary Equipment Manufacturing
Posted Date: Jul 27, 2026
Due Date: Oct 29, 2026
Solicitation No: AB-2026-05321
Original Source: Please Login to View Page
Contact information: Please Login to View Page
Bid Documents: Please Login to View Page

Description

Basic Information
APC Reference # AB-2026-05321
Internal Reference # 26-1648
Title 26-1648 Track Package
Status OPEN
Posting Type OPEN-COMPETITIVE
Solicitation Type RFP
Category Construction
Contracting Organization City of Calgary
Posting Date & Time (MT) 07/27/2026 10:01 AM
Closing Date & Time (MT) 10/29/2026 02:00 PM
Region(s) of Delivery Alberta,Calgary
Estimated Contract Start Date 12/17/2026
Estimated Contract End Date 10/01/2029
Information Session 08/04/2026 10:00 AM
Information Session Mandatory No
Contact Person Ujjain Repaka
Contact Title Buyer
Contact Email ujjain.repaka@calgary.ca
Contact Phone (403) 268-3209
Organization Address 677 25 Ave SE, Calgary, Alberta, T2G 4K8, Canada
External Posting https://portal.us.bn.cloud.ariba.com/dashboard/public/appext/comsapsbncdiscoveryui#/RfxEvent/preview/1110019833?anId=ANONYMOUS

Overview of the Project
The Track Package includes Scope A which is the Main Line Track from Ramsay Inglewood Station in the north to the end of the project limits, as well as Scope B the Maintenance Storage Facility (MSF) track. Scope C includes both scopes.
For scope delineation, this RFP is divided as follows:
• Scope A: Main Line Track
• Scope B: Maintenance & Storage Facility (“MSF”) Track
• Scope C: Combined Track Package (Scopes A and B) in its entirety.
Scope A Main Line Track
Ballasted Track: from the Top of Rail (TOR) to the top of the sub-ballast.
• Test track works
• Special trackwork (e.g., turnouts, crossovers)
• Track-related ROW equipment, crossings, and appurtenances
• Ducting, cable containment, and associated infrastructure
• Boundary limit south of the MSF turnaround (see Scope B figure below)
• Design and implementation of all Temporary Works.
• Field review, monitoring, and reporting for Temporary Works.
• Support of excavation.
• Laydown areas and traffic management.
• Construction noise and vibration mitigation.
• Environmental mitigation protection measures.
• Provide all:
o Labour, supervision, and management
o Materials, plant and equipment
o Survey, quality control, and environmental control
o Documentation and testing support
o Interface coordination
Scope B MSF Track
MSF trackwork supply and installation including:
o Direct Fixation (DF) Track: from the Top of Rail (TOR) to the bottom of the plinths (second-pour concrete).
o Ballasted Track: from the Top of Rail (TOR) to the top of the sub-ballast.
• MSF trackwork (yard and shop) supply and installation
• Test track works
• Special trackwork (e.g., turnouts, crossovers)
• Track-related ROW equipment, crossings, and appurtenances
• Ducting, cable containment, and associated infrastructure
• Boundary limit north of the MSF turnaround (see Scope B figure above)
• Design and implementation of all Temporary Works.
• Field review, monitoring, and reporting for Temporary Works.
• Support of excavation.
• Laydown areas and traffic management.
• Construction noise and vibration mitigation.
• Environmental mitigation protection measures.
• Provide all:
o Labour, supervision, and management
Materials, plant and equipment
o Survey, quality control, and environmental control
o Documentation and testing support
o Interface coordination
Scope C Combined Track Package (Scopes A and B)
• Main Line trackwork supply and installation including:
o Direct Fixation (DF) Track: from the Top of Rail (TOR) to the bottom of the plinths (second-pour concrete).
o Ballasted Track: from the Top of Rail (TOR) to the top of the sub-ballast.
• MSF trackwork supply and installation including:
o Direct Fixation (DF) Track: from the Top of Rail (TOR) to the bottom of the plinths (second-pour concrete).
o Ballasted Track: from the Top of Rail (TOR) to the top of the sub-ballast.
• MSF trackwork (yard and shop) supply and installation
• Test track works
• Special trackwork (e.g., turnouts, crossovers)
• Track-related ROW equipment, crossings, and appurtenances
• Ducting, cable containment, and associated infrastructure
• Design and implementation of all Temporary Works.
• Field review, monitoring, and reporting for Temporary Works.
• Support of excavation.
• Laydown areas and traffic management.
• Construction noise and vibration mitigation.
• Environmental mitigation protection measures.
• Provide all:
o Labour, supervision, and management
o Materials, plant and equipment
o Survey, quality control, and environmental control
o Documentation and testing support
o Interface coordination
The following provisions and items are applicable to all respective trackwork scopes, comprising but not limited to the following:
General Provisions
• Deliver a complete, coordinated, safe, maintainable, and commissionable LRT track system for the respective trackwork scope.
• The scope split matrix provided in Schedule 9 Construction Contract Form, with the Proponent taking primary responsibility for trackwork.
• Applies across design, procurement, construction, testing, commissioning, handover, and warranty.
Track equipment, including the supply, fabrication, delivery, installation, adjustment, inspection, and acceptance of:
• Running rail
• Jordan rail
• Ties
• Ballast
• Direct fixation assemblies
• Embedded track components
• All required fittings and fixations
• Guard rails
• Restraining rails
• Insulated joints
• Expansion joints
• Rail anchors
• Rail lubricators
• End-of-track protection devices
• Special trackwork
• Switch clearance devices
• Switch heater equipment
• Level crossings
• Track drainage interfaces
• Cable containment
• Track troughs
• Concrete plinths (second pour)
System assurance for the scope of trackwork, including all applicable inspection, testing, and commissioning activities required for the respective trackwork scopes, including:
• Factory Acceptance Testing (FAT)
• Factory Integration Testing (FIT)
• Pre-Installation Check-Out (PICO)
• Site Acceptance Testing (SAT)
Integrated interface testing
• Trial running support
• Closeout evidence
• Acceptance testing
• Any other activities applicable to the specific scope of work.
Interfaces with other Construction packages
• Stations, bridges, MSF building
• Public roads and pedestrian crossings
• Utility zones and embedded track areas
• Transition slabs and systems equipment locations
• Temporary tie-ins for staged construction
• Communications & Traction Power Systems (wayside)
• Signaling & Train Control Systems

Bid Security

Required for construction as indicated in the RFP document

Information Session Details

Teams Meeting

UNSPSC Commodity Codes
Code Description Code Level
72141605 Railway track laying service Commodity
Get Government Bids Like This by Email Receive daily bid alerts that match your keywords, business categories, and target regions.

See Also

Basic Information APC Reference # AB-2026-07335 Internal Reference # SR5804329871 Title 8.5 x

Government of Alberta

Due by 11/18/2026

Basic Information APC Reference # AB-2026-07337 Internal Reference # Doc5881483679 Title 939583 Supply

Government of Alberta

Due by 11/30/2026

* Disclaimer: This website provides information about bids, requests for proposals (RFPs), or requests for qualifications (RFQs) for convenience only and does not serve as an official public notice. Individuals who wish to respond to or inquire about bids, RFPs, or RFQs should contact the relevant government department directly.