Title: HVAC Repairs - Misc. Schools / WPS

Agency: City of Worcester
State: Massachusetts
Type of Government: State & Local
NAICS Category:
  • 238220 - Plumbing, Heating, and Air-Conditioning Contractors
Posted Date: Oct 20, 2022
Due Date: Nov 9, 2022
Solicitation No: 7918-W3
Bid Source: Please Login to View Page
Contact information: Please Login to View Page
Bid Documents: Please Login to View Page

Bid Number

7918-W3
Title
HVAC Repairs - Misc. Schools / WPS
Industry
Construction Services - Vertical
Open Date
10/20/2022
Close Date
11/09/2022 10:00 AM
Contact
Christopher Gagliastro, Purchasing Director
Comments

Scope: provide various repair / service work on HVAC systems at miscellaneous school faciltieis per plans and specifications.

Estimated Cost: $ 750,000.00

DCAMM Certification required: HVAC

Standard Form(s)
CORI Compliance.pdf
EPP Policy.pdf
MWBE Program.pdf
REAP Program.pdf
Wage Theft Prevention Certification.pdf
Bid Form(s)

7918-W3-FORM-149-HVAC-Repairs-Misc.-Schools-WPS-12-12.pdf
7918-W3-HVAC-Repairs-Misc.-Schools-WPS-BID-SET-2022.pdf
Plan Holder(s)*
Bid Results
Awardee(s)
× Christopher Gagliastro, Purchasing Director
Email: gagliastroc@worcesterma.gov
Phone: 508-799-1224
Fax: 508-799-1203

View Buyer's Commodities List

*APPLIES TO CONSTRUCTION BIDS ONLY - All City of Worcester bids are available for downloading from the City of Worcester website with no required registration process. As a result, the City accepts no responsibility for the accuracy of plan holder lists issued.

Attachment Preview

TAB & Miscellaneous HVAC Repairs
Various Buildings
for
Worcester Public Schools
September 9, 2022
DOCUMENTS PREPARED BY
SECTION 00.11.10
TABLE OF CONTENTS
DIVISION 0 - PROCUREMENT AND CONTRACTING REQUIREMENTS
DIVISION 1 - GENERAL REQUIREMENTS
Section 01.11.00 - Summary of the Work. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8
Section 01.31.00 - Project Management . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2
Section 01.32.00 - Construction Progress Documentation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2
Section 01.33.00 - Submittals . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3
Section 01.50.00 - Temporary Facilities and Controls . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6
Section 01.73.29 - Cutting and Patching. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4
Section 01.77.00 - Closeout Procedures . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4
DIVISION 2 - SITE WORK
Section 02.41.00 - Selective Demolition . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4
DIVISION 8 - DOORS AND WINDOWS
Section 08.11.13 - Hollow Metal Doors, Frames and Hardware . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7
DIVISION 23 - HVAC
Section 23.00.00 - HVAC . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 35
Appendix A - DRAWING SHEETS
1 - SKA-1: Elm Park Community School - Ceiling Access Panels
2 - SKH-1: Heard St School - Partial Basement Level HVAC Plan
3 - SKH-2: Rice Square School - Partial Ground Floor HVAC Plan
4 - SKH-3: Sullivan Middle School - Partial Roof HVAC Plan
5 - SKH-4: Thorndyke School - Partial Ground Floor HVAC Plan
Appendix B - SUMMARY OF WORK SCHEDULE
School Scope Summary . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 28
END OF SECTION
00.01.10
TAB and Misc HVAC Repairs
Worcester Public Schools
00.01.10 - 1
Table of Contents
SECTION 01.11.00
SUMMARY OF WORK
I PART 1 - GENERAL
1.01 GENERAL PROVISIONS
A. This section supplements the Conditions of the Contract, Prime Requirements, Drawings, and all other parts
of the Contract Documents.
B. This Contractor must be familiar with all other Divisions and Sections of the Specifications which affect the
work of this Section.
1.02 REQUIREMENTS INCLUDED
A. Work under this Contract.
B. Examination of Site and Documents.
C. Contract Method.
D. Work Sequence.
E. Supervision of Work.
F. Prime Contractor’s Use of Premises.
G. Coordination.
H. Project Meetings.
I. Permits, Inspection, and Testing Required by Governing Authorities.
J. Cutting, Coring, Patching, Unless Otherwise Indicated.
K. Debris Removal.
L. Field Measurements.
M. Safety Regulations.
N. OSHA Safety and Health Course Documentation.
O. Damage Responsibility.
P. Owner Furnished Products.
Q. Asbestos and Hazardous Materials Discovery.
R. Special Requirements.
S. List of Drawings.
1.03 WORK UNDER THIS CONTRACT
A. The work to be done under this contract consists of HVAC upgrades and related items at various WPD
buildings.
B. The scope of work, without limiting the generality thereof, includes all labor, materials, equipment and
services required to perform the work described fully in the Drawings and Specifications and includes, but is
not limited to the following major work:
1. Replacement of select existing filters with MERV 13 Filters and ERV-P with MERV 8 filters.
2. Provide and install MERV 13 filter racks at select locations.
3. Replacement and adjustment of select drive belts and re-balancing.
4. Balancing of select supply fans to the listed CFM.
5. Balancing of OA to listed CFM
6. Provide return air dampers in select return dusts.
7. Provide adjustable motor sheaves at select locations.
8. Replacement of drive motors at select locations.
9. Provide new return air flexible connections at select locations
10. Wash and Clean select coils.
11. Replacement of select missing air damper blades.
12. Diagnose operational issues select no-functioning units and report findings.
13. Furnish and install new man door into mixing chamber.
TAB & Misc. HVAC Repairs
Worcester Public Schools
01.11.00 - 1
Summary of Work
14. Vacuum / clean select supply air fan wheels and fan rooms.
15. Repair select operational controls to allow units to run in auto-mode.
16. Provide new EMS controls for select fans, coils and damper controls.
17. Provide new OA hoods and dampers to select wired controls.
18. Replacement of select roof-top ductwork and insulation of new ductwork.
19. Provide new EMS controls for select supply and exhaust fans, coils and damper controls.
20. New rated door and frame at a select location
21. New ceiling access panels at select locations.
C. The following major elements will be performed by the Owner, under separate contracts, for which the
Prime Contractor has a coordinating responsibility:
1. The Owner will not be performing any work on the project.
D. The following major elements will be furnished by the Owner, for installation by the Contractor or sub-
contractors:
1. None. The Contractor shall furnish all materials and labor required for the execution of this project.
E. Reference to Drawings: The work to be done under this Contract is shown on the Drawings listed at the end
of this Project Manual.
F. Prevailing Wage: The Massachusetts Standard Labor Wage rates, as outlined in the exhibits, will be used in
the construction of this project
G. Start of Work: Work can began as soon as contracts are complete and shall be complete (90) calendar
days from the Notice to Proceed.
1.04 EXAMINATION OF SITE AND DOCUMENTS
A. A pre-bid meeting will be held at (3) of the project building, the date, the time, the locations / order
will be included in the Invitation to Bid.
B. Bidders may also visit the sites on a non-holiday weekday acceptable to the Owner, between the hours of
9:00 AM and 3:00 PM to visually inspect the location of the work and existing conditions that may affect
new work provided that coordinate the visit with WPS and the main office.
C. The bidders are expected to examine and to be thoroughly familiar with all contract documents and with the
conditions under which the work is to be carried out. The Owner and Designers will not be responsible for
errors, omissions, and/or charges for extra work arising from the Contractor’s or Subcontractor’s failure to
familiarize themselves with the contract documents. The Contractor and Subcontractors acknowledge that
they are familiar with the conditions and requirements of the contract documents where they require, in any
part of the work a given result to be produced, and that the contract documents are adequate and will
produce the required results.
1.05 CONTRACT METHOD
A. Work under this contract shall be lump sum price, for the scopes of work as described in these specifications
and shown on the Drawings.
1.06 WORK SEQUENCE
A. The Work will be conducted in the following sequence of demolition/construction:
1. Actual sequence of the work will be left to the discretion of the Contractor, who will prepare a
construction schedule showing the sequence and duration of work, for review and approval by the
Owner. Work at more that one school at a time is permitted, provided that proper staffing is on site at
each location to complete the work in a timely fashion
TAB & Misc. HVAC Repairs
Worcester Public Schools
01.11.00 - 2
Summary of Work
B. Once the contract has been awarded, the Prime Contractor will be sent floor plans for each building
for coordination / sequencing of the work.
1.07 SUPERVISION OF WORK
A. The Contractor shall be held directly responsible for the correct installation of all work performed under this
Contract. The Contractor must make good repair, without expense to the Owner, of any part of the new
work, or existing work to remain, which may become inoperative on account of leaving the work
unprotected or unsupervised during construction of the system or which may break or give out in any
manner by reason of poor workmanship, defective materials or any lack of space to allow for expansion and
contraction of the work during the Contractor's warranty period, from the date of final acceptance of the
work by the Owner.
B. The Contractor shall furnish a competent Massachusetts Licensed Supervisor satisfactory to the Owner and
to the Designer. The licensed superintendent shall supervise all work under this contract and who shall
remain on duty at the site throughout the Contract period while work is in progress.
1. Submit the name and resume of the superintendent for approval to the Architect. Include experience
with projects of equal size and complexity.
2. If more than one building is receiving work on the same day, a licenced supervisor is required at each
location.
1.08 CONTRACTOR’S USE OF PREMISES
A. Use of the Site: Confine operations to areas within the project scope. Do not disturb portions of the site
beyond the areas in which the Work is indicated.
1. Owner Occupancy: Allow for Owner occupancy and use by the public (if applicable).
2. Driveways and Entrances: Keep driveways and entrances serving the premises clear and available to
the Owner, the Owner’s employees, and emergency vehicles at all times. Do not use these areas for
parking or storage of materials. Schedule deliveries to minimize space and time requirements for
storage of materials and equipment on-site.
B. Schedule and perform work to afford minimum of interruption to normal and continuous operation of utility
systems. Submit for approval, a proposed schedule for performing work; including construction of new
utilities, re-routing of existing utilities and final connection of new work to existing work. Schedule shall
indicate shutdown time required for each operation.
C. The Contractor shall schedule as per Section 01.50.00 - Temporary Facilities and Controls, the shutting
down or interrupting any utilities, services or facilities which may affect the operation of the building
outside the area of work or other buildings, services or facilities.
D. The Contractor can gain access to the premises during the hours specified below. In addition the Contractor
and his personnel will limit themselves only within the working premises during working hours. If work
needs to be scheduled during times other than those listed below, Contractor shall inform the Owner one
week prior to work.
1. The acceptable work / access hours for all of the building are 3PM - 11M and all deliveries must
be made with the contractor on site.
2. As stated above, if the contractor would like to perform work outside of the 3PM-11PM window
of time, it must be approved by the owner and ALL costs resulting for this request will be the
responsibility of the contractor.
3. If the project extends past the specified completions date, due to unforseen conditions or supply chain
TAB & Misc. HVAC Repairs
Worcester Public Schools
01.11.00 - 3
Summary of Work

Sign-up for a Free Trial, Government Bid Alerts

With Free Trial, you can:

You will have a full access to bids, website, and receive daily bid report via email and web.

Try One Week FREE Now

See Also

Bid Number: WFMD-FY23-017 Bid Title: Central Fire Station Envelope Repair Project Category: Building

Town of Wellesley

Bid Due: 3/30/2023

Bid Solicitation: BD-23-1293-MARB2-PROC2-85467 Header Information Bid Number: BD-23-1293-MARB2-PROC2-85467 Description: village st bridge repair

Commonwealth of Massachusetts

Bid Due: 3/23/2023

Bid Solicitation: BD-23-1245-FACMA-FACMN-85152 Header Information Bid Number: BD-23-1245-FACMA-FACMN-85152 Description: Benton Library Chimney Rebuild

Commonwealth of Massachusetts

Bid Due: 3/29/2023

Bid Solicitation: BD-23-1715-DPW18-DPW18-85042 Header Information Bid Number: BD-23-1715-DPW18-DPW18-85042 Description: REPLACE GENERATOR-TOGB PD Bid

Commonwealth of Massachusetts

Bid Due: 3/22/2023