| Agency: | West Basin Municipal Water District |
|---|---|
| State: | California |
| Type of Government: | State & Local |
| NAICS Category: |
|
| Posted Date: | May 6, 2026 |
| Due Date: | May 12, 2026 |
| Solicitation No: | RFB-TH-0129 |
| Original Source: | Please Login to View Page |
| Contact information: | Please Login to View Page |
| Bid Documents: | Please Login to View Page |
Project ID: RFB-TH-0129
Title: Title 22 Filters 1, 5, and 10 Rehabilitation and Replacement Project
Addenda: 2
Release Date: 4/13/2026
Due Date: 5/12/2026
Request for Bids
West Basin Municipal Water District (West Basin) is accepting bids for the Title 22 Filters 1, 5, and 10 Rehabilitation and Replacement Project (CIP-10073). The solicitation phase will begin on April 13, 2026, and the bid opening is scheduled for May 7, 2026, pending any unforeseen delays. The Project is part of West Basin's current CIP program and has been approved by the Board of Directors to proceed with solicitation for bids.
West Basin Municipal Water District’s (West Basin) Edward C. Little Water Recycling Facility (ECLWRF) processes secondary effluent into four types of recycled water, including Title 22 recycled water. Title 22 water is disinfected tertiary recycled water used for irrigation and as source water for three (3) satellite treatment plants that serve refinery customers. At ECLWRF, Title 22 water is produced through clarification, filtration, and disinfection, then pumped from on‑site product water storage tanks into the recycled water distribution system through 48‑inch and 42‑inch pipelines. The distribution system is designed as a closed system with no intermediate storage outside of the treatment plants.
Currently, there are fourteen (14) monomedia gravity filters using anthracite coal, referred to as Title 22 Filters. The Title 22 Filters operate 24 hours per day, 7 days per week, providing tertiary-treated recycled water critical to West Basin's commercial and irrigation applications, satellite treatment plants, and refinery customers. The ECLWRF was originally placed into operation in the mid-1990s and has undergone significant additions and modifications since its inception, and these changes will likely continue. Filters 1 through 10, referred to as Train 1, were built during ECLWRF's initial construction phases, while Filters 11 through 14, referred to as Train 2, were added (converted) to Title 22 production after initially serving as a pretreatment process for other recycled water products (Barrier water/ Boiler Feed).
Several filters have required repairs over the years due to media loss into the underdrain, filtrate collection gullet, and backwash supply piping. Filters 8 and 9 were repaired in 2019, followed by Filter 2 in 2020 due to similar failures. Media loss affects water quality, facility operations, and production capacity. In 2025, Filters 3, 4, and 6 were repaired, along with structural repairs to the north wall of Filters 7 and 8. The scope of work for Filters 1, 5, and 10 includes, but is not limited to, the following:
With Free Trial, you can:
You will have a full access to bids, website, and receive daily bid report via email and web.
Opportunity ID 231492 Organization City of Los Angeles Department Water & Power Stage
City of Los Angeles
Bid Due: 8/28/2026
Davidson City Trunk Sewer Rehabilitation Phase II Category: Construction Bids Project Number: 08-P-0089
Los Angeles County Sanitation Districts
Bid Due: 9/08/2026
Follow CA - FWS MODOC NWR- MESURING WEIR REPLCMT Active Contract Opportunity Notice
INTERIOR, DEPARTMENT OF THE
Bid Due: 8/28/2026
Follow 127EAW26Q0053 - Kern River Ranger District HVAC Active Contract Opportunity Notice ID
AGRICULTURE, DEPARTMENT OF
Bid Due: 8/27/2026