Title: Demolition & Abatement-Elm Park School/DSR-BID CANCELED

Agency: City of Worcester
State: Massachusetts
Type of Government: State & Local
NAICS Category:
  • 236220 - Commercial and Institutional Building Construction
  • 238910 - Site Preparation Contractors
  • 562910 - Remediation Services
Posted Date: Aug 2, 2023
Due Date: Dec 27, 2023
Solicitation No: 8058-M4
Bid Source: Please Login to View Page
Contact information: Please Login to View Page
Bid Documents: Please Login to View Page

Bid Number

8058-M4
Title
Demolition & Abatement-Elm Park School/DSR-BID CANCELED
Industry
Construction Services - Horizontal
Open Date
08/02/2023
Close Date
12/27/2023 10:00 AM
Contact
Maureen McKeon, Assistant Purchasing Agent
Comments

Scope: Hazardous materials removal (asbestos) at the Em Park School per attached drawings and specifications.

Standard Form(s)
CORI Compliance.pdf
EPP Policy.pdf
MWBE Program.pdf
REAP Program.pdf
Wage Theft Prevention Certification.pdf
Bid Form(s)

8048-M4-Demo-Abatement-Elm-Park-School.pdf
8058-M4-Spec-Drawing-ElmPark-School.pdf
Plan Holder(s)*
Bid Results
Awardee(s)
× Maureen McKeon, Assistant Purchasing Agent
Email: mckeonmp@worcesterma.gov
Phone: 508-799-1220
Fax: 508-799-1203

View Buyer's Commodities List

*APPLIES TO CONSTRUCTION BIDS ONLY - All City of Worcester bids are available for downloading from the City of Worcester website with no required registration process. As a result, the City accepts no responsibility for the accuracy of plan holder lists issued.

Attachment Preview

SECTION 020800 - ASBESTOS ABATEMENT
PART I - GENERAL
1.01 GENERAL PROVISIONS
A.
Drawings and general provisions of the Contract, including General and Supplementary
Conditions and Division 01 Specification Sections, apply to this Section.
1.02 DEFINITIONS
A.
The following definitions shall be applicable to this Section:
“Site”: Refers to Elm Park Elementary School located in Worcester, Massachusetts as
described by the Contract Documents and Drawings.
“Owner”: Refers to the City of Worcester and their designated, authorized personnel.
“Owner’s Project Manager”: Refers to Honeywell, 63 Milton Street, Worcester,
Massachusetts and their designated, authorized personnel.
“Consultant”: Refers to Atlas Technical Consultants, LLC (ATLAS) 73 William Franks
Drive, West Springfield, Massachusetts and their designated, authorized personnel.
"Asbestos Abatement Contractor": Refers to the Contractor who is performing asbestos
abatement work as outlined by this Section.
1.03 GENERAL REQUIREMENTS/QUALIFICATIONS
A.
All Asbestos Abatement work referenced herein shall be performed by a Massachusetts
licensed Asbestos Abatement Contractor in accordance with Massachusetts Department
of Labor Standards (MADLS) 454 CMR 28.00 Regulations.
B.
Qualifications of Asbestos Abatement Contractor
1. Asbestos Abatement Contractor performing the abatement work of this section
("Asbestos Abatement Contractor") shall be an Asbestos Abatement Contractor
licensed to perform asbestos operations in the State of Massachusetts. Asbestos
Abatement Contractor shall submit license number and proof of licensure.
2. The Asbestos Abatement Contractor shall also provide the project name, contact
person and phone number of three (3) projects which were successfully completed of
similar size and scope within the last two (2) years. Each project shall have been
completed in good standing and the work performed by the Asbestos Abatement
Contractor for each project resulted in no work violations/citations, contract delays,
contract extensions/disputes or litigation. Failure to provide this information and/or
meet the approval of these qualifications by the Owner may result in rejection of the
Asbestos Abatement Contractor.
3. The Owner shall also reserve the right to research and utilized other information
received from any other projects completed by the Asbestos Abatement project not
provided under 1.03 B (2) above, regardless of the date completed, location or
circumstances resulting from the outcome of their work. The Owner shall reserve
their right to reject the Asbestos Abatement Contractor based upon this review, for
any reason, if found to be in the best interest of the Owner.
Boiler Replacement
Elm Street Elementary School
ASBESTOS ABATEMENT
020800 - 1
NOTE:
The Asbestos Abatement Contractor shall not be authorized to
begin work until all credentials outlined above are reviewed and
approved by the Consultant.
1.04 DESCRIPTION OF WORK
A. Work: This section details all areas where asbestos abatement work is to be performed
and lists areas requiring special protection during the abatement work. The Asbestos
Abatement Contractor shall furnish all labor, materials, services, training, insurance, and
equipment as needed to complete removal of asbestos-containing and asbestos-
contaminated materials located as indicated below. The Asbestos Abatement Contractor
shall follow all Federal, State and local ordinances, regulations and rules pertaining to
asbestos, including its abatement, storage, transportation and disposal.
B. Quantity estimates have been provided for bidding purposes. However, it shall be the
Asbestos Abatement Contractor's responsibility to verify to the best of their ability, based
upon the documentation and the pre-bid conference, that the quantity estimate is accurate
for the preparation of their bids. For scope clearly identified by the Contract Documents, no
additional compensation and/or contract time shall be granted to the Asbestos Abatement
Contractor for failure to perform this requirement.
C. The following Scope of Work and Requirements shall be applicable for asbestos abatement
work at the Site. If a specific note for an abatement procedure or requirement is not
mentioned herein, the Asbestos Abatement Contractor shall perform the removal of such
material in accordance with local, state and federal regulations.
1. All Asbestos Abatement work shall take place in accordance with the provisions
outlined herein as well as current local, state and federal regulations. Specifically, all
abatement work shall comply with both MADEP 310 CMR 7.15 and MADLS 454
CMR 28.00 Regulations. No additional compensation shall be granted to the
Asbestos Abatement Contractor for compliance with applicable laws when performing
the abatement work at the site. This shall include any regulatory requirements that
mandate additional or more restrictive containment and abatement procedures than
what has been presented herein. It shall be the Asbestos Abatement Contractor's
responsibility to comply with such regulations as well as any other additional
requirements outlined by this Section.
2. The Asbestos Abatement Contractor shall coordinate with the Owner, Owner’s
Project Manager and Consultant as to the locations of areas to be abated in
accordance with the Scope of Work outlined herein and the Drawings. A pre-
construction meeting shall be held at the site to review the areas to be abated prior to
the start of the work.
3. The Asbestos Abatement Contractor shall be responsible for all demolition work
required in order to access all asbestos materials for abatement. All demolition
debris shall be disposed of as asbestos (unless otherwise directed by the
Consultant).
4. Coordination shall exist between the abatement under this Section and the
disconnection of existing electrical, plumbing or fire suppression equipment within the
Boiler Room by the Owner’s Project Manager and the Owner.
5. All removal procedures shall take place under full containment and a three-stage
decontamination unit under negative pressure.
6. With regards to the variance from requirements on polyethylene sheeting on
“impervious wall” surfaces, the Asbestos Abatement Contractor shall be required to
adhere to all requirements outlined by MADLS regulations governing work area set-
up for asbestos abatement. The Asbestos Abatement Contractor shall take full
responsibility including all costs associated with approval and/or denial of such
Boiler Replacement
Elm Street Elementary School
ASBESTOS ABATEMENT
020800 - 2
actions (i.e. non use of polyethylene) if determined to be non-compliant by the
Consultant and/or a state or federal agency. If the variance is denied or discontinued
by said parties; the Asbestos Abatement Contractor shall proceed with installation of
polyethylene sheeting on such surfaces at no additional cost to the Owner.
7. The following requirements shall be applicable for abatement of all piping at the site:
Removal shall include the asbestos-containing fitting insulation and at least 6
inches of fiberglass insulation to each side of the fitting being abated throughout
the Boiler Room.
All removed material to be disposed of as asbestos-containing waste material
(ACWM).
All fiberglass insulation located on the ductwork, boilers or other equipment to
remain which is located within the containment area shall be protected by 2
layers of 6 mil polyethylene sheeting and properly sealed with duct tape. Any
fiberglass insulation to remain that is not protected prior to abatement, becomes
exposed during abated or becomes damaged as a result of the abatement shall
be replaced by the Asbestos Abatement Contractor at no additional expense to
the Owner.
Upon completion of the removal, all piping shall be demolished and disposed of
as part of the work. Note that the Owner’s Project Manager will cut and cap all
piping to be demolished prior to the start of the abatement.
8. The following requirements shall be applicable for abatement of the boiler unit,
breechings, and incinerator exhaust piping at the site:
The Scope of Work includes the removal and disposal of all asbestos-containing
materials located on the interior and exterior portions of boiler unit to be
demolished, including, but is not limited to jacketing, rope, packing insulation,
mesh, gaskets, firebrick, soot/debris, piping, header, wall parging, etc.
The work shall also include demolition and disposal of the boiler unit and
associated components in their entirety. All demolition work shall be done under
containment in order to access all ACM. Note that the concrete pediment/base
structure shall remain.
The burner unit and all oil feed lines and associated components shall be
drained, capped off, disconnected, removed and disposed of as part of the work.
All fiberglass and porous items on boiler unit shall be removed and disposed as
ACWM. All non-porous items (i.e. metal, ribs, etc.) may be properly
decontaminated and passed out of the area and disposed of as non-asbestos
waste after passing a visual inspection by the Consultant.
Removal shall also include all insulation and associated materials located on the
breechings for the boiler unit, hot water tank and emergency generator. Upon
completion of removal, the entire breechings and associated brackets, hangers,
etc. shall be demolished and disposed as part of the work.
Work shall also include removal of all gaskets in the piping and flex connectors to
in the ductwork to be demolished.
The Asbestos Abatement Contractor shall also be made aware that heavy metals
are present within the soot/debris located inside the boiler unit and breaching’s
that will be abated and demolished as part of the work. The Asbestos Abatement
Contractor shall be responsible for proper testing of such material to determine:
(1) appropriate waste disposal requirements; and (2) appropriate worker
protection to be employed during the work. All costs associated with the testing
and required PPE for handling this material shall be borne by the Asbestos
Abatement Contractor. All analytical results shall be reviewed and approved by
the Consultant. All costs associated with proper collection and disposal of all
material shall be borne by the Asbestos Abatement Contractor.
Boiler Replacement
Elm Street Elementary School
ASBESTOS ABATEMENT
020800 - 3
9. Refer to Attachment A (Table 1.0) for a summary of materials that require abatement
at the site. Refer to Attachment B for the Drawing that shows location of the boiler
unit, breechings and piping to be abated and demolished.
1.05 ALTERNATES
Not Applicable
1.06 SUBMITTALS
A. The following submittals are required for review and approval by the Consultant on/or
before the Pre-Construction Meeting:
1.
Copy of Massachusetts MADLS Asbestos Abatement Contractor's License.
2.
Copies of asbestos notifications.
3.
Chain-Of-Command list of all personnel on-site and emergency contacts.
4.
Work plan which dictates all removal procedures to be implemented.
5.
Name of waste hauler and proposed disposal site.
6.
Copy of proposed waste shipment records to be used for disposal of the ACWM.
B.
The following submittals are required for final payment:
1.
Copy of Waste Shipment Records showing proper disposal of the ACWM, signed
by the landfill.
1.07 CODES AND STANDARDS
A.
All work shall conform to the standards set by applicable Federal, State and local laws,
regulations, ordinances, and guidelines in such form in which they exist at the time of the
work on the contract, and as may be required by subsequent regulations. In addition to
any detailed requirements of the Specification, the Asbestos Abatement Contractor shall
at his own cost and expense comply with all laws, ordinances, rules and regulations of
Federal, State, Regional and Local Authorities regarding handling and storing of asbestos
waste material. This includes all applicable OSHA regulations.
B.
All regulations and other governing agencies in their most current version are applicable
throughout this project. Where there is a conflict between this Specification and the cited
State, Federal, or local regulations, the more restrictive or stringent requirements shall
prevail. This Section refers to many requirements found in these references, but in no
way is it intended to cite or reiterate all provisions therein or elsewhere. It is the Asbestos
Abatement Contractor's responsibility to know, understand, and abide by all such
regulations and common practices.
1.08 FEES, PERMITS & LICENSES
A.
The Asbestos Abatement Contractor shall pay all licensing fees, royalties, and other
costs necessary for the use of any copyrighted or patented product, design, invention, or
process in the performance of the work specified in this section. The Asbestos
Abatement Contractor shall be solely responsible for costs, damages, or losses resulting
from any infringement of these patent rights or copyrights. The Asbestos Abatement
Contractor shall hold the Owner, Owner’s Project Manager and Consultant harmless from
any costs, damages, and losses resulting from any infringement of these patent rights or
copyrights. If the Contract Specification requests the use of any product, design,
invention, or process that requires a licensing, patent or royalty fee for use in the
performance of the job, the Asbestos Abatement Contractor shall be responsible for the
fee or royalty fee and shall disclose the existence of such rights.
B.
Asbestos Abatement Contractor shall be responsible for costs for all licensing
requirements, where applicable and notification requirements and all other fees related to
the Asbestos Abatement Contractors ability to perform the work in this Section.
Boiler Replacement
Elm Street Elementary School
ASBESTOS ABATEMENT
020800 - 4
C. Secure all necessary permits for work under this Section, including hauling, removal, and
disposal, fire, and materials usage, or any other permits required to perform the specified
work.
1.09 CLEANING
A.
Maintain the work site in a neat and orderly manner at all times, so as not to interrupt or
infringe upon the work of other trades. Perform all final cleaning of abatement work
areas as required by this Section and Massachusetts Regulations to the approval of the
Consultant. Upon completion of work in any given area, Asbestos Abatement Contractor
shall remove all material and equipment associated with the work, not necessary to
complete other phases of the work in that area.
B.
Comply with all requirements for final clearance and release of a work area as described
in this Section and required by the Massachusetts Regulations prior to take down of
polyethylene and area clean-up.
1.10 COORDINATION
A.
Extend full cooperation to Owner in all matters involving the use of Owner's facilities. At
no time shall the Asbestos Abatement Contractor cause or allow to be caused conditions,
which may cause risk or hazard to the general public, or conditions that might impair safe
use of the facility.
B.
Coordinate the work of this section with that of all other trades as directed by the Owner’s
Project Manager and the Owner. Phasing and scheduling of this project will be subject to
the approval of the Owner’s Project Manager and the Owner. The work of this Section
shall be scheduled and performed so as not to impede the progress of the project as a
whole. Work shall not proceed in any area without the express consent of the Owner’s
Project Manager and the Owner. The Asbestos Abatement Contractor shall be available
within 24 hours notice for additional work if after acceptance of the work it is found that
full abatement was not achieved from the initial work effort as determined by the Owner’s
Project Manager or Consultant.
C. Complete Asbestos activities in the phases of the final schedule agreed upon by Owner’s
Project Manager and the Owner.
1.11 SUBSTITUTION OF MATERIALS OR METHODS
A.
Consultant approval is required for all modifications to methods, procedures, and design,
which may be proposed by the Asbestos Abatement Contractor. It is the intent of these
documents to allow the Asbestos Abatement Contractor to present alternative methods to
the abatement processes herein, for review by the Consultant. Any such modifications or
substitutions to methods, procedures, or design shall comply with applicable regulations.
Asbestos Abatement Contractor shall submit the proposed modification or substitution no
later than five (5) working days prior to planned commencement of proposed
modification, for review and approval.
B.
Unless requests for modification or substitution are made in accordance with the above
instructions, supported by sufficient proof of equality, Asbestos Abatement Contractor
shall be required to furnish the specifically named or designed items, methods or
procedures designated in this Section.
C. If the modification or substitution necessitates changes or additional work, same shall be
provided and the Asbestos Abatement Contractor shall assume the cost and the entire
responsibility thereto unless performed under the approved Change Order Process.
Boiler Replacement
Elm Street Elementary School
ASBESTOS ABATEMENT
020800 - 5

Sign-up for a Free Trial, Government Bid Alerts

With Free Trial, you can:

You will have a full access to bids, website, and receive daily bid report via email and web.

Try One Week FREE Now

See Also

Bid # Release Date Bid Description Bid Documents Bidder's List Open Date Pre-Bid

City of Cambridge

Bid Due: 5/23/2024

Bid Number: 8452 Bid Title: Framingham Community Center Abatement & Demolition Package Category:

Town of Farmingham

Bid Due: 5/30/2024

Bid Solicitation: BD-25-1966-MVRCS-MVRCS-102305 Header Information Bid Number: BD-25-1966-MVRCS-MVRCS-102305 Description: Demolition of Residential Building

Commonwealth of Massachusetts

Bid Due: 5/28/2024

Bid Solicitation: BD-24-1144-CAMBR-CAMBR-102808 Header Information Bid Number: BD-24-1144-CAMBR-CAMBR-102808 Description: Webster Ave Demolition, File

Commonwealth of Massachusetts

Bid Due: 5/23/2024