TINKER AFB MAC BOA WWYK200051 Replace Switchgear, Bldg 1
| Agency: | DEPT OF DEFENSE |
|---|---|
| State: | Oklahoma |
| Type of Government: | Federal |
| FSC Category: |
|
| NAICS Category: |
|
| Posted Date: | May 18, 2026 |
| Due Date: | Jun 16, 2026 |
| Solicitation No: | FA813726R0025 |
| Original Source: | Please Login to View Page |
| Contact information: | Please Login to View Page |
| Bid Documents: | Please Login to View Page |
Description
APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.
APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.
The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).
- Contract Opportunity Type: Combined Synopsis/Solicitation (Updated)
- Updated Published Date: May 18, 2026 02:07 pm CDT
- Original Published Date: May 01, 2026 11:38 am CDT
- Updated Date Offers Due: Jun 16, 2026 12:00 pm CDT
- Original Date Offers Due: Jun 16, 2026 12:00 pm CDT
- Inactive Policy: Manual
- Updated Inactive Date: Oct 30, 2026
- Original Inactive Date: Oct 30, 2026
-
Initiative:
- None
- Original Set Aside:
- Product Service Code:
-
NAICS Code:
-
Place of Performance:
Tinker AFB , OK 73145USA
Only the MAC BOA Holder GCs that attended Site Visit on 14 May 2026 will be able to continue forward toward the award.
Updated 18 May 2026
Description of update:
WWYK200051 Switchgear Specs have been uploaded and attached in the Attachments.
The final Solicitation - Request for Proposal (RFP) is still in draft and will be posted as an amendment to this notice once it is finalized. RFI are still due this upcoming Thursday May 21st at 5:00pm Central Time.
Only the MAC BOA Holder GCs that attended Site Visit on 14 May 2026 will be able to continue forward toward the award.
Updated 14 May 2026
Description of update:
All Requests for Information (RFIs) from eligible attendees must be submitted via email to the Contracting Points of Contact no later than 21 May 2026 at 5:00 PM CST.
The final Solicitation - Request for Proposal (RFP) is still in draft and will be posted as an amendment to this notice once it is finalized.
This posting is for Tinker AFB - MAC BOA Holders ONLY.
Project Solicitation Number: FA813726R0025
Project Title: WWYK200051 Replace Switchgear, Bldg 1
Project Location: Tinker AFB - BUILDING 1.
Replace the 3000amp 208Volt switchgear in the center of building 1. There is a 3000amp main and two 600amp feeder breakers.
The estimated project value is below $25M and is restricted to SB MAC BOA holders only.
Project specific documents are attached to this posting.
If you experience any difficulty at receiving or access to the project specific documents, send an email request to Contracting Points of Contact listed to have a DoD Safe document transmission. In the email, please provide email addresses for Prime Contractor ONLY points of contact to have the DoD Safe link sent to. Do not include any Sub-Contractor email addresses.
Currently, the Solicitation – Request for Proposal (RFP) is in the draft stage and will be posted once available.
This posting is for Tinker AFB - MAC BOA Holders ONLY.
After review of the project specific documents, if you are a Tinker AFB – MAC BOA Holder, please send an email to the Contracting Points of Contact as an RSVP stating you are interested in attending the Initial Site Visit. Your RSVP email must be received within 5 calendar days from the posting of this project. In your RSVP, please let us know if all personnel that will be attending the Initial Site Visit have base access. If anyone requires base access, you must forward with your RSVP the Entry Access List (EAL) so that we can know how many personnel require base access. ***** ONLY MAC BOA Prime Contractors are to RSVP, Subcontractors are to inform at least one Prime Contractor of their intention to attend and if a Subcontractor requires base access, they must be sponsored by a Prime Contractor.
After receipt of your RSVP and EAL if required, an Initial Site Visit will be coordinated. Current date/time for Initial Site Visit is set for Thursday May 14, 2026 at 10:00 AM Central Time. The location instructions and directions are in the attachments for the Initial Site Visit.
You must attend the Initial Site Visit for the project to be considered eligible to propose.
This posting is for Tinker AFB - MAC BOA Holders ONLY.
- CP 405 739 4040 7799 ARNOLD AVE BLDG 3 FIRST FLOOR
- TINKER AFB , OK 73145-9125
- USA
- Dedrian Parmer Jr
- Dedrian.Parmer@us.af.mil
- Phone Number 4057340860
- Stephen Palmer
- stephen.palmer@us.af.mil
- Phone Number 4057394182
- May 18, 2026 02:07 pm CDTCombined Synopsis/Solicitation (Updated)
- May 14, 2026 12:41 pm CDT Combined Synopsis/Solicitation (Updated)
- May 01, 2026 11:38 am CDT Combined Synopsis/Solicitation (Original)
Related Document
See Also
Project Number - SP 21-8 Project Title - Mohawk Filter Press Building Roof
City of Tulsa
Due by 10/16/2026
Follow Z2DA--635-21-139 | Repair Parking Garage 1 Deficiencies | CON (VA-26-00041470) (NRM -
VETERANS AFFAIRS, DEPARTMENT OF
Follow WWYK200270 CNSLD Demo Convert Space to Drug Testing Office, B7037 Active Contract
DEPT OF DEFENSE
Follow 697DCK-26-R-00355: OKC ATCT Full-Service Elevator Maintenance Active Contract Opportunity Notice ID 697DCK-26-R-00355
TRANSPORTATION, DEPARTMENT OF
Due by 10/26/2026