TINKER AFB MAC BOA WWYK240149 RENOVATE NE AREA OF SOUTH PROJECT, B3
| Agency: | DEPT OF DEFENSE |
|---|---|
| State: | Oklahoma |
| Type of Government: | Federal |
| FSC Category: |
|
| NAICS Category: |
|
| Set Aside: | Total Small Business Set-Aside (FAR 19.5) |
| Posted Date: | Mar 31, 2025 |
| Due Date: | May 12, 2025 |
| Solicitation No: | FA813725R0016 |
| Original Source: | Please Login to View Page |
| Contact information: | Please Login to View Page |
| Bid Documents: | Please Login to View Page |
Description
APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.
APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.
The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).
- Contract Opportunity Type: Solicitation (Original)
- Original Published Date: Mar 31, 2025 12:14 pm CDT
- Original Date Offers Due: May 12, 2025 03:00 pm CDT
- Inactive Policy: Manual
- Original Inactive Date: Jul 31, 2025
-
Initiative:
- None
- Original Set Aside: Total Small Business Set-Aside (FAR 19.5)
- Product Service Code: Z2AA - REPAIR OR ALTERATION OF OFFICE BUILDINGS
-
NAICS Code:
- 236220 - Commercial and Institutional Building Construction
-
Place of Performance:
Tinker AFB , OK 73145USA
This posting is for Tinker AFB - MAC BOA Holders ONLY.
Project Solicitation Number: FA813725R0016
Project Title: WWYK240149 – RENOVATE NE AREA OF SOUTH PROJECT, B3
Project Location: Tinker AFB - B3 Door C on South Side of Building
Repair/replacement of HVAC to accommodate the new systems furniture layout, relocated and added lighting fixtures, electrical feeds for new systems furniture layout, Fire Alarm devices, Fire Protection sprinklers, relocated fire extinguisher cabinets, flooring and base, acoustical tiles ceiling, new wall, door and frame at conference room in Building 3.
Project specific documents are attached to this posting.
If you experience any difficulty at receiving or access to the project specific documents, send an email request to Contracting Points of Contact listed to have a DoD Safe document transmission. In the email, please provide email addresses for Prime Contractor ONLY points of contact to have the DoD Safe link sent to. Do not include any Sub-Contractor email addresses.
Currently, the Solicitation – Request for Proposal (RFP) is in the draft stage and will be posted once available.
This posting is for Tinker AFB - MAC BOA Holders ONLY.
After review of the project specific documents, if you are a Tinker AFB – MAC BOA Holder, please send an email to the Contracting Points of Contact as an RSVP stating you are interested in attending the Initial Site Visit. Your RSVP email must be received by Wednesday, 02 April 2025 2:00 PM CT. In your RSVP, please let us know if all personnel that will be attending the Initial Site Visit have base access. If anyone requires base access, you must forward with your RSVP the Entry Access List (EAL) so that we can know how many personnel require base access. After receipt of your RSVP and EAL if required, an MS Outlook meeting invite will be coordinated and will be forwarded stating the date and time of the Initial Site Visit.
You must attend the Initial Site Visit for the project to be considered eligible to propose.
Current date and time for site visit is 07 Apr 2025, 9:30 AM CT - 10:30 AM CT
Location: Building 3, Door C on South Side of Building
>>>>>This is an active construction site, you must bring construction PPE to attend initial site visit
***Some files where not able to upload and will be made available after RSVP to site visit by email.***
This posting is for Tinker AFB - MAC BOA Holders ONLY.
- CP 405 739 4040 7858 5TH ST STE 1
- TINKER AFB , OK 73145-9125
- USA
- Eric Owens
- eric.owens.8@us.af.mil
- Phone Number 405-736-3414
- Stephen Palmer
- stephen.palmer@us.af.mil
- Phone Number 4057394182
- Mar 31, 2025 12:14 pm CDTSolicitation (Original)
Related Document
| Apr 10, 2025 | [Solicitation (Updated)] TINKER AFB MAC BOA WWYK240149 RENOVATE NE AREA OF SOUTH PROJECT, B3 |
| Apr 14, 2025 | [Solicitation (Updated)] TINKER AFB MAC BOA WWYK240149 RENOVATE NE AREA OF SOUTH PROJECT, B3 |
| Apr 16, 2025 | [Solicitation (Updated)] TINKER AFB MAC BOA WWYK240149 RENOVATE NE AREA OF SOUTH PROJECT, B3 |
| Apr 30, 2025 | [Solicitation (Updated)] TINKER AFB MAC BOA WWYK240149 RENOVATE NE AREA OF SOUTH PROJECT, B3 |
See Also
Project Number - SP 21-8 Project Title - Mohawk Filter Press Building Roof
City of Tulsa
Due by 10/16/2026
Follow Z2DA--635-21-139 | Repair Parking Garage 1 Deficiencies | CON (VA-26-00041470) (NRM -
VETERANS AFFAIRS, DEPARTMENT OF
Follow WWYK200270 CNSLD Demo Convert Space to Drug Testing Office, B7037 Active Contract
DEPT OF DEFENSE
Follow 697DCK-26-R-00355: OKC ATCT Full-Service Elevator Maintenance Active Contract Opportunity Notice ID 697DCK-26-R-00355
TRANSPORTATION, DEPARTMENT OF
Due by 10/26/2026