| Agency: | City of Thornton |
|---|---|
| State: | Colorado |
| Type of Government: | State & Local |
| NAICS Category: |
|
| Posted Date: | Jul 16, 2026 |
| Due Date: | Jul 23, 2026 |
| Original Source: | Please Login to View Page |
| Contact information: | Please Login to View Page |
| Bid Documents: | Please Login to View Page |
| Solicitation number | Status | Due | Description | Attachments |
| 12-777XP | Active | 7/23/2026 2:00 PM | Thornton Water Project Source Water Pump Station |
|
CITY OF THORNTON, COLORADO
THORNTON WATER PROJECT
PROJECT NO. 12-777XP
CHEMICAL BUILDING AND PRV VAULTS
TECHNICAL SPECIFICATIONS
ISSUED FOR BID
VOLUME 2 OF (cid:24)
DIVISIONS 01-46
MAY 2026
Digitally signed by Bart L. Giles
Contact Info: Carollo Engineers, Inc.
Date: 2026.05.06 14:50:19-06'00'
11030CIRCLEPOINTROAD,SUITE400 (cid:131) WESTMINSTER, COLORADO80020 (cid:131) P 303-635-1220
pw://Carollo/Documents/CO/Thornton/204403-100000/04 Design/04 Specs/Carollo/00_01_02
CITY OF THORNTON
(PROJECT NO. 12-777XP)
THORNTON WATER PROJECT
Digitally signed by Bart L. Giles
Contact Info: Carollo Engineers, Inc.
Date: 2026.05.06 14:50:37-06'00' CHEMICAL BUILDING AND PRV VAULTS
TABLE OF CONTENTS
VOLUME 2 OF 5
SECTION NO. TITLE
DIVISION 01 - GENERAL REQUIREMENTS
01_11_00 SUMMARY OF WORK
01_20_20 MEASUREMENT AND PAYMENT
01_31_19 PROJECT MEETINGS
01_31_24 WEB BASED CONSTRUCTION DOCUMENT MANAGEMENT
01_32_21 SCHEDULES AND REPORTS
01_32_34 PHOTOGRAPHIC AND VIDEOGRAPHIC DOCUMENTATION
01_33_00 SUBMITTAL PROCEDURES
01_35_73 DELEGATED DESIGN PROCEDURES
01_41_00 REGULATORY REQUIREMENTS
01_45_17 CONTRACTOR QUALITY CONTROL PLAN
01_45_24 REGULATORY QUALITY ASSURANCE
01_50_00 TEMPORARY FACILITIES AND CONTROLS
01_55_26 TRAFFIC CONTROL
01_60_01 PRODUCT REQUIREMENTS
01_71_23 FIELD SURVEY
01_75_17 COMMISSIONING
01_75_19 WATER LEAKAGE TEST FOR CONCRETE STRUCTURES
01_78_24 OPERATION AND MAINTENANCE MANUALS
01_78_36 WARRANTIES AND BONDS
01_81_50 DESIGN CRITERIA
DIVISION 03 - CONCRETE
03_01_01 PREPACKAGED SMALL AGGREGATE REPAIR CONCRETE
03_11_07 CONCRETE FORMWORK
03_15_00 CONCRETE ACCESSORIES
03_20_00 CONCRETE REINFORCING
03_21_17 ADHESIVE-BONDED REINFORCING BARS AND ALL THREAD RODS IN
CONCRETE
03_30_00 CAST-IN-PLACE-CONCRETE
03_35_29 CONCRETE FINISHES
03_41_41 PRECAST CONCRETE ROOF AND WALL PANELS
03_60_00 GROUTING
Table of Contents Thornton Water Project (12-777XP)
00_01_10-1 204403-10 Chemical Building and PRVVaults
CO/Thornton/204403-100000/04 Design/04 Specs/Carollo/00_01_10(IFB2) May 2026
SECTION NO. TITLE
03_63_01 EPOXIES
03_63_02 EPOXY RESIN/PORTLAND CEMENT BONDING AGENT
03_64_24 EPOXY INJECTION SYSTEM
03_64_25 HYDROPHILIC AND HYDROPHOBIC FOAM POLYURETHANE RESIN
INJECTION SYSTEM
03_70_30 THERMAL CONTROL OF CONCRETE
DIVISION 04 - MASONRY
04_05_17 MORTAR AND MASONRY GROUT
04_05_18 ADHESIVE BONDING REINFORCING BARS AND ALL THREAD RODS IN
MASONRY
04_05_23 MASONRY ACCESSORIES
04_22_00 CONCRETE UNIT MASONRY
04_26_13 MASONRY VENEER
DIVISION 05 - METALS
05_05_24 MECHANICAL ANCHORING AND FASTENING TO CONCRETE AND
MASONRY
05_12_00 STRUCTURAL STEEL FRAMING
05_14_05 STRUCTURAL ALUMINUM
05_50_00 METAL FABRICATIONS
DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES
06_10_00 ROUGH CARPENTRY
06_80_15 FIBERGLASS REINFORCED PLASTIC
06_80_17 FIBERGLASS REINFORCED PLASTIC FABRICATIONS
06_81_03 FIBERGLASS REINFORCED PLASTIC HANDRAIL AND GUARDRAIL
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
07_11_13 BITUMINOUS DAMPPROOFING
07_19_00 WATER REPELLENTS
07_21_00 THERMAL INSULATION
07_27_26 FLUID APPLIED MEMBRANE AIR BARRIERS
07_53_23 ETHYLENE PROPYLENE DIENE MONOMER (EPDM) ROOFING
07_62_00 SHEET METAL FLASHING AND TRIM
07_72_00 ROOF ACCESSORIES
07_84_13 PENETRATION FIRESTOPPING
07_84_43 JOINT FIRESTOPPING
07_92_00 JOINT SEALANTS
07_92_21 PRECAST CONCRETE JOINT SEALER
Table of Contents Thornton Water Project (12-777XP)
00_01_10-2 204403-10 Chemical Building and PRV Vaults
CO/Thornton/204403-100000/04 Design/04 Specs/Carollo/00_01_10 (IFB2) May 2026
SECTION NO. TITLE
DIVISION 08 - OPENINGS
08_11_13 HOLLOW METAL DOORS AND FRAMES
08_33_23 OVERHEAD COILING DOORS
08_51_13 ALUMINUM WINDOWS
08_71_00 DOOR HARDWARE
08_80_00 GLAZING
DIVISION 09 - FINISHES
09_96_01 HIGH-PERFORMANCE COATINGS
09_99_97 STEEL PIPELINE COATINGS
DIVISION 10 - SPECIALTIES
10_14_00 SIGNAGE
10_44_16 FIRE EXTINGUISHERS
DIVISION 21 - FIRE SUPPRESSION
21_13_14 WET PIPE FIRE EXTINGUISHING SYSTEMS
DIVISION 22 - PLUMBING
22_42_01 PLUMBING SYSTEMS
22_45_17 EMERGENCY EYE/FACE WASH AND SHOWER EQUIPMENT
DIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONING (HVAC)
23_05_00 COMMON WORK RESULTS FOR HVAC
23_05_93 TESTING, ADJUSTING, AND BALANCING FOR HVAC
23_07_13 DUCTWORK INSULATION
23_09_13 INSTRUMENTATION AND CONTROL DEVICES FOR HVAC
23_31_13 METAL DUCTS
23_34_01 FANS
23_75_34 MAKEUP AIR UNIT
23_81_44 HEAT PUMPS
23_83_01 HEATING UNITS
DIVISION 26 - ELECTRICAL
26_05_00 COMMON WORK RESULTS FOR ELECTRICAL
26_05_03 UTILITY COORDINATION
26_05_18 600-VOLT OR LESS WIRES AND CABLES
26_05_21 LOW VOLTAGE WIRE CONNECTIONS
26_05_26 GROUNDING AND BONDING
26_05_29 HANGERS AND SUPPORTS
26_05_33 CONDUITS
26_05_34 BOXES
26_05_44 DUCT BANKS
Table of Contents Thornton Water Project (12-777XP)
00_01_10-3 204403-10 Chemical Building and PRV Vaults
CO/Thornton/204403-100000/04 Design/04 Specs/Carollo/00_01_10 (IFB2) May 2026
SECTION NO. TITLE
26_05_53 IDENTIFICATION FOR ELECTRICAL SYSTEMS
26_05_74 ELECTRICAL SYSTEM STUDIES
26_06_01 CONDUIT SCHEDULE
26_08_50 FIELD ELECTRICAL ACCEPTANCE TESTS
26_09_13 ELECTRICAL POWER MONITORING
26_22_14 DRY-TYPE TRANSFORMERS
26_24_16 PANELBOARDS
26_27_26 WIRING DEVICES
26_28_01 LOW VOLTAGE MOLDED CASE CIRCUIT BREAKERS
26_28_14 LOW VOLTAGE FUSES
26_28_17 DISCONNECT SWITCHES
26_32_14 SINGLE DIESEL FUELED ENGINE GENERATOR
26_33_54 UNINTERRUPTIBLE POWER SUPPLIES 10 - 30 KVA
26_36_24 TRANSFER SWITCHES
26_41_01 LIGHTNING PROTECTION
26_42_13 CATHODIC PROTECTION - CHEMICAL BUILDING AND LCC PRV
26_43_14 SURGE PROTECTIVE DEVICES
26_50_10 LIGHTING: LED LUMINAIRES
DIVISION 28 - ELECTRONIC SAFETY AND SECURITY
28_10_00 ELECTRONIC ACCESS CONTROL AND INTRUSION DETECTION
28_23_29 VIDEO SURVEILLANCE REMOTE DEVICES AND SENSORS
28_31_01 FIRE ALARM AND SMOKE DETECTION SYSTEM
DIVISION 31 - EARTHWORK
31_00_00 EARTHWORK
31_05_15 SOILS AND AGGREGATES FOR EARTHWORK
31_10_00 SITE CLEARING
31_23_18 ROCK REMOVAL
31_23_19 DEWATERING
31_23_24 CONTROLLED LOW STRENGTH MATERIAL (CLSM)
31_23_24.10 CONTROLLED LOW STRENGTH MATERIAL FOR SLURRY WALL
REPAIR (CLSMSW)
31_23_35 TRENCHING
31_32_18.04 STABILIZATION FABRIC
31_36_02 RIPRAP AND GABIONS EROSION AND SEDIMENTATION CONTROL
31_50_00 EXCAVATION SUPPORT AND PROTECTION
31_63_30 DRILLED CONCRETE PIERS
DIVISION 32 - EXTERIOR IMPROVEMENTS
32_12_15 ASPHALTIC CONCRETE PAVING
32_16_14 CONCRETE CURBS, GUTTERS, AND SIDEWALKS
32_17_23 PAVEMENT MARKINGS
Table of Contents Thornton Water Project (12-777XP)
00_01_10-4 204403-10 Chemical Building and PRV Vaults
CO/Thornton/204403-100000/04 Design/04 Specs/Carollo/00_01_10 (IFB2) May 2026
SECTION NO. TITLE
32_31_00 FENCES AND GATES
32_92_19 SEEDING
DIVISION 33 - UTILITIES
33_05_01.01 WELDED STEEL PIPE AND FITTINGS
33_05_18 PRECAST CONCRETE VAULTS
33_05_31.15 POLYVINYL CHLORIDE (PVC) PIPE: PRESSURE
33_05_61.01 CONCRETE MANHOLES
33_05_62 PRECAST DRAINAGE STRUCTURES
33_71_21 PRECAST ELECTRICAL HANDHOLES AND ELECTRICAL MANHOLES
DIVISION 40 - PROCESS INTEGRATION
40_05_00.01 COMMON WORK RESULTS FOR GENERAL PIPING
40_05_00.03 PIPE IDENTIFICATION
40_05_00.09 PIPING SYSTEMS TESTING
40_05_06.01 PIPING SPECIALTIES
40_05_06.03 PIPE COUPLINGS
40_05_06.10 STRAINERS
40_05_06.55 PIPING INSULATION
40_05_07.01 PIPE SUPPORTS
40_05_07.03 PREFORMED CHANNEL PIPE SUPPORT SYSTEM
40_05_07.05 NON-METALLIC PIPE SUPPORT SYSTEM
40_05_17.05 COPPER WATER TUBE: SEAMLESS, ASTM B88
40_05_19.01 DUCTILE IRON PIPE: AWWA C151
40_05_23.01 STAINLESS STEEL PIPE AND TUBING
40_05_24.01 STEEL PIPE - EXPOSED
40_05_31.17 POLYVINYL CHLORIDE (PVC) PIPE: SCHEDULE TYPE
40_05_31.22 CHLORINATED POLYVINYL CHLORIDE (CPVC) PIPE: ASTM F441
40_05_33.03 HIGH DENSITY POLYETHYLENE (HDPE) PIPE
40_05_33.11 DOUBLE CONTAINMENT POLYETHYLENE PIPE
40_05_51.01 COMMON WORK RESULTS FOR VALVES
40_05_52 SPECIALTY VALVES
40_05_54 HORIZONTAL SLEEVE VALVES
40_05_57.24 ELECTRIC ACTUATORS
40_05_62 PLUG VALVES
40_05_63 BALL VALVES
40_05_64 BUTTERFLY VALVES
40_05_65.01 GATE, GLOBE, AND ANGLE VALVES
40_05_65.24 CHECK VALVES
40_05_67.37 PRESSURE CONTROL VALVES
40_05_67.40 AIR AND VACUUM RELIEF VALVES
40_41_00 PROCESS PIPING AND EQUIPMENT HEAT TRACING
Table of Contents Thornton Water Project (12-777XP)
00_01_10-5 204403-10 Chemical Building and PRV Vaults
CO/Thornton/204403-100000/04 Design/04 Specs/Carollo/00_01_10 (IFB2) May 2026
SECTION NO. TITLE
40_61_00 COMMON WORK RESULTS FOR PROCESS CONTROL AND
INSTRUMENTATION SYSTEMS
40_61_15 CONTROL STRATEGIES
40_61_16 SPECIFIC CONTROL STRATEGIES
40_64_01 CONTROL SYSTEMS: PROGRAMMABLE LOGIC CONTROLLERS
40_64_21 CONTROL SYSTEMS: LOCAL OPERATOR INTERFACE (LOI)
40_66_01 CONTROL SYSTEMS: NETWORK MATERIALS AND EQUIPMENT
40_66_71 CONTROL SYSTEMS: WIRELESS COMMUNICATIONS - CELLULAR
40_67_01 CONTROL SYSTEMS: PANELS, ENCLOSURES, AND PANEL
COMPONENTS
40_67_26 CONTROL SYSTEMS: UNINTERRUPTIBLE POWER SUPPLIES 10 KVA
AND BELOW
40_71_15 FLOW MEASUREMENT: MAGNETIC FLOWMETERS
40_72_24 LEVEL MEASUREMENT: RADAR PULSE TIME OF FLIGHT (PTOF)
40_72_76 LEVEL MEASUREMENT: SWITCHES
40_73_13 PRESSURE/VACUUM MEASUREMENT: GAUGES
40_73_23 PRESSURE/VACUUM MEASUREMENT: DIRECT
40_73_29 PRESSURE/VACUUM MEASUREMENT: DIFFERENTIAL
40_73_63 PRESSURE/VACUUM MEASUREMENT: DIAPHRAGM SEALS
40_73_64 PRESSURE/VACUUM MEASUREMENT: INSTRUMENT VALVES
40_75_13 ANALYZERS: PH
40_75_14 ANALYZERS: ORP
40_75_23 ANALYZERS: RESIDUAL CHLORINE
40_75_53 ANALYZERS: TURBIDITY
40_80_01 COMMISSIONING FOR INSTRUMENTATION AND CONTROLS
40_96_15 SCHEDULES: I/O LIST
DIVISION 43 - PROCESS GAS AND LIQUID HANDLING,
PURIFICATION, AND STORAGE EQUIPMENT
43_23_13.45 HORIZONTAL SELF-PRIMING SAMPLE CENTRIFUGAL PUMPS
43_23_40.20 HORIZONTAL MAGNETIC DRIVE CENTRIFUGAL PUMPS
43_25_00.10 SUBMERSIBLE SUMP PUMPS
43_25_00.15 SUBMERSIBLE CHEMICAL LIQUID SUMP PUMPS
43_33_10.02 LIQUID CHEMICAL PERISTALTIC TUBE METERING PUMPS
43_41_43 POLYETHYLENE TANKS
DIVISION 46 - WATER AND WASTEWATER EQUIPMENT
46_05_10 COMMON WORK RESULTS FOR MECHANICAL EQUIPMENT
46_05_94 MECHANICAL EQUIPMENT TESTING
Table of Contents Thornton Water Project (12-777XP)
00_01_10-6 204403-10 Chemical Building and PRV Vaults
CO/Thornton/204403-100000/04 Design/04 Specs/Carollo/00_01_10 (IFB2) May 2026
SECTION 01_11_00
SUMMARY OF WORK
PART 1 GENERAL
1.01 SUMMARY
A. The Work is generally separated into 3 parts and is located as follows:
1. Chemical Building, pressure reducing sleeve valve and flow meter (Segment A
PRV and meter), and West Gravel Lakes (WGL) Pump Station chemical feed
improvements:
a. The Work for this portion of the project is located south of the intersection
of 88th Avenue and Colorado Blvd near the City of Thornton's Wes Brown
Water Treatment Plant (WBWTP) and the South Platte River, in the City
of Thornton.
2. Lower Clear Creek Canal pressure reducing sleeve valve (LCC PRV) and
vault improvements:
a. The Work for this portion of the project is located west of the intersection
of East 100th Avenue and McKay Road, in the City of Thornton.
3. Signal Hill pressure instrument improvements:
a. The Work for this portion of the project is located west of Quebec Street,
north of the intersection of East 136th Avenue and Quebec Street, in the
City of Thornton.
1.02 DOCUMENT APPLICABILITY
A. Requirements stated in the following documents apply to the Technical Sections
except as amended in a Technical Section:
1. Project Manual including City of Thornton General and Special Conditions.
1.03 CONTRACT DOCUMENTS
A. The following documents represent the Contract Documents in order of precedent:
1. Project Manual for Construction.
2. Volume 1: Drawings.
3. Volume 2: Technical Specifications Divisions 1 through 46.
4. Volume 3: Geotechnical Investigation Report (GIR):
a. The GIR presents a summary of project field investigations, laboratory
testing, and design recommendations for the LCC PRV Vault facility.
5. Volume 4: Geotechnical Design Memorandum (GDM):
a. The GDM presents a summary of project field investigations, laboratory
testing, and design recommendations for the Chemical Building.
b. Includes an April 20, 2026, addendum for generator foundation
recommendations at the Chemical Building.
6. Volume 5: Geotechnical Data Report (GDR):
a. The GDR presents a summary of project field investigations and
laboratory testing. The GDR is a non-interpretive document intended to
support design and is not considered part of the Contract Documents.
Summary of Work Thornton Water Project (12-777XP)
01_11_00-1 204403-10 Chemical Building and PRV Vaults
CO/Thornton/204403-100000/04 Design/04 Specs/Carollo/01_11_00 (IFB2) May 2026
1.04 OWNER AND ASSIGNED SUBCONTRACTORS
A. Owner: The City of Thornton, 9500 Civil Center Drive, Thornton, CO 80229.
B. The City of Thornton has retained the following Subcontractors under separate
agreements to support design and construction:
1. Engineer: Carollo Engineers, Inc., has been retained for preparation of
Contract Documents. 390 Interlocken Crescent, Suite 800, Broomfield,
CO 80021.
2. Owners Advisor: Jacobs Engineering has been retained to serve as the
Owners Advisor and to assist in administering agreements between the City of
Thornton, Construction Manager, and Contractor.
3. Environmental Consultant: ERO Resources has been retained to perform
cultural resources survey, habitat and environmental surveys, and migratory
bird and raptor surveys and to provide environmental considerations and work
restrictions in the Contract Documents.
4. Construction Manager: Construction Manager to support the City of Thornton
during construction and to assist in administering agreements between the
City of Thornton and Contractor. The words Construction Manager in technical
specification sections also means Engineer when requiring technical input on
the project.
5. Owners Programmer: Programmer and SCADA integrator retained by the
Owner to provide programming and SCADA integration for the facilities under
this contract.
1.05 THE WORK
A. The Work consists of construction, permitting, testing, coordination, quality control,
and all items required to provide an operating system of:
1. Chemical Building, Segment A PRV and meter, and WGL Pump Station
Chemical Feed improvements:
a. These improvements consist of construction of a new chemical feed
building with an electrical and control room and a chemical room, a sleeve
valve and meter inside an existing vault, a new electrical feed, a new
standby generator. The Work also includes, but is not limited to, chemical
feed and sample pumps, piping, and valves, chemical storage tanks,
sump pumps and discharge piping, sample panels, instrumentation and
control equipment, fiber optic networking and cellular communications
equipment, HVAC equipment, and utilities.
2. LCC PRV and vault improvements:
a. These improvements consist of construction of a new concrete vault, steel
piping, pressure reducing sleeve valve, gate valve, fiber optic conduits,
electrical conduits, connections and modifications to existing electrical and
control panels, instrumentation, fiber optic networking and cellular
communications equipment, site road, electrical power feed, electrical
improvements, instrumentation improvements, and other miscellaneous
items.
Summary of Work Thornton Water Project (12-777XP)
01_11_00-2 204403-10 Chemical Building and PRV Vaults
CO/Thornton/204403-100000/04 Design/04 Specs/Carollo/01_11_00 (IFB2) May 2026
3. Signal Hill pressure instrument improvements:
a. These improvements consist of construction of pressure instruments,
connection of pressure instruments to existing piping within an existing
vault, electrical power feed, electrical and control cabinets, fencing, gates,
instrumentation, electrical improvements, fiber optic networking and
cellular communications equipment, and other miscellaneous items.
4. Configuration, programming, and SCADA integration of the process control
system and the fiber optic network equipment will be provided by the Owners
Programmer.
5. Configuration of the cellular communications equipment will be provided by the
Contractor.
1.06 COORDINATION WITH OTHER ENTITIES
A. Activities by others which may affect performance of work:
1. ERO Resources has performed the following services in support of the project:
a. Migratory bird and raptor surveys.
2. City of Thornton will procure and furnish up to 4 project signs for installation by
the Contractor. Project signs to be installed by Contractor at locations selected
by City of Thornton representatives.
3. Contractor will be required to work with and support the Owners Programmer,
who will be providing programming and SCADA integration of the process
controls for the facilities.
4. Contractor will be responsible for cellular communication service and cost of
the Owner's selected cellular service during start-up and commissioning
activities through initial acceptance.
B. Contractor's use of premises:
1. Contractor shall limit all work to the Limits of Construction shown on the
drawings, and dedicated right-of-way and City of Thornton permanent
easements and property.
2. Storage of equipment and materials in roadway right-of-way shall be limited to
construction activities and shall be removed immediately upon completion of
work associated with roadway crossing.
3. Contractor staging and laydown areas that have been approved by the City of
Thornton are indicated on the Drawings. City of Thornton has made no
provisions for additional Contractor staging and laydown areas. Contractor
may make separate arrangements with adjacent or nearby property owners for
acquisition of separate temporary easement for Contractors use at no
additional cost to the City of Thornton. Provide written agreements to the
Construction Manager for review and approval.
4. Contractor shall maintain access to all roadways, trails, sidewalks, and all
private residences for the duration of construction.
C. Landowner's use of premises:
1. Operating facilities, private landowners, utility owners, and ditch companies
shall have access to properties and facilities the duration of construction.
Contractor shall coordinate and cooperate with landowners to minimize
construction impacts to existing operations to the extent possible.
Summary of Work Thornton Water Project (12-777XP)
01_11_00-3 204403-10 Chemical Building and PRV Vaults
CO/Thornton/204403-100000/04 Design/04 Specs/Carollo/01_11_00 (IFB2) May 2026
With Free Trial, you can:
You will have a full access to bids, website, and receive daily bid report via email and web.
Bid Number: 26-012 Bid Title: Rotary Park Pump House Replacement Category: Construction and
City of Montrose
Bid Due: 8/19/2026
Project ID: RFQ 026RM023 Title: East Metro Compressor Replacement Addenda: 0 Release Date:
Regional Transportation District - Denver
Bid Due: 8/11/2026
Compressed Natural Gas (CNG) Compressor Replacement RFP-5944-26-DD Responses Due August 14, 2026, before
City of Grand Junction
Bid Due: 8/14/2026
Compressed Natural Gas (CNG) Compressor Replacement RFP-5944-26-DD Responses Due August 14, 2026, before
City of Grand Junction
Bid Due: 8/14/2026