Thatcher Brook Sewer Protection and Bank Stabilization

Agency: State Government of Vermont
State: Vermont
Type of Government: State & Local
NAICS Category:
  • 237990 - Other Heavy and Civil Engineering Construction
  • 238910 - Site Preparation Contractors
Posted Date: Jun 2, 2026
Due Date: Jul 1, 2026
Original Source: Please Login to View Page
Contact information: Please Login to View Page
Bid Documents: Please Login to View Page

Description

Thatcher Brook Sewer Protection and Bank Stabilization Request Date: 6/2/2026 5:23:15 PM
Open Date: 6/2/2026
Closing Date: 7/1/2026 1:00 PM
Intent To Bid Deadline:
Est. Dollar Value: $0.00
RFQ Number:

Town of Waterbury

28 N Main Street
Waterbury ,
VT 05676

Bid Type:
Job Contract

Locations:
Washington
Keywords:
Construction (Non Building)

Bid Description:
The goal of the project is to stabilize Thatcher Brook in Waterbury downstream of the I-89 highway bridge to protect the sewer lines located in the channel and floodplain. The project generally includes
removing fill to widen the channel, creating a flood bench, stabilizing the banks, and establishing river channel grade control through a series of weirs. The project location is 1,200-feet of the channel where the channel and Stowe Street are in close proximity. The project is located in the Edward Farrar Utility
District (Downtown Waterbury, VT) that is seeking competitive bids to complete the stabilization project. Construction plans accompany this Request for Construction Bids.
Special Instructions:
Please contact Roy at rschiff@slrconsulting.com for the complete bid package including design plans.
Contact Information:
Roy Schiff
Phone: (802) 882-8335
Fax:
Email: rschiff@slrconsulting.com
For additional information:
Bid Attachments:
Thatcher Brook Sewer Bid No Attachments.pdf

Site Visit: Date: 6/12/2026 11:00:00 AM Mandatory Site Visit

Meet at the Waterbury Armory at 294 Armory Drive.
Get Government Bids Like This by Email Receive daily bid alerts that match your keywords, business categories, and target regions.

See Also

TITLE QUESTIONS DUE ANSWERS POSTED DUE DATE NO POSTING AFTER RFP 143 Mental

State of Vermont

Due by 10/16/2026

Davis Park Maintenance Building RFP 2026 Final with Appendix 8-31-26 Shelburne Building and

Town of Shelburne

Due by 9/30/2026

Barnard Brook at Woodstock Garden Bank Stabilization Request Date: 9/17/2026 2:26:15 PM Open

State Government of Vermont

Due by 10/20/2026

Pine Hill Park Accessible Trail Project Request Date: 8/11/2026 8:16:08 AM Open Date:

State Government of Vermont

Due by 10/06/2026

* Disclaimer: This website provides information about bids, requests for proposals (RFPs), or requests for qualifications (RFQs) for convenience only and does not serve as an official public notice. Individuals who wish to respond to or inquire about bids, RFPs, or RFQs should contact the relevant government department directly.