| Agency: | Arlington city |
|---|---|
| State: | Washington |
| Type of Government: | State & Local |
| Posted Date: | Apr 17, 2026 |
| Due Date: | May 5, 2026 |
| Solicitation No: | P02.530 |
| Original Source: | Please Login to View Page |
| Contact information: | Please Login to View Page |
| Bid Documents: | Please Login to View Page |
| Bid Number: |
P02.530
|
| Bid Title: |
67th Sewer Interceptor Upsizing
|
| Category: | Open |
| Status: | Open |
|
| LEGEND GENERAL NOTES SEWER GENERAL NOTES EXISTING LEGEND PROPOSED LEGEND 1. ALL WORKMANSHIP, CONSTRUCTION AND MATERIALS SHALL BE PERFORMED OR SUPPLIED IN ACCORDANCE WITH THESE SPECIAL 1. SEE SPECIFICATION APPENDICES FOR CITY SEWER GENERAL NOTES (CH. 5). SEE DWG NO. D01 FOR CITY STANDARD DETAILS. PROVISIONS, PLANS, CITY OF ARLINGTON (CITY) STANDARD DETAILS, AND THE WSDOT STANDARD SPECIFICATIONS FOR ROAD, SEWER PIPE BRIDGE, AND MUNICIPAL CONSTRUCTION, 2023 EDITION, AS ISSUED BY THE WASHINGTON STATE DEPARTMENT OF 2. WHEN EXCAVATION OF ROCK IS ENCOUNTERED, ALL ROCK SHALL BE REMOVED TO PROVIDE A CLEARANCE BELOW, ON EACH SIDE OF ALL PIPE, TRANSPORTATION AND THE AMERICAN PUBLIC WORKS ASSOCIATION, WHICH IS HEREINAFTER REFERRED TO AS THE STANDARD AND FITTINGS OF AT LEAST 6 INCHES FOR PIPE SIZES 24 INCHES OR SMALLER. MATERIAL REMOVED SHALL BE REPLACED WITH APPROPRIATE SEWER MANHOLE SPECIFICATIONS. BACKFILL MATERIAL, WHICH SHALL BE COMPACTED TO 95% OF MAXIMUM DRY DENSITY AS DETERMINED BY MODIFIED (ASTM D1557) PROCTOR TEST. ABANDONED SEWER 2. THE CONTRACTOR SHALL CONTACT THE CITY'S PUBLIC WORKS DEPARTMENT (360.403.3500) TO SCHEDULE A PRE-CONSTRUCTION CDF FILL CONFERENCE AFTER PLANS ARE APPROVED AND BEFORE STAKING AND CONSTRUCTION START. THE CONFERENCE SHALL 3. EXISTING SEWER MAINS TO BE ABANDONED SHALL BE FILLED WITH CDF WITHIN 10 FEET OF THE SEWER MAIN AND MANHOLE INTERFACE. SEAL INCLUDE THE CONTRACTOR, REPRESENTATIVES FROM THE PERMIT AGENCIES, OTHER UTILITY COMPANIES, AND CITY STAFF. END OF ABANDONED SEWER MAIN WITH PVC CAP. ARRANGE A MEETING A MINIMUM OF 48 HOURS PRIOR TO COMMENCING CONSTRUCTION. 4. EXISTING SEWER MANHOLE LID AND RISERS TO BE ABANDONED SHALL BE BROKEN DOWN TO A DEPTH OF AT LEAST 2 FEET BELOW FINISHED 3. STAKING SHALL BE PERFORMED BY OR UNDER THE DIRECT SUPERVISION OF THE CONTRACTOR'S LAND SURVEYOR LICENSED IN GRADE AND REMOVED. PUNCH TWO, 2" DIAMETER HOLES COMPLETELY THROUGH THE CONCRETE FLOOR FOR DRAINAGE. FILL THE REMAINING THE STATE OF WASHINGTON. PROVIDE THE CITY WITH TWO (2) BUSINESS DAYS NOTICE TO INSPECT CONSTRUCTION STAKING INTERIOR STRUCTURE WITH GRAVEL BORROW (9-03.14(1)) AND COMPACT TO 95% MAX. DRY DENSITY PER ASTM D-1557, MODIFIED PROCTOR. BEFORE CONSTRUCTION BEGINS. RESTORE SURFACE AND SUBSURFACE TO EXISTING OR BETTER CONDITION TO MATCH THE ADJACENT FEATURES. SEE GENERAL DETAILS FOR VARIOUS SURFACE/SUBSURFACE RESTORATION REQUIREMENTS. 4. THE EXISTING TOPOGRAPHIC AND PHYSICAL FEATURES SHOWN ON THESE PLANS ARE BASED ON A FIELD SURVEY BY METRON AND ASSOCIATES, (SEE SURVEY NOTES), RECORD DRAWINGS, AND FIELD RECONNAISSANCE BY RH2. 5. THE LOCATIONS AND ELEVATIONS OF EXISTING UNDERGROUND UTILITIES SHOWN ON THE PLANS ARE APPROXIMATE. THE CITY SEWER CONSTRUCTION NOTES SEE BELOW FOR SUBSURFACE CONTRACTOR SHALL DETERMINE THE EXACT LOCATION OF ALL EXISTING UTILITIES PRIOR TO COMMENCING WORK TO AVOID UTILITY LEGEND DAMAGE OR DISTURBANCE, AND AGREES TO BE FULLY RESPONSIBLE FOR ANY AND ALL DAMAGES WHICH MIGHT BE CAUSED BY THE CONTRACTOR'S FAILURE TO EXACTLY LOCATE AND PRESERVE ALL UNDERGROUND UTILITIES. IT IS UNDERSTOOD THAT OTHER ABOVE GROUND AND UNDERGROUND FACILITIES NOT SHOWN ON THE PLANS MAY BE ENCOUNTERED DURING THE COURSE 1. ALL WORK SHALL BE IN ACCORDANCE WITH THE APPROVED PLANS, AND CURRENT EDITION OF THE CITY OF ARLINGTON STANDARDS AND OF THE WORK. SPECIFICATIONS. ANY CHANGES TO THE DESIGN REQUIRES CITY APPROVAL. 6. THE CONTRACTOR SHALL PROTECT IN PLACE BUILDINGS, FENCES, APPURTENANCES, ABOVE GROUND UTILITIES, AND OTHER 2. ALL MATERIALS SHALL CONFORM TO THE CITY OF ARLINGTON STANDARDS AND SPECIFICATIONS AND THE MATERIAL SUBMITTALS SHALL BE PROPERTY ADJACENT TO ALL CONSTRUCTION AREAS. THE CONTRACTOR SHALL BE SOLELY RESPONSIBLE FOR REPAIRING ALL APPROVED BY THE CITY BEFORE SCHEDULING THE PRECONSTRUCTION CONFERENCE AND BEFORE THE MATERIALS ARE DELIVERED TO THE JOB DAMAGE CAUSED BY CONSTRUCTION ACTIVITIES. SITE. ONCE THE MATERIALS ARE DELIVERED TO THE JOB SITE THE INSPECTOR WILL DETERMINE IF THE MATERIALS WERE MANUFACTURED TO MEET THE REQUIREMENTS OF THE CITY OF ARLINGTON STANDARDS AND SPECIFICATIONS BEFORE THE MATERIALS CAN BE INSTALLED. 7. IN ACCORDANCE WITH THE DEPARTMENT OF ECOLOGY AIR QUALITY STANDARDS, THE CONTRACTOR SHALL BE RESPONSIBLE FOR CONTROLLING ALL FUGITIVE DUST THAT MAY BE GENERATED BY THE CONSTRUCTION PROJECT. 3. ALL SEWER MAINS AND SIDE SEWER STUBS SHALL BE FIELD STAKED FOR GRADES AND ALIGNMENT BY A SURVEYOR PRIOR TO CONSTRUCTION. THE CONSTRUCTION STAKES MUST SHOW THE STATION AND OFFSET TO THE ALIGNMENT. 8. THE CONTRACTOR SHALL CONTAIN WORK TO WITHIN RIGHT-OF-WAY AND THE CONSTRUCTION LIMITS AS ILLUSTRATED IN THE PLANS. 4. THE CITY OF ARLINGTON WASTEWATER DIVISION SHALL BE NOTIFIED A MINIMUM OF 48 HOURS IN ADVANCE OF A TAP OR CONNECTION TO AN EXISTING SANITARY SEWER MAIN. THE INSPECTOR SHALL BE PRESENT AT THE TIME OF THE TAP OR CONNECTION. 9. SEE TECHNICAL SPECIFICATIONS FOR FURTHER INFORMATION REGARDING PERMITS. 5. GRAVITY SEWERS LARGER THAN 15 INCHES IN DIAMETER SHALL BE PVC ASTM F679 (PS46). GRAVITY SEWERS 15 INCHES IN DIAMETER OR LESS 10. ONSITE TEMPORARY EROSION AND SEDIMENT CONTROL (TESC) MEASURES SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR SHALL BE PVC ASTM D3034 (SDR 35). AND BE IN PLACE PRIOR TO CONSTRUCTION. ANY PROBLEMS OCCURRING BEFORE FINAL ACCEPTANCE BY THE CITY SHALL BE CORRECTED BY THE CONTRACTOR. UPON FINAL ACCEPTANCE BY THE CITY, OR AS OTHERWISE DIRECTED BY THE ENGINEER, THE 6. PRE-CAST MANHOLES SHALL MEET THE REQUIREMENTS OF ASTM C-478. JOINTS SHALL BE RUBBER GASKETED AND GROUTED BOTH INSIDE AND CONTRACTOR SHALL REMOVE ALL TEMPORARY, NON-DEGRADABLE TESC MEASURES. THE STORM DRAIN INLET PROTECTION OUTSIDE OF THE MANHOLE PER CITY OF ARLINGTON STANDARDS AND SPECIFICATIONS. ALL LIFT HOLES CUT THROUGH THE WALLS OF THE DEVICE SHALL BE SILT SACK OR EQUAL. ALL CATCH BASINS WITHIN THE VICINITY OF THE CONSTRUCTION SHALL HAVE INLET MANHOLE SHALL BE GROUTED FROM THE INSIDE AND OUTSIDE OF THE MANHOLE TO BE WATERTIGHT. ADDITIONAL WATERPROOFING MAY BE PROTECTION MEASURES. REQUIRED. 11. ANY REVISIONS TO PLANS MUST BE MADE BY THE ENGINEER AND APPROVED BY THE CITY PRIOR TO ANY IMPLEMENTATION IN THE 7. SIDE SEWER SERVICES SHALL BE PVC ASTM D3034 (SDR 35) WITH FLEXIBLE GASKETED JOINTS. SIDE SEWER CONNECTIONS SHALL BE MADE BY A FIELD. TAP TO AN EXISTING MAIN OR A TEE FROM A NEW MAIN CONNECTED ABOVE THE SPRING LINE OF THE PIPE. WYES ARE NOT ALLOWED ON LINES 8" OR LARGER. SIDE SEWERS CAN NOT BE INSTALLED UNDER DRIVEWAYS UNLESS APPROVED BY THE CITY INSPECTOR. 12. ALL PAVEMENT MARKINGS, SIGNING AND TRAFFIC CONTROL AS REQUIRED BY THE CONSTRUCTION SHALL CONFORM TO THE REQUIREMENTS OF THE MUTCD. 8. ALL SEWER PIPE SHALL BE INSTALLED WITH A CONTINUOUS TRACER TAPE 18" ABOVE THE PROPOSED SEWER PIPE, OR AS DIRECTED BY THE CITY INSPECTOR. THE MARKER SHALL BE PLASTIC, NON-BIODEGRADABLE, METAL CORE, AND DETECTABLE, WITH BACKING MARKED "SEWER". 13. A COPY OF THE APPROVED PLANS MUST BE ON THE JOB SITE WHENEVER CONSTRUCTION IS IN PROGRESS. 9. SIDE SEWERS SHALL BE INSTALLED BY THE CONTRACTOR AND COORDINATED FOR CLEARANCE WITH POWER, GAS, TELEPHONE, CABLE, AND 14. WHERE NEWLY CONSTRUCTED PAVING MEETS EXISTING PAVING, THE CONTRACTOR SHALL SAW CUT TO PROVIDE A SMOOTH OTHER UTILITIES. SIDE SEWERS SHALL BE A MINIMUM OF 10 FEET BEYOND PROPERTY LINES AND 5' BEYOND ANY EASEMENT. TRANSITION FROM EXISTING TO PROPOSED PAVING. APPLICATION OF A THIN TACK COAT OF EMULSIFIED ASPHALT SHALL BE APPLIED TO INSURE PROPER BONDING. 10. THE SEWER PIPE SHALL BE INSTALLED STARTING FROM DOWNSTREAM OF THE POINT OF CONNECTION ON THE EXISTING SEWER OR FROM A DESIGNATED STARTING POINT. THE SEWER PIPE SHALL BE INSTALLED WITH THE BELL END UPSTREAM. 15. THE COMPLETED SURFACE OF ALL COURSES SHALL BE OF UNIFORM TEXTURE, SMOOTH, UNIFORM AS TO CROWN AND GRADE, AND FREE FROM DEFECTS OF ALL KINDS. THE COMPLETED SURFACE OF THE WEARING COURSE SHALL NOT VARY MORE THAN 1/8 11. ADEQUATE TRENCH SHEETING AND/OR SHORING SHALL BE PROVIDED BY THE CONTRACTOR AS REQUIRED BY OSHA AND WISHA. INCH FROM THE LOWER EDGE OF A 10-FOOT STRAIGHTEDGE PLACED ON THE SURFACE PARALLEL TO THE CENTERLINE. THE TRANSVERSE SLOPE OF THE COMPLETED SURFACE OF THE WEARING COURSE SHALL VARY NOT MORE THAN 1/4 INCH IN 10- FEET 12. TO PREVENT WATER OR DEBRIS FROM DISCHARGING INTO THE CITY'S EXISTING SEWER SYSTEM, THE CONTRACTOR SHALL INSTALL A PLUG IN FROM THE RATE OF TRANSVERSE SLOPE SHOWN ON THE PLANS. THE CONNECTION MANHOLE OR AS DIRECTED BY THE CITY INSPECTOR. THE PLUG SHALL NOT BE REMOVED UNTIL THE SEWER IS ACCEPTED BY THE CITY. 16. MATERIALS SAMPLING AND TESTING SHALL BE AT A FREQUENCY AND MAGNITUDE AS SPECIFIED IN THE TECHNICAL SPECIFICATIONS OR DETERMINED BY THE ENGINEER. A PRIVATE AND INDEPENDENT TESTING LABORATORY SHALL PERFORM 13. ALL SEWER LINES SHALL MAINTAIN A MINIMUM OF 10 FEET HORIZONTAL CLEARANCE AND A MINIMUM OF 18 INCHES VERTICAL CLEARANCE FROM TESTING AND SAMPLING. CERTIFIED TEST REPORTS SHALL BE FURNISHED FOR ALL TESTS PERFORMED BY PRIVATE TESTING WATER LINES. SEE STANDARDS AND SPECIFICATIONS FOR ADDITIONAL REQUIREMENTS AND ALTERNATIVES. LABORATORIES. THE CITY WILL BE RESPONSIBLE FOR ACCEPTANCE TESTING. IF TESTS FAIL, RETESTS SHALL BE PAID FOR BY THE CONTRACTOR. 14. PIPE BEDDING SHALL BE IN ACCORDANCE WITH THE CITY OF ARLINGTON STANDARD AND WSDOT STANDARD SPECIFICATIONS. 3/8-INCH MINUS MANUFACTURED CLEAN PEA GRAVEL IS THE REQUIRED BEDDING MATERIAL. ALL PIPE SHALL BE LAID ON A PROPERLY PREPARED FOUNDATION. THIS SHALL INCLUDE NECESSARY LEVELING OF THE TRENCH BOTTOM OR THE TOP OF THE FOUNDATION MATERIALS AS WELL AS PLACEMENT AND COMPACTION OF REQUIRED BEDDING MATERIAL TO UNIFORM GRADE SO THAT THE ENTIRE LENGTH OF THE PIPE WILL BE SUPPORTED BY A SUBSURFACE UTILITY LEGEND SURVEY NOTES UNIFORMLY DENSE UNYIELDING BASE. 15. THE CONTRACTOR SHALL COMPACT TRENCH BACKFILL WITHIN THE CITY RIGHT-OF-WAY TO AT LEAST 90% MAXIMUM DRY DENSITY FROM THE THE CLASSIFICATIONS FOR SUBSURFACE UTILITIES ARE OUTLINED AND EXPLAINED IN THE FOLLOWING LIST: DATA FOR THIS SURVEY HAS BEEN GATHERED THROUGH FIELD OBSERVATIONS BY METRON AND BOTTOM OF THE TRENCH TO A DEPTH OF 3' BELOW THE SURFACE. THE TRENCH BACKFILL MUST BE COMPACTED TO AT LEAST 95% MAXIMUM ASSOCIATES AND THE CITY OF ARLINGTON. DENSITY WITHIN 3' OF THE SURFACE. MAXIMUM DENSITY AS DETERMINED BY MODIFIED PROCTOR TEST (ATSM-1557). ASPHALT MUST BE UTILITY QUALITY LEVEL A. - PRECISE HORIZONTAL AND VERTICAL LOCATION OF UTILITIES OBTAINED BY THE ACTUAL EXPOSURE OF (OR COMPACTED TO MEET THE REQUIREMENTS OF THE CITY OF ARLINGTON. THE INITIAL COMPACTION TEST SHALL BE FUNDED BY THE CITY; VERIFICATION OF PREVIOUSLY EXPOSED AND SURVEYED UTILITIES) AND SUBSEQUENT MEASUREMENT OF HORIZONTAL DATUM: FURTHER COMPACTION TESTS SHALL BE PAID FOR BY THE CONTRACTOR. WASHINGTON NORTH ZONE SPC NORTH AMERICAN DATUM 1983/2011 GEODETIC PROJECTION SUBSURFACE UTILITIES, USUALLY AT A SPECIFIC POINT. UNLESS OTHERWISE NOTED, QUALITY LEVEL A IS POTHOLE LOCATION ONLY APPLICABLE AT POTHOLED LOCATIONS ON THE PLANS. AT ALL OTHER AREAS, THE UTILITY SHOULD BE VERTICAL DATUM: ASSUMED TO BE QUALITY LEVEL B. SECTION AND DETAIL REFERENCES NAVD 88 (MEAN SEA LEVEL) UTILITY QUALITY LEVEL B. - INFORMATION OBTAINED THROUGH THE APPLICATION OF APPROPRIATE SURFACE GEOPHYSICAL METHODS UNDERGROUND UTILITY NOTE: TO DETERMINE THE EXISTENCE AND APPROXIMATE HORIZONTAL POSITION OF SUBSURFACE UTILITIES. UNDERGROUND UTILITY LOCATIONS FOR SEWER, WATER, ELECTRIC SERVICE, COMMUNICATION THE FOLLOWING CONVENTIONS HAVE BEEN USED WITHIN THESE DRAWINGS TO REFER THE READER BETWEEN THE SECTION/DETAIL AND THE PLAN SERVICES AND GAS, AS SHOWN HEREON, ARE BASED UPON THE CITY OF ARLINGTON UTILITY FROM WHICH IT IS REFERENCED. UTILITY QUALITY LEVEL C. - INFORMATION OBTAINED BY SURVEYING AND PLOTTING VISIBLE ABOVE-GROUND UTILITY FEATURES LOCATES AND "CALL BEFORE YOU DIG" UTILITY LOCATE SERVICE ALL PROVIDED BY CITY OF REFERENCE BUBBLES ARLINGTON. THE USE OF THIS MAP FOR THE PRECISE LOCATION OF THE UTILITY LINES IS NOT UTILITY QUALITY LEVEL D. - INFORMATION DERIVED FROM EXISTING RECORDS OR ORAL RECOLLECTIONS WARRANTED OR GUARANTEED. X PLAN REFERENCE BUBBLE - REFERS READER BACK TO THE PLAN FROM WHICH THE DETAIL OR SECTION ORIGINATED. RCW 19.122 REQUIRES 48 HOUR NOTIFICATION PRIOR TO UNDERGROUND CONSTRUCTION DETAIL/SECTION REFERENCE BUBBLE - REFERS READER TO THE DRAWING ON WHICH THE DETAIL OR SECTION IS LOCATED. NOTE: THE USE OF THE LINE TYPES PROVIDED ABOVE WAS A PRIMARY METHOD FOR INDICATING THE ACCURACY OF THE UTILITIES SHOWN WITHIN ACTIVITY. CONTACT "CALL BEFORE YOU DIG" UTILITY LOCATE SERVICE AT 811 OR 1-800-424-5555. X THESE PLANS. WHEN THE SOURCE OF THE INFORMATION WAS UNKNOWN OR THE METHOD FOR LOCATING THE UTILITIES WAS WHERE, ID = SECTION/DETAIL REFERENCE NUMBER UNAVAILABLE, QUALITY LEVEL D WAS USED AS THE DEFAULT. ## = DRAWING NUMBER ON WHICH DETAIL ORIGINATED OR RESIDES. | ||||
|---|---|---|---|---|
| ROTPECRETNI NOTGNILRA REWES FO EVA YTIC HT76 N F O O Y T I C R A | DNA ,DNEGEL I ESAHP LORTNOC - GNIZISPU ,SETON YEVRUS LARENEG T G N I L | |||
| 2900-22 :.ON BOJ | GWD.10NEG-D-HT76 SNOISIVER :EMANELIF 4202 ,52 luJ :ETAD TOLP BWD :DEWEIVER | WEIVER | ||
| YB | ||||
| NOITPIRCSED | ||||
| LRA :TNEILC | ||||
| 4202 ,52 luJ :ETAD EVAS | ||||
| ETAD | ||||
| BMB :REENIGNE | ||||
| .ON | ||||
| SCALE:SHOWN 0" 1" 2" DRAWING IS FULL SCALE WHEN BAR MEASURES 2" | ||||
| DWG NO.: G01 | SHEET NO.: 1 12 |
| LEGEND | ||
|---|---|---|
| GENERAL NOTES | ||
|---|---|---|
| SEWER GENERAL NOTES | ||
|---|---|---|
| EXISTING LEGEND PROPOSED LEGEND SEWER PIPE SEWER MANHOLE ABANDONED SEWER CDF FILL SEE BELOW FOR SUBSURFACE UTILITY LEGEND | ||
|---|---|---|
| 1. ALL WORKMANSHIP, CONSTRUCTION AND MATERIALS SHALL BE PERFORMED OR SUPPLIED IN ACCORDANCE WITH THESE SPECIAL PROVISIONS, PLANS, CITY OF ARLINGTON (CITY) STANDARD DETAILS, AND THE WSDOT STANDARD SPECIFICATIONS FOR ROAD, BRIDGE, AND MUNICIPAL CONSTRUCTION, 2023 EDITION, AS ISSUED BY THE WASHINGTON STATE DEPARTMENT OF TRANSPORTATION AND THE AMERICAN PUBLIC WORKS ASSOCIATION, WHICH IS HEREINAFTER REFERRED TO AS THE STANDARD SPECIFICATIONS. 2. THE CONTRACTOR SHALL CONTACT THE CITY'S PUBLIC WORKS DEPARTMENT (360.403.3500) TO SCHEDULE A PRE-CONSTRUCTION CONFERENCE AFTER PLANS ARE APPROVED AND BEFORE STAKING AND CONSTRUCTION START. THE CONFERENCE SHALL INCLUDE THE CONTRACTOR, REPRESENTATIVES FROM THE PERMIT AGENCIES, OTHER UTILITY COMPANIES, AND CITY STAFF. ARRANGE A MEETING A MINIMUM OF 48 HOURS PRIOR TO COMMENCING CONSTRUCTION. 3. STAKING SHALL BE PERFORMED BY OR UNDER THE DIRECT SUPERVISION OF THE CONTRACTOR'S LAND SURVEYOR LICENSED IN THE STATE OF WASHINGTON. PROVIDE THE CITY WITH TWO (2) BUSINESS DAYS NOTICE TO INSPECT CONSTRUCTION STAKING BEFORE CONSTRUCTION BEGINS. 4. THE EXISTING TOPOGRAPHIC AND PHYSICAL FEATURES SHOWN ON THESE PLANS ARE BASED ON A FIELD SURVEY BY METRON AND ASSOCIATES, (SEE SURVEY NOTES), RECORD DRAWINGS, AND FIELD RECONNAISSANCE BY RH2. 5. THE LOCATIONS AND ELEVATIONS OF EXISTING UNDERGROUND UTILITIES SHOWN ON THE PLANS ARE APPROXIMATE. THE CONTRACTOR SHALL DETERMINE THE EXACT LOCATION OF ALL EXISTING UTILITIES PRIOR TO COMMENCING WORK TO AVOID DAMAGE OR DISTURBANCE, AND AGREES TO BE FULLY RESPONSIBLE FOR ANY AND ALL DAMAGES WHICH MIGHT BE CAUSED BY THE CONTRACTOR'S FAILURE TO EXACTLY LOCATE AND PRESERVE ALL UNDERGROUND UTILITIES. IT IS UNDERSTOOD THAT OTHER ABOVE GROUND AND UNDERGROUND FACILITIES NOT SHOWN ON THE PLANS MAY BE ENCOUNTERED DURING THE COURSE OF THE WORK. 6. THE CONTRACTOR SHALL PROTECT IN PLACE BUILDINGS, FENCES, APPURTENANCES, ABOVE GROUND UTILITIES, AND OTHER PROPERTY ADJACENT TO ALL CONSTRUCTION AREAS. THE CONTRACTOR SHALL BE SOLELY RESPONSIBLE FOR REPAIRING ALL DAMAGE CAUSED BY CONSTRUCTION ACTIVITIES. 7. IN ACCORDANCE WITH THE DEPARTMENT OF ECOLOGY AIR QUALITY STANDARDS, THE CONTRACTOR SHALL BE RESPONSIBLE FOR CONTROLLING ALL FUGITIVE DUST THAT MAY BE GENERATED BY THE CONSTRUCTION PROJECT. 8. THE CONTRACTOR SHALL CONTAIN WORK TO WITHIN RIGHT-OF-WAY AND THE CONSTRUCTION LIMITS AS ILLUSTRATED IN THE PLANS. 9. SEE TECHNICAL SPECIFICATIONS FOR FURTHER INFORMATION REGARDING PERMITS. 10. ONSITE TEMPORARY EROSION AND SEDIMENT CONTROL (TESC) MEASURES SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR AND BE IN PLACE PRIOR TO CONSTRUCTION. ANY PROBLEMS OCCURRING BEFORE FINAL ACCEPTANCE BY THE CITY SHALL BE CORRECTED BY THE CONTRACTOR. UPON FINAL ACCEPTANCE BY THE CITY, OR AS OTHERWISE DIRECTED BY THE ENGINEER, THE CONTRACTOR SHALL REMOVE ALL TEMPORARY, NON-DEGRADABLE TESC MEASURES. THE STORM DRAIN INLET PROTECTION DEVICE SHALL BE SILT SACK OR EQUAL. ALL CATCH BASINS WITHIN THE VICINITY OF THE CONSTRUCTION SHALL HAVE INLET PROTECTION MEASURES. 11. ANY REVISIONS TO PLANS MUST BE MADE BY THE ENGINEER AND APPROVED BY THE CITY PRIOR TO ANY IMPLEMENTATION IN THE FIELD. 12. ALL PAVEMENT MARKINGS, SIGNING AND TRAFFIC CONTROL AS REQUIRED BY THE CONSTRUCTION SHALL CONFORM TO THE REQUIREMENTS OF THE MUTCD. 13. A COPY OF THE APPROVED PLANS MUST BE ON THE JOB SITE WHENEVER CONSTRUCTION IS IN PROGRESS. 14. WHERE NEWLY CONSTRUCTED PAVING MEETS EXISTING PAVING, THE CONTRACTOR SHALL SAW CUT TO PROVIDE A SMOOTH TRANSITION FROM EXISTING TO PROPOSED PAVING. APPLICATION OF A THIN TACK COAT OF EMULSIFIED ASPHALT SHALL BE APPLIED TO INSURE PROPER BONDING. 15. THE COMPLETED SURFACE OF ALL COURSES SHALL BE OF UNIFORM TEXTURE, SMOOTH, UNIFORM AS TO CROWN AND GRADE, AND FREE FROM DEFECTS OF ALL KINDS. THE COMPLETED SURFACE OF THE WEARING COURSE SHALL NOT VARY MORE THAN 1/8 INCH FROM THE LOWER EDGE OF A 10-FOOT STRAIGHTEDGE PLACED ON THE SURFACE PARALLEL TO THE CENTERLINE. THE TRANSVERSE SLOPE OF THE COMPLETED SURFACE OF THE WEARING COURSE SHALL VARY NOT MORE THAN 1/4 INCH IN 10- FEET FROM THE RATE OF TRANSVERSE SLOPE SHOWN ON THE PLANS. 16. MATERIALS SAMPLING AND TESTING SHALL BE AT A FREQUENCY AND MAGNITUDE AS SPECIFIED IN THE TECHNICAL SPECIFICATIONS OR DETERMINED BY THE ENGINEER. A PRIVATE AND INDEPENDENT TESTING LABORATORY SHALL PERFORM TESTING AND SAMPLING. CERTIFIED TEST REPORTS SHALL BE FURNISHED FOR ALL TESTS PERFORMED BY PRIVATE TESTING LABORATORIES. THE CITY WILL BE RESPONSIBLE FOR ACCEPTANCE TESTING. IF TESTS FAIL, RETESTS SHALL BE PAID FOR BY THE CONTRACTOR. | ||
|---|---|---|
| 1. SEE SPECIFICATION APPENDICES FOR CITY SEWER GENERAL NOTES (CH. 5). SEE DWG NO. D01 FOR CITY STANDARD DETAILS. 2. WHEN EXCAVATION OF ROCK IS ENCOUNTERED, ALL ROCK SHALL BE REMOVED TO PROVIDE A CLEARANCE BELOW, ON EACH SIDE OF ALL PIPE, AND FITTINGS OF AT LEAST 6 INCHES FOR PIPE SIZES 24 INCHES OR SMALLER. MATERIAL REMOVED SHALL BE REPLACED WITH APPROPRIATE BACKFILL MATERIAL, WHICH SHALL BE COMPACTED TO 95% OF MAXIMUM DRY DENSITY AS DETERMINED BY MODIFIED (ASTM D1557) PROCTOR TEST. 3. EXISTING SEWER MAINS TO BE ABANDONED SHALL BE FILLED WITH CDF WITHIN 10 FEET OF THE SEWER MAIN AND MANHOLE INTERFACE. SEAL END OF ABANDONED SEWER MAIN WITH PVC CAP. 4. EXISTING SEWER MANHOLE LID AND RISERS TO BE ABANDONED SHALL BE BROKEN DOWN TO A DEPTH OF AT LEAST 2 FEET BELOW FINISHED GRADE AND REMOVED. PUNCH TWO, 2" DIAMETER HOLES COMPLETELY THROUGH THE CONCRETE FLOOR FOR DRAINAGE. FILL THE REMAINING INTERIOR STRUCTURE WITH GRAVEL BORROW (9-03.14(1)) AND COMPACT TO 95% MAX. DRY DENSITY PER ASTM D-1557, MODIFIED PROCTOR. RESTORE SURFACE AND SUBSURFACE TO EXISTING OR BETTER CONDITION TO MATCH THE ADJACENT FEATURES. SEE GENERAL DETAILS FOR VARIOUS SURFACE/SUBSURFACE RESTORATION REQUIREMENTS. | |
|---|---|
| 1. ALL WORK SHALL BE IN ACCORDANCE WITH THE APPROVED PLANS, AND CURRENT EDITION OF THE CITY OF ARLINGTON STANDARDS AND SPECIFICATIONS. ANY CHANGES TO THE DESIGN REQUIRES CITY APPROVAL. 2. ALL MATERIALS SHALL CONFORM TO THE CITY OF ARLINGTON STANDARDS AND SPECIFICATIONS AND THE MATERIAL SUBMITTALS SHALL BE APPROVED BY THE CITY BEFORE SCHEDULING THE PRECONSTRUCTION CONFERENCE AND BEFORE THE MATERIALS ARE DELIVERED TO THE JOB SITE. ONCE THE MATERIALS ARE DELIVERED TO THE JOB SITE THE INSPECTOR WILL DETERMINE IF THE MATERIALS WERE MANUFACTURED TO MEET THE REQUIREMENTS OF THE CITY OF ARLINGTON STANDARDS AND SPECIFICATIONS BEFORE THE MATERIALS CAN BE INSTALLED. 3. ALL SEWER MAINS AND SIDE SEWER STUBS SHALL BE FIELD STAKED FOR GRADES AND ALIGNMENT BY A SURVEYOR PRIOR TO CONSTRUCTION. THE CONSTRUCTION STAKES MUST SHOW THE STATION AND OFFSET TO THE ALIGNMENT. 4. THE CITY OF ARLINGTON WASTEWATER DIVISION SHALL BE NOTIFIED A MINIMUM OF 48 HOURS IN ADVANCE OF A TAP OR CONNECTION TO AN EXISTING SANITARY SEWER MAIN. THE INSPECTOR SHALL BE PRESENT AT THE TIME OF THE TAP OR CONNECTION. 5. GRAVITY SEWERS LARGER THAN 15 INCHES IN DIAMETER SHALL BE PVC ASTM F679 (PS46). GRAVITY SEWERS 15 INCHES IN DIAMETER OR LESS SHALL BE PVC ASTM D3034 (SDR 35). 6. PRE-CAST MANHOLES SHALL MEET THE REQUIREMENTS OF ASTM C-478. JOINTS SHALL BE RUBBER GASKETED AND GROUTED BOTH INSIDE AND OUTSIDE OF THE MANHOLE PER CITY OF ARLINGTON STANDARDS AND SPECIFICATIONS. ALL LIFT HOLES CUT THROUGH THE WALLS OF THE MANHOLE SHALL BE GROUTED FROM THE INSIDE AND OUTSIDE OF THE MANHOLE TO BE WATERTIGHT. ADDITIONAL WATERPROOFING MAY BE REQUIRED. 7. SIDE SEWER SERVICES SHALL BE PVC ASTM D3034 (SDR 35) WITH FLEXIBLE GASKETED JOINTS. SIDE SEWER CONNECTIONS SHALL BE MADE BY A TAP TO AN EXISTING MAIN OR A TEE FROM A NEW MAIN CONNECTED ABOVE THE SPRING LINE OF THE PIPE. WYES ARE NOT ALLOWED ON LINES 8" OR LARGER. SIDE SEWERS CAN NOT BE INSTALLED UNDER DRIVEWAYS UNLESS APPROVED BY THE CITY INSPECTOR. 8. ALL SEWER PIPE SHALL BE INSTALLED WITH A CONTINUOUS TRACER TAPE 18" ABOVE THE PROPOSED SEWER PIPE, OR AS DIRECTED BY THE CITY INSPECTOR. THE MARKER SHALL BE PLASTIC, NON-BIODEGRADABLE, METAL CORE, AND DETECTABLE, WITH BACKING MARKED "SEWER". 9. SIDE SEWERS SHALL BE INSTALLED BY THE CONTRACTOR AND COORDINATED FOR CLEARANCE WITH POWER, GAS, TELEPHONE, CABLE, AND OTHER UTILITIES. SIDE SEWERS SHALL BE A MINIMUM OF 10 FEET BEYOND PROPERTY LINES AND 5' BEYOND ANY EASEMENT. 10. THE SEWER PIPE SHALL BE INSTALLED STARTING FROM DOWNSTREAM OF THE POINT OF CONNECTION ON THE EXISTING SEWER OR FROM A DESIGNATED STARTING POINT. THE SEWER PIPE SHALL BE INSTALLED WITH THE BELL END UPSTREAM. 11. ADEQUATE TRENCH SHEETING AND/OR SHORING SHALL BE PROVIDED BY THE CONTRACTOR AS REQUIRED BY OSHA AND WISHA. 12. TO PREVENT WATER OR DEBRIS FROM DISCHARGING INTO THE CITY'S EXISTING SEWER SYSTEM, THE CONTRACTOR SHALL INSTALL A PLUG IN THE CONNECTION MANHOLE OR AS DIRECTED BY THE CITY INSPECTOR. THE PLUG SHALL NOT BE REMOVED UNTIL THE SEWER IS ACCEPTED BY THE CITY. 13. ALL SEWER LINES SHALL MAINTAIN A MINIMUM OF 10 FEET HORIZONTAL CLEARANCE AND A MINIMUM OF 18 INCHES VERTICAL CLEARANCE FROM WATER LINES. SEE STANDARDS AND SPECIFICATIONS FOR ADDITIONAL REQUIREMENTS AND ALTERNATIVES. 14. PIPE BEDDING SHALL BE IN ACCORDANCE WITH THE CITY OF ARLINGTON STANDARD AND WSDOT STANDARD SPECIFICATIONS. 3/8-INCH MINUS MANUFACTURED CLEAN PEA GRAVEL IS THE REQUIRED BEDDING MATERIAL. ALL PIPE SHALL BE LAID ON A PROPERLY PREPARED FOUNDATION. THIS SHALL INCLUDE NECESSARY LEVELING OF THE TRENCH BOTTOM OR THE TOP OF THE FOUNDATION MATERIALS AS WELL AS PLACEMENT AND COMPACTION OF REQUIRED BEDDING MATERIAL TO UNIFORM GRADE SO THAT THE ENTIRE LENGTH OF THE PIPE WILL BE SUPPORTED BY A UNIFORMLY DENSE UNYIELDING BASE. 15. THE CONTRACTOR SHALL COMPACT TRENCH BACKFILL WITHIN THE CITY RIGHT-OF-WAY TO AT LEAST 90% MAXIMUM DRY DENSITY FROM THE BOTTOM OF THE TRENCH TO A DEPTH OF 3' BELOW THE SURFACE. THE TRENCH BACKFILL MUST BE COMPACTED TO AT LEAST 95% MAXIMUM DENSITY WITHIN 3' OF THE SURFACE. MAXIMUM DENSITY AS DETERMINED BY MODIFIED PROCTOR TEST (ATSM-1557). ASPHALT MUST BE COMPACTED TO MEET THE REQUIREMENTS OF THE CITY OF ARLINGTON. THE INITIAL COMPACTION TEST SHALL BE FUNDED BY THE CITY; FURTHER COMPACTION TESTS SHALL BE PAID FOR BY THE CONTRACTOR. | ||
|---|---|---|
| SUBSURFACE UTILITY LEGEND | ||
|---|---|---|
| SURVEY NOTES | ||
|---|---|---|
| THE CLASSIFICATIONS FOR SUBSURFACE UTILITIES ARE OUTLINED AND EXPLAINED IN THE FOLLOWING LIST: UTILITY QUALITY LEVEL A. - PRECISE HORIZONTAL AND VERTICAL LOCATION OF UTILITIES OBTAINED BY THE ACTUAL EXPOSURE OF (OR VERIFICATION OF PREVIOUSLY EXPOSED AND SURVEYED UTILITIES) AND SUBSEQUENT MEASUREMENT OF SUBSURFACE UTILITIES, USUALLY AT A SPECIFIC POINT. UNLESS OTHERWISE NOTED, QUALITY LEVEL A IS POTHOLE LOCATION ONLY APPLICABLE AT POTHOLED LOCATIONS ON THE PLANS. AT ALL OTHER AREAS, THE UTILITY SHOULD BE ASSUMED TO BE QUALITY LEVEL B. UTILITY QUALITY LEVEL B. - INFORMATION OBTAINED THROUGH THE APPLICATION OF APPROPRIATE SURFACE GEOPHYSICAL METHODS TO DETERMINE THE EXISTENCE AND APPROXIMATE HORIZONTAL POSITION OF SUBSURFACE UTILITIES. UTILITY QUALITY LEVEL C. - INFORMATION OBTAINED BY SURVEYING AND PLOTTING VISIBLE ABOVE-GROUND UTILITY FEATURES UTILITY QUALITY LEVEL D. - INFORMATION DERIVED FROM EXISTING RECORDS OR ORAL RECOLLECTIONS NOTE: THE USE OF THE LINE TYPES PROVIDED ABOVE WAS A PRIMARY METHOD FOR INDICATING THE ACCURACY OF THE UTILITIES SHOWN WITHIN THESE PLANS. WHEN THE SOURCE OF THE INFORMATION WAS UNKNOWN OR THE METHOD FOR LOCATING THE UTILITIES WAS UNAVAILABLE, QUALITY LEVEL D WAS USED AS THE DEFAULT. | ||
|---|---|---|
| DATA FOR THIS SURVEY HAS BEEN GATHERED THROUGH FIELD OBSERVATIONS BY METRON AND ASSOCIATES AND THE CITY OF ARLINGTON. HORIZONTAL DATUM: WASHINGTON NORTH ZONE SPC NORTH AMERICAN DATUM 1983/2011 GEODETIC PROJECTION VERTICAL DATUM: NAVD 88 (MEAN SEA LEVEL) UNDERGROUND UTILITY NOTE: UNDERGROUND UTILITY LOCATIONS FOR SEWER, WATER, ELECTRIC SERVICE, COMMUNICATION SERVICES AND GAS, AS SHOWN HEREON, ARE BASED UPON THE CITY OF ARLINGTON UTILITY LOCATES AND "CALL BEFORE YOU DIG" UTILITY LOCATE SERVICE ALL PROVIDED BY CITY OF ARLINGTON. THE USE OF THIS MAP FOR THE PRECISE LOCATION OF THE UTILITY LINES IS NOT WARRANTED OR GUARANTEED. RCW 19.122 REQUIRES 48 HOUR NOTIFICATION PRIOR TO UNDERGROUND CONSTRUCTION ACTIVITY. CONTACT "CALL BEFORE YOU DIG" UTILITY LOCATE SERVICE AT 811 OR 1-800-424-5555. | ||
|---|---|---|
| SECTION AND DETAIL REFERENCES | ||
|---|---|---|
| THE FOLLOWING CONVENTIONS HAVE BEEN USED WITHIN THESE DRAWINGS TO REFER THE READER BETWEEN THE SECTION/DETAIL AND THE PLAN FROM WHICH IT IS REFERENCED. REFERENCE BUBBLES X PLAN REFERENCE BUBBLE - REFERS READER BACK TO THE PLAN FROM WHICH THE DETAIL OR SECTION ORIGINATED. DETAIL/SECTION REFERENCE BUBBLE - REFERS READER TO THE DRAWING ON WHICH THE DETAIL OR SECTION IS LOCATED. X WHERE, ID = SECTION/DETAIL REFERENCE NUMBER ## = DRAWING NUMBER ON WHICH DETAIL ORIGINATED OR RESIDES. | ||
|---|---|---|
SEWER PIPE
SEWER MANHOLE
ABANDONED SEWER
CDF FILL
2900-22
LRA
4202
,52
luJ
BMB
GWD.10NEG-D-HT76
4202
,52
luJ
BWD
SHOWN
DWG NO.:
G01 1
12
:TNEILC
:ETAD
EVAS
:REENIGNE
:EMANELIF
:ETAD
TOLP
:DEWEIVER
SNOISIVER
WEIVER
YB
NOITPIRCSED
ETAD
SHEET NO.:
:.ON
BOJ
.ON
SCALE:
0" 1" 2"
DRAWING IS FULL SCALE WHEN
BAR MEASURES 2"
DNA
,DNEGEL
,SETON
LARENEG
LORTNOC
YEVRUS
N F O
O T
G
Y N
T I
I L
C R
A
NOTGNILRA
FO
YTIC
ROTPECRETNI
REWES
EVA
HT76
I
ESAHP
-
GNIZISPU
LEGEND GENERAL NOTES SEWER GENERAL NOTES
EXISTING LEGEND PROPOSED LEGEND
1. ALL WORKMANSHIP, CONSTRUCTION AND MATERIALS SHALL BE PERFORMED OR SUPPLIED IN ACCORDANCE WITH THESE SPECIAL 1. SEE SPECIFICATION APPENDICES FOR CITY SEWER GENERAL NOTES (CH. 5). SEE DWG NO. D01 FOR CITY STANDARD DETAILS.
PROVISIONS, PLANS, CITY OF ARLINGTON (CITY) STANDARD DETAILS, AND THE WSDOT STANDARD SPECIFICATIONS FOR ROAD,
BRIDGE, AND MUNICIPAL CONSTRUCTION, 2023 EDITION, AS ISSUED BY THE WASHINGTON STATE DEPARTMENT OF 2. WHEN EXCAVATION OF ROCK IS ENCOUNTERED, ALL ROCK SHALL BE REMOVED TO PROVIDE A CLEARANCE BELOW, ON EACH SIDE OF ALL PIPE,
TRANSPORTATION AND THE AMERICAN PUBLIC WORKS ASSOCIATION, WHICH IS HEREINAFTER REFERRED TO AS THE STANDARD AND FITTINGS OF AT LEAST 6 INCHES FOR PIPE SIZES 24 INCHES OR SMALLER. MATERIAL REMOVED SHALL BE REPLACED WITH APPROPRIATE
SPECIFICATIONS. BACKFILL MATERIAL, WHICH SHALL BE COMPACTED TO 95% OF MAXIMUM DRY DENSITY AS DETERMINED BY MODIFIED (ASTM D1557) PROCTOR
TEST.
2. THE CONTRACTOR SHALL CONTACT THE CITY'S PUBLIC WORKS DEPARTMENT (360.403.3500) TO SCHEDULE A PRE-CONSTRUCTION
CONFERENCE AFTER PLANS ARE APPROVED AND BEFORE STAKING AND CONSTRUCTION START. THE CONFERENCE SHALL 3. EXISTING SEWER MAINS TO BE ABANDONED SHALL BE FILLED WITH CDF WITHIN 10 FEET OF THE SEWER MAIN AND MANHOLE INTERFACE. SEAL
INCLUDE THE CONTRACTOR, REPRESENTATIVES FROM THE PERMIT AGENCIES, OTHER UTILITY COMPANIES, AND CITY STAFF. END OF ABANDONED SEWER MAIN WITH PVC CAP.
ARRANGE A MEETING A MINIMUM OF 48 HOURS PRIOR TO COMMENCING CONSTRUCTION.
4. EXISTING SEWER MANHOLE LID AND RISERS TO BE ABANDONED SHALL BE BROKEN DOWN TO A DEPTH OF AT LEAST 2 FEET BELOW FINISHED
3. STAKING SHALL BE PERFORMED BY OR UNDER THE DIRECT SUPERVISION OF THE CONTRACTOR'S LAND SURVEYOR LICENSED IN GRADE AND REMOVED. PUNCH TWO, 2" DIAMETER HOLES COMPLETELY THROUGH THE CONCRETE FLOOR FOR DRAINAGE. FILL THE REMAINING
THE STATE OF WASHINGTON. PROVIDE THE CITY WITH TWO (2) BUSINESS DAYS NOTICE TO INSPECT CONSTRUCTION STAKING INTERIOR STRUCTURE WITH GRAVEL BORROW (9-03.14(1)) AND COMPACT TO 95% MAX. DRY DENSITY PER ASTM D-1557, MODIFIED PROCTOR.
BEFORE CONSTRUCTION BEGINS. RESTORE SURFACE AND SUBSURFACE TO EXISTING OR BETTER CONDITION TO MATCH THE ADJACENT FEATURES. SEE GENERAL DETAILS FOR
VARIOUS SURFACE/SUBSURFACE RESTORATION REQUIREMENTS.
4. THE EXISTING TOPOGRAPHIC AND PHYSICAL FEATURES SHOWN ON THESE PLANS ARE BASED ON A FIELD SURVEY BY METRON
AND ASSOCIATES, (SEE SURVEY NOTES), RECORD DRAWINGS, AND FIELD RECONNAISSANCE BY RH2.
5. THE LOCATIONS AND ELEVATIONS OF EXISTING UNDERGROUND UTILITIES SHOWN ON THE PLANS ARE APPROXIMATE. THE
CITY SEWER CONSTRUCTION NOTES
SEE BELOW FOR SUBSURFACE CONTRACTOR SHALL DETERMINE THE EXACT LOCATION OF ALL EXISTING UTILITIES PRIOR TO COMMENCING WORK TO AVOID
UTILITY LEGEND DAMAGE OR DISTURBANCE, AND AGREES TO BE FULLY RESPONSIBLE FOR ANY AND ALL DAMAGES WHICH MIGHT BE CAUSED BY
THE CONTRACTOR'S FAILURE TO EXACTLY LOCATE AND PRESERVE ALL UNDERGROUND UTILITIES. IT IS UNDERSTOOD THAT
OTHER ABOVE GROUND AND UNDERGROUND FACILITIES NOT SHOWN ON THE PLANS MAY BE ENCOUNTERED DURING THE COURSE 1. ALL WORK SHALL BE IN ACCORDANCE WITH THE APPROVED PLANS, AND CURRENT EDITION OF THE CITY OF ARLINGTON STANDARDS AND
OF THE WORK. SPECIFICATIONS. ANY CHANGES TO THE DESIGN REQUIRES CITY APPROVAL.
6. THE CONTRACTOR SHALL PROTECT IN PLACE BUILDINGS, FENCES, APPURTENANCES, ABOVE GROUND UTILITIES, AND OTHER 2. ALL MATERIALS SHALL CONFORM TO THE CITY OF ARLINGTON STANDARDS AND SPECIFICATIONS AND THE MATERIAL SUBMITTALS SHALL BE
PROPERTY ADJACENT TO ALL CONSTRUCTION AREAS. THE CONTRACTOR SHALL BE SOLELY RESPONSIBLE FOR REPAIRING ALL APPROVED BY THE CITY BEFORE SCHEDULING THE PRECONSTRUCTION CONFERENCE AND BEFORE THE MATERIALS ARE DELIVERED TO THE JOB
DAMAGE CAUSED BY CONSTRUCTION ACTIVITIES. SITE. ONCE THE MATERIALS ARE DELIVERED TO THE JOB SITE THE INSPECTOR WILL DETERMINE IF THE MATERIALS WERE MANUFACTURED TO
MEET THE REQUIREMENTS OF THE CITY OF ARLINGTON STANDARDS AND SPECIFICATIONS BEFORE THE MATERIALS CAN BE INSTALLED.
7. IN ACCORDANCE WITH THE DEPARTMENT OF ECOLOGY AIR QUALITY STANDARDS, THE CONTRACTOR SHALL BE RESPONSIBLE FOR
CONTROLLING ALL FUGITIVE DUST THAT MAY BE GENERATED BY THE CONSTRUCTION PROJECT. 3. ALL SEWER MAINS AND SIDE SEWER STUBS SHALL BE FIELD STAKED FOR GRADES AND ALIGNMENT BY A SURVEYOR PRIOR TO CONSTRUCTION.
THE CONSTRUCTION STAKES MUST SHOW THE STATION AND OFFSET TO THE ALIGNMENT.
8. THE CONTRACTOR SHALL CONTAIN WORK TO WITHIN RIGHT-OF-WAY AND THE CONSTRUCTION LIMITS AS ILLUSTRATED IN THE
PLANS. 4. THE CITY OF ARLINGTON WASTEWATER DIVISION SHALL BE NOTIFIED A MINIMUM OF 48 HOURS IN ADVANCE OF A TAP OR CONNECTION TO AN
EXISTING SANITARY SEWER MAIN. THE INSPECTOR SHALL BE PRESENT AT THE TIME OF THE TAP OR CONNECTION.
9. SEE TECHNICAL SPECIFICATIONS FOR FURTHER INFORMATION REGARDING PERMITS.
5. GRAVITY SEWERS LARGER THAN 15 INCHES IN DIAMETER SHALL BE PVC ASTM F679 (PS46). GRAVITY SEWERS 15 INCHES IN DIAMETER OR LESS
10. ONSITE TEMPORARY EROSION AND SEDIMENT CONTROL (TESC) MEASURES SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR SHALL BE PVC ASTM D3034 (SDR 35).
AND BE IN PLACE PRIOR TO CONSTRUCTION. ANY PROBLEMS OCCURRING BEFORE FINAL ACCEPTANCE BY THE CITY SHALL BE
CORRECTED BY THE CONTRACTOR. UPON FINAL ACCEPTANCE BY THE CITY, OR AS OTHERWISE DIRECTED BY THE ENGINEER, THE 6. PRE-CAST MANHOLES SHALL MEET THE REQUIREMENTS OF ASTM C-478. JOINTS SHALL BE RUBBER GASKETED AND GROUTED BOTH INSIDE AND
CONTRACTOR SHALL REMOVE ALL TEMPORARY, NON-DEGRADABLE TESC MEASURES. THE STORM DRAIN INLET PROTECTION OUTSIDE OF THE MANHOLE PER CITY OF ARLINGTON STANDARDS AND SPECIFICATIONS. ALL LIFT HOLES CUT THROUGH THE WALLS OF THE
DEVICE SHALL BE SILT SACK OR EQUAL. ALL CATCH BASINS WITHIN THE VICINITY OF THE CONSTRUCTION SHALL HAVE INLET MANHOLE SHALL BE GROUTED FROM THE INSIDE AND OUTSIDE OF THE MANHOLE TO BE WATERTIGHT. ADDITIONAL WATERPROOFING MAY BE
PROTECTION MEASURES. REQUIRED.
11. ANY REVISIONS TO PLANS MUST BE MADE BY THE ENGINEER AND APPROVED BY THE CITY PRIOR TO ANY IMPLEMENTATION IN THE 7. SIDE SEWER SERVICES SHALL BE PVC ASTM D3034 (SDR 35) WITH FLEXIBLE GASKETED JOINTS. SIDE SEWER CONNECTIONS SHALL BE MADE BY A
FIELD. TAP TO AN EXISTING MAIN OR A TEE FROM A NEW MAIN CONNECTED ABOVE THE SPRING LINE OF THE PIPE. WYES ARE NOT ALLOWED ON LINES 8"
OR LARGER. SIDE SEWERS CAN NOT BE INSTALLED UNDER DRIVEWAYS UNLESS APPROVED BY THE CITY INSPECTOR.
12. ALL PAVEMENT MARKINGS, SIGNING AND TRAFFIC CONTROL AS REQUIRED BY THE CONSTRUCTION SHALL CONFORM TO THE
REQUIREMENTS OF THE MUTCD. 8. ALL SEWER PIPE SHALL BE INSTALLED WITH A CONTINUOUS TRACER TAPE 18" ABOVE THE PROPOSED SEWER PIPE, OR AS DIRECTED BY THE
CITY INSPECTOR. THE MARKER SHALL BE PLASTIC, NON-BIODEGRADABLE, METAL CORE, AND DETECTABLE, WITH BACKING MARKED "SEWER".
13. A COPY OF THE APPROVED PLANS MUST BE ON THE JOB SITE WHENEVER CONSTRUCTION IS IN PROGRESS.
9. SIDE SEWERS SHALL BE INSTALLED BY THE CONTRACTOR AND COORDINATED FOR CLEARANCE WITH POWER, GAS, TELEPHONE, CABLE, AND
14. WHERE NEWLY CONSTRUCTED PAVING MEETS EXISTING PAVING, THE CONTRACTOR SHALL SAW CUT TO PROVIDE A SMOOTH OTHER UTILITIES. SIDE SEWERS SHALL BE A MINIMUM OF 10 FEET BEYOND PROPERTY LINES AND 5' BEYOND ANY EASEMENT.
TRANSITION FROM EXISTING TO PROPOSED PAVING. APPLICATION OF A THIN TACK COAT OF EMULSIFIED ASPHALT SHALL BE
APPLIED TO INSURE PROPER BONDING. 10. THE SEWER PIPE SHALL BE INSTALLED STARTING FROM DOWNSTREAM OF THE POINT OF CONNECTION ON THE EXISTING SEWER OR FROM A
DESIGNATED STARTING POINT. THE SEWER PIPE SHALL BE INSTALLED WITH THE BELL END UPSTREAM.
15. THE COMPLETED SURFACE OF ALL COURSES SHALL BE OF UNIFORM TEXTURE, SMOOTH, UNIFORM AS TO CROWN AND GRADE,
AND FREE FROM DEFECTS OF ALL KINDS. THE COMPLETED SURFACE OF THE WEARING COURSE SHALL NOT VARY MORE THAN 1/8 11. ADEQUATE TRENCH SHEETING AND/OR SHORING SHALL BE PROVIDED BY THE CONTRACTOR AS REQUIRED BY OSHA AND WISHA.
INCH FROM THE LOWER EDGE OF A 10-FOOT STRAIGHTEDGE PLACED ON THE SURFACE PARALLEL TO THE CENTERLINE. THE
TRANSVERSE SLOPE OF THE COMPLETED SURFACE OF THE WEARING COURSE SHALL VARY NOT MORE THAN 1/4 INCH IN 10- FEET 12. TO PREVENT WATER OR DEBRIS FROM DISCHARGING INTO THE CITY'S EXISTING SEWER SYSTEM, THE CONTRACTOR SHALL INSTALL A PLUG IN
FROM THE RATE OF TRANSVERSE SLOPE SHOWN ON THE PLANS. THE CONNECTION MANHOLE OR AS DIRECTED BY THE CITY INSPECTOR. THE PLUG SHALL NOT BE REMOVED UNTIL THE SEWER IS ACCEPTED BY
THE CITY.
16. MATERIALS SAMPLING AND TESTING SHALL BE AT A FREQUENCY AND MAGNITUDE AS SPECIFIED IN THE TECHNICAL
SPECIFICATIONS OR DETERMINED BY THE ENGINEER. A PRIVATE AND INDEPENDENT TESTING LABORATORY SHALL PERFORM 13. ALL SEWER LINES SHALL MAINTAIN A MINIMUM OF 10 FEET HORIZONTAL CLEARANCE AND A MINIMUM OF 18 INCHES VERTICAL CLEARANCE FROM
TESTING AND SAMPLING. CERTIFIED TEST REPORTS SHALL BE FURNISHED FOR ALL TESTS PERFORMED BY PRIVATE TESTING WATER LINES. SEE STANDARDS AND SPECIFICATIONS FOR ADDITIONAL REQUIREMENTS AND ALTERNATIVES.
LABORATORIES. THE CITY WILL BE RESPONSIBLE FOR ACCEPTANCE TESTING. IF TESTS FAIL, RETESTS SHALL BE PAID FOR BY THE
CONTRACTOR. 14. PIPE BEDDING SHALL BE IN ACCORDANCE WITH THE CITY OF ARLINGTON STANDARD AND WSDOT STANDARD SPECIFICATIONS. 3/8-INCH MINUS
MANUFACTURED CLEAN PEA GRAVEL IS THE REQUIRED BEDDING MATERIAL. ALL PIPE SHALL BE LAID ON A PROPERLY PREPARED FOUNDATION.
THIS SHALL INCLUDE NECESSARY LEVELING OF THE TRENCH BOTTOM OR THE TOP OF THE FOUNDATION MATERIALS AS WELL AS PLACEMENT
AND COMPACTION OF REQUIRED BEDDING MATERIAL TO UNIFORM GRADE SO THAT THE ENTIRE LENGTH OF THE PIPE WILL BE SUPPORTED BY A
SUBSURFACE UTILITY LEGEND SURVEY NOTES
UNIFORMLY DENSE UNYIELDING BASE.
15. THE CONTRACTOR SHALL COMPACT TRENCH BACKFILL WITHIN THE CITY RIGHT-OF-WAY TO AT LEAST 90% MAXIMUM DRY DENSITY FROM THE
THE CLASSIFICATIONS FOR SUBSURFACE UTILITIES ARE OUTLINED AND EXPLAINED IN THE FOLLOWING LIST: DATA FOR THIS SURVEY HAS BEEN GATHERED THROUGH FIELD OBSERVATIONS BY METRON AND BOTTOM OF THE TRENCH TO A DEPTH OF 3' BELOW THE SURFACE. THE TRENCH BACKFILL MUST BE COMPACTED TO AT LEAST 95% MAXIMUM
ASSOCIATES AND THE CITY OF ARLINGTON. DENSITY WITHIN 3' OF THE SURFACE. MAXIMUM DENSITY AS DETERMINED BY MODIFIED PROCTOR TEST (ATSM-1557). ASPHALT MUST BE
UTILITY QUALITY LEVEL A. - PRECISE HORIZONTAL AND VERTICAL LOCATION OF UTILITIES OBTAINED BY THE ACTUAL EXPOSURE OF (OR COMPACTED TO MEET THE REQUIREMENTS OF THE CITY OF ARLINGTON. THE INITIAL COMPACTION TEST SHALL BE FUNDED BY THE CITY;
VERIFICATION OF PREVIOUSLY EXPOSED AND SURVEYED UTILITIES) AND SUBSEQUENT MEASUREMENT OF HORIZONTAL DATUM: FURTHER COMPACTION TESTS SHALL BE PAID FOR BY THE CONTRACTOR.
WASHINGTON NORTH ZONE SPC NORTH AMERICAN DATUM 1983/2011 GEODETIC PROJECTION
SUBSURFACE UTILITIES, USUALLY AT A SPECIFIC POINT. UNLESS OTHERWISE NOTED, QUALITY LEVEL A IS
POTHOLE LOCATION
ONLY APPLICABLE AT POTHOLED LOCATIONS ON THE PLANS. AT ALL OTHER AREAS, THE UTILITY SHOULD BE
VERTICAL DATUM:
ASSUMED TO BE QUALITY LEVEL B.
SECTION AND DETAIL REFERENCES
NAVD 88 (MEAN SEA LEVEL)
UTILITY QUALITY LEVEL B. - INFORMATION OBTAINED THROUGH THE APPLICATION OF APPROPRIATE SURFACE GEOPHYSICAL METHODS
UNDERGROUND UTILITY NOTE:
TO DETERMINE THE EXISTENCE AND APPROXIMATE HORIZONTAL POSITION OF SUBSURFACE UTILITIES.
UNDERGROUND UTILITY LOCATIONS FOR SEWER, WATER, ELECTRIC SERVICE, COMMUNICATION THE FOLLOWING CONVENTIONS HAVE BEEN USED WITHIN THESE DRAWINGS TO REFER THE READER BETWEEN THE SECTION/DETAIL AND THE PLAN
SERVICES AND GAS, AS SHOWN HEREON, ARE BASED UPON THE CITY OF ARLINGTON UTILITY FROM WHICH IT IS REFERENCED.
UTILITY QUALITY LEVEL C. - INFORMATION OBTAINED BY SURVEYING AND PLOTTING VISIBLE ABOVE-GROUND UTILITY FEATURES
LOCATES AND "CALL BEFORE YOU DIG" UTILITY LOCATE SERVICE ALL PROVIDED BY CITY OF REFERENCE BUBBLES
ARLINGTON. THE USE OF THIS MAP FOR THE PRECISE LOCATION OF THE UTILITY LINES IS NOT UTILITY QUALITY LEVEL D. - INFORMATION DERIVED FROM EXISTING RECORDS OR ORAL RECOLLECTIONS
WARRANTED OR GUARANTEED. X PLAN REFERENCE BUBBLE - REFERS READER BACK TO THE PLAN FROM WHICH THE DETAIL OR SECTION ORIGINATED.
RCW 19.122 REQUIRES 48 HOUR NOTIFICATION PRIOR TO UNDERGROUND CONSTRUCTION DETAIL/SECTION REFERENCE BUBBLE - REFERS READER TO THE DRAWING ON WHICH THE DETAIL OR SECTION IS LOCATED. NOTE: THE USE OF THE LINE TYPES PROVIDED ABOVE WAS A PRIMARY METHOD FOR INDICATING THE ACCURACY OF THE UTILITIES SHOWN WITHIN
ACTIVITY. CONTACT "CALL BEFORE YOU DIG" UTILITY LOCATE SERVICE AT 811 OR 1-800-424-5555. X
THESE PLANS. WHEN THE SOURCE OF THE INFORMATION WAS UNKNOWN OR THE METHOD FOR LOCATING THE UTILITIES WAS
WHERE, ID = SECTION/DETAIL REFERENCE NUMBER UNAVAILABLE, QUALITY LEVEL D WAS USED AS THE DEFAULT.
## = DRAWING NUMBER ON WHICH DETAIL ORIGINATED OR RESIDES.
| GAYTEWAY B N S F R A PROPERTIES IL R O A D R O W SS01 SS02 SS03 SS04 SS05 SS06 SS07 67TH AVE NE E N 67TH AVE NE & BNSF CUZ T RAILROAD CROSSING S PRECAST H T PLANT 7 9 1 PROJECT ALIGNMENT MAP SITE CONSTRUCTION NOTES 1. CONTRACTOR SHALL PROVIDE BYPASS PUMPS AND PIPING. CITY TO REVIEW AND APPROVE BYPASS PUMPING PLAN AND DEWATERING PLAN PRIOR TO CONSTRUCTION. SEE SPECIFICATIONS FOR DETAILS. 2. CONTRACTOR SHALL PROVIDE TRAFFIC CONTROL PLAN FOR REVIEW AND APPROVAL BY THE CITY PRIOR TO CONSTRUCTION. TRAFFIC CONTROL PLAN SHALL INCLUDE PEDESTRIAN AND BICYCLE TRAFFIC CONTROL FOR CENTENNIAL TRAIL AND SIDEWALKS IF NECESSARY. CENTENNIAL TRAIL SHALL HAVE MIN. 10' PATH IN STREET AND TEMPORARY RAMPS SUITABLE FOR ALL BICYCLE AND WHEEL CHAIR TYPES WHEN SEWER IS BUILT BELOW IT. MAINTAIN 2-WAY TRAFFIC AFTER EACH WORK DAY. 1-WAY TRAFFIC ALLOWED FROM 8:30 AM TO 3:30 PM. 3. CONTRACTOR SHALL POTHOLE CROSSING UTILITIES TO CONFIRM LOCATION AND DEPTH ONE CALENDAR WEEK PRIOR TO EXCAVATION AT THE CROSSING UTILITY LOCATION. REPORT ELEVATIONS AND CONFLICTS TO THE CITY AFTER POTHOLE IS COMPLETE. 4. CONTRACTOR SHALL PROTECT EXISTING UTILITIES TO REMAIN. ANY SERVICE INTERRUPTIONS FOR CROSSING UTILITIES MUST BE APPROVED BY THE ENGINEER PRIOR TO STARTING WORK AND COORDINATED WITH THE APPROPRIATE SERVICE PROVIDER. 5. CONTRACTOR SHALL DETERMINE EXISTING ELEVATIONS OF BOTH ENDS OF EACH PROPOSED PIPE SEGMENT AND CALCULATE THE SLOPE OF THE PROPOSED PIPE SEGMENT WHEN REPLACING IN PLACE. CONTRACTOR SHALL INSTALL PROPOSED PIPE SEGMENTS SO INVERT AT BOTH ENDS MATCHES EXISTING SEWER MAIN INVERT TO MAINTAIN A CONTINUOUS SLOPE IF PLACED IN THE SAME ALIGNMENT AS EXISTING. 6. ALL CONNECTIONS TO MANHOLES SHALL USE KOR-N-SEAL BOOTS UNLESS INSTRUCTED OTHERWISE BY THE CITY. | ||||
|---|---|---|---|---|
| ROTPECRETNI NOTGNILRA REWES FO EVA YTIC HT76 N F O O Y T I C R A | PAM I ESAHP TNEMNGILA - GNIZISPU TCEJORP T G N I L | |||
| 2900-22 :.ON BOJ | GWD.10NEG-D-HT76 SNOISIVER :EMANELIF 4202 ,52 luJ :ETAD TOLP BWD :DEWEIVER | WEIVER | ||
| YB | ||||
| NOITPIRCSED | ||||
| LRA :TNEILC | ||||
| 4202 ,52 luJ :ETAD EVAS | ||||
| ETAD | ||||
| BMB :REENIGNE | ||||
| .ON | ||||
| SCALE:SHOWN 0" 1" 2" DRAWING IS FULL SCALE WHEN BAR MEASURES 2" | ||||
| DWG NO.: G02 | SHEET NO.: 2 12 |
| SITE CONSTRUCTION NOTES | ||
|---|---|---|
| 1. CONTRACTOR SHALL PROVIDE BYPASS PUMPS AND PIPING. CITY TO REVIEW AND APPROVE BYPASS PUMPING PLAN AND DEWATERING PLAN PRIOR TO CONSTRUCTION. SEE SPECIFICATIONS FOR DETAILS. 2. CONTRACTOR SHALL PROVIDE TRAFFIC CONTROL PLAN FOR REVIEW AND APPROVAL BY THE CITY PRIOR TO CONSTRUCTION. TRAFFIC CONTROL PLAN SHALL INCLUDE PEDESTRIAN AND BICYCLE TRAFFIC CONTROL FOR CENTENNIAL TRAIL AND SIDEWALKS IF NECESSARY. CENTENNIAL TRAIL SHALL HAVE MIN. 10' PATH IN STREET AND TEMPORARY RAMPS SUITABLE FOR ALL BICYCLE AND WHEEL CHAIR TYPES WHEN SEWER IS BUILT BELOW IT. MAINTAIN 2-WAY TRAFFIC AFTER EACH WORK DAY. 1-WAY TRAFFIC ALLOWED FROM 8:30 AM TO 3:30 PM. 3. CONTRACTOR SHALL POTHOLE CROSSING UTILITIES TO CONFIRM LOCATION AND DEPTH ONE CALENDAR WEEK PRIOR TO EXCAVATION AT THE CROSSING UTILITY LOCATION. REPORT ELEVATIONS AND CONFLICTS TO THE CITY AFTER POTHOLE IS COMPLETE. 4. CONTRACTOR SHALL PROTECT EXISTING UTILITIES TO REMAIN. ANY SERVICE INTERRUPTIONS FOR CROSSING UTILITIES MUST BE APPROVED BY THE ENGINEER PRIOR TO STARTING WORK AND COORDINATED WITH THE APPROPRIATE SERVICE PROVIDER. 5. CONTRACTOR SHALL DETERMINE EXISTING ELEVATIONS OF BOTH ENDS OF EACH PROPOSED PIPE SEGMENT AND CALCULATE THE SLOPE OF THE PROPOSED PIPE SEGMENT WHEN REPLACING IN PLACE. CONTRACTOR SHALL INSTALL PROPOSED PIPE SEGMENTS SO INVERT AT BOTH ENDS MATCHES EXISTING SEWER MAIN INVERT TO MAINTAIN A CONTINUOUS SLOPE IF PLACED IN THE SAME ALIGNMENT AS EXISTING. 6. ALL CONNECTIONS TO MANHOLES SHALL USE KOR-N-SEAL BOOTS UNLESS INSTRUCTED OTHERWISE BY THE CITY. | ||
|---|---|---|
GAYTEWAY
B
N
S
F
R
A
PROPERTIES IL
R
O
A
D
R
O
W
SS01
SS02
SS03
SS04
SS05
SS06
SS07
67TH
AVE NE
E
N
67TH AVE NE & BNSF
CUZ
T
RAILROAD CROSSING
S
PRECAST
H
T PLANT
7
9
1
2900-22
LRA
4202
,52
luJ
BMB
GWD.10NEG-D-HT76
4202
,52
luJ
BWD
SHOWN
DWG NO.:
G02 2
12
:TNEILC
:ETAD
EVAS
:REENIGNE
:EMANELIF
:ETAD
TOLP
:DEWEIVER
SNOISIVER
WEIVER
YB
NOITPIRCSED
ETAD
SHEET NO.:
:.ON
BOJ
.ON
SCALE:
0" 1" 2"
DRAWING IS FULL SCALE WHEN
BAR MEASURES 2"
PAM
TNEMNGILA
TCEJORP
N
F O
O T
G
Y N
T I
I L
C R
A
NOTGNILRA
FO
YTIC
ROTPECRETNI
REWES
EVA
HT76
I
ESAHP
-
GNIZISPU
PROJECT ALIGNMENT MAP SITE CONSTRUCTION NOTES
1. CONTRACTOR SHALL PROVIDE BYPASS PUMPS AND PIPING. CITY TO REVIEW AND APPROVE BYPASS PUMPING PLAN AND
DEWATERING PLAN PRIOR TO CONSTRUCTION. SEE SPECIFICATIONS FOR DETAILS.
2. CONTRACTOR SHALL PROVIDE TRAFFIC CONTROL PLAN FOR REVIEW AND APPROVAL BY THE CITY PRIOR TO CONSTRUCTION.
TRAFFIC CONTROL PLAN SHALL INCLUDE PEDESTRIAN AND BICYCLE TRAFFIC CONTROL FOR CENTENNIAL TRAIL AND
SIDEWALKS IF NECESSARY. CENTENNIAL TRAIL SHALL HAVE MIN. 10' PATH IN STREET AND TEMPORARY RAMPS SUITABLE FOR
ALL BICYCLE AND WHEEL CHAIR TYPES WHEN SEWER IS BUILT BELOW IT. MAINTAIN 2-WAY TRAFFIC AFTER EACH WORK DAY.
1-WAY TRAFFIC ALLOWED FROM 8:30 AM TO 3:30 PM.
3. CONTRACTOR SHALL POTHOLE CROSSING UTILITIES TO CONFIRM LOCATION AND DEPTH ONE CALENDAR WEEK PRIOR TO
EXCAVATION AT THE CROSSING UTILITY LOCATION. REPORT ELEVATIONS AND CONFLICTS TO THE CITY AFTER POTHOLE IS
COMPLETE.
4. CONTRACTOR SHALL PROTECT EXISTING UTILITIES TO REMAIN. ANY SERVICE INTERRUPTIONS FOR CROSSING UTILITIES MUST
BE APPROVED BY THE ENGINEER PRIOR TO STARTING WORK AND COORDINATED WITH THE APPROPRIATE SERVICE PROVIDER.
5. CONTRACTOR SHALL DETERMINE EXISTING ELEVATIONS OF BOTH ENDS OF EACH PROPOSED PIPE SEGMENT AND CALCULATE
THE SLOPE OF THE PROPOSED PIPE SEGMENT WHEN REPLACING IN PLACE. CONTRACTOR SHALL INSTALL PROPOSED PIPE
SEGMENTS SO INVERT AT BOTH ENDS MATCHES EXISTING SEWER MAIN INVERT TO MAINTAIN A CONTINUOUS SLOPE IF
PLACED IN THE SAME ALIGNMENT AS EXISTING.
6. ALL CONNECTIONS TO MANHOLES SHALL USE KOR-N-SEAL BOOTS UNLESS INSTRUCTED OTHERWISE BY THE CITY.
| TPN 31051400203800 TPN 31051400203700 KEY NOTES 20101 67TH AVE NE 19927 67TH AVE NE 24" PVC PIPE, (GAYTEWAY NORTH) (GAYTEWAY SOUTH) LENGTH AS REQ'D CONNECT TO EXISTING PIPE WITH RIGID TRANSITION COUPLINGS (ROMAC 501 OR EQUAL). CONTRACTOR TO MATCH VERIFY AND MATCH PIPE SIZE AND MATERIAL. REPLACE SIDEWALK, CURB, AND GUTTER TO NEAREST LINE EXPANSION OR CONTRACTION JOINTS PER CITY OF ARLINGTON SSMH #2001 1 DETAILS ON DWG NO. D02. SAWCUT AT EXPANSION JOINTS. N: 432615.83 E: 1321531.52 EXISTING SEWER TO REMAIN IN SERVICE, PROTECT IN PLACE. REPLACE CONCRETE DRIVEWAY TO NEAREST EXPANSION OR -0+10 CONTRACTION JOINTS PER CITY OF ARLINGTON DETAIL ON DWG NO. D02. SAWCUT AT CONTRACTION JOINTS. 0+00 1+00 2+00 3+00 4+00 67TH AVE NE SSMH #2002 E N: 432603.60 SSMH #2003 N L E: 1321515.57 N: 432507.83 P E: 1321512.47 h 12" PVC PIPE, t 0 0 LENGTH AS REQ'D 2 MATCH 0 0 4 LINE 3 0 1 0 1 0 N TPN 31051500103100 TPN 31051500100100 1 5 W 5 O TPN 31051500101700 TPN 31051500100200 0 20006 67TH AVE NE 20104 67TH AVE NE 1 N 3 K UNKNOWN 20020 67TH AVE NE N N P U T PLAN VIEW 140' 140' SSMH #2002 SSMH #2003 SSMH #2001 PROVIDE: (1) - 54" TYPE I MH PROVIDE: (1) - 54" TYPE I MH EXISTING AND FINAL GRADE PROVIDE: (1) - 54" TYPE I MH RE = 126.01' RE = 128.11' OVER TOP OF PIPE, TYP. RE = 125.88' IE (S) = 117.25' IE (S) = 117.65' IE (SW) = 116.08' IE (NE) = 117.15' IE (N) = 117.55' IE (N) = 116.00' IE (SW) = 117.46' 130' 130' KEY PLAN 120' 120' APPROX. 491' OF 24" PVC PIPE @ 0.97% APPROX. 91' OF 24" PVC PIPE @ 0.33% E N L P APPROX. 16' T S OF 24" PVC PIPE @ 6.78% S S 0 1 SS02 SS03 SS04 SS05 SS06 SS07 1 9 1 6 7 T H AVE NE PROVIDE 18" MIN. 67TH AVE NE CLEARANCE AND E 110' 110' N ETHAFOAM PAD S T 67TH AVE NE & BNSF H RAILROAD CROSSING BETWEEN PIPES 7 T 9 1 105' 105' -0+10 0+00 1+00 2+00 3+00 4+00 APPROXIMATE STATION LINE. SEE SEWER SCEEWNTEERR_ALILNIGE NPMROENFITL_E67TH PLAN FOR EXACT LOCATION, TYP. | |||||
|---|---|---|---|---|---|
| ROTPECRETNI NOTGNILRA REWES FO EVA YTIC HT76 N F O O Y T I C R A | I 10SS ESAHP - - NALP GNIZISPU REWES T G N I L | ||||
| 2900-22 :.ON BOJ | GWD.PREWES-D-HT76 SNOISIVER :EMANELIF 4202 ,52 luJ :ETAD TOLP BWD :DEWEIVER | WEIVER | |||
| YB | |||||
| NOITPIRCSED | |||||
| LRA :TNEILC 4 | |||||
| E N L P T S S S 0 1 SS02 SS03 SS04 SS05 SS06 SS07 1 9 1 6 7 T H AVE NE 67TH AVE NE E N T 67TH AVE NE & BNSF S H RAILROAD CROSSING T 7 9 1 | |||||
| 202 ,52 luJ :ETAD EVAS | |||||
| ETAD | |||||
| BMB :REENIGNE | |||||
| .ON | |||||
| SCALE:SHOWN 0" 1" 2" DRAWING IS FULL SCALE WHEN BAR MEASURES 2" | |||||
| DWG NO.: SS01 | SHEET NO.: 3 12 |
| KEY NOTES | ||
|---|---|---|
| CONNECT TO EXISTING PIPE WITH RIGID TRANSITION COUPLINGS (ROMAC 501 OR EQUAL). CONTRACTOR TO VERIFY AND MATCH PIPE SIZE AND MATERIAL. REPLACE SIDEWALK, CURB, AND GUTTER TO NEAREST EXPANSION OR CONTRACTION JOINTS PER CITY OF ARLINGTON DETAILS ON DWG NO. D02. SAWCUT AT EXPANSION JOINTS. EXISTING SEWER TO REMAIN IN SERVICE, PROTECT IN PLACE. REPLACE CONCRETE DRIVEWAY TO NEAREST EXPANSION OR CONTRACTION JOINTS PER CITY OF ARLINGTON DETAIL ON DWG NO. D02. SAWCUT AT CONTRACTION JOINTS. | ||
|---|---|---|
TPN 31051400203800 TPN 31051400203700
20101 67TH AVE NE 19927 67TH AVE NE
(GAYTEWAY NORTH) (GAYTEWAY SOUTH)
67TH AVE NE
E
N
L
P
h
t
0
0
2
0
0
4
3
0
1
0
0 N TPN 31051500103100
TPN 31051500100100 1 5 W
5 O
TPN 31051500101700 TPN 31051500100200 0 20006 67TH AVE NE
20104 67TH AVE NE 1 N
3 K
UNKNOWN 20020 67TH AVE NE N N
P U
T
MATCH
LINE
1
MATCH
LINE
1
24" PVC PIPE,
LENGTH AS REQ'D
CONNECT TO EXISTING PIPE WITH RIGID TRANSITION
COUPLINGS (ROMAC 501 OR EQUAL). CONTRACTOR TO
VERIFY AND MATCH PIPE SIZE AND MATERIAL.
REPLACE SIDEWALK, CURB, AND GUTTER TO NEAREST
EXPANSION OR CONTRACTION JOINTS PER CITY OF ARLINGTON
SSMH #2001
DETAILS ON DWG NO. D02. SAWCUT AT EXPANSION JOINTS.
N: 432615.83
E: 1321531.52
EXISTING SEWER TO REMAIN IN SERVICE, PROTECT IN PLACE.
REPLACE CONCRETE DRIVEWAY TO NEAREST EXPANSION OR
-0+10
CONTRACTION JOINTS PER CITY OF ARLINGTON DETAIL ON DWG
NO. D02. SAWCUT AT CONTRACTION JOINTS.
0+00
1+00 2+00 3+00 4+00
SSMH #2002
N: 432603.60 SSMH #2003
E: 1321515.57 N: 432507.83
E: 1321512.47
12" PVC PIPE,
LENGTH AS REQ'D
140' 140'
SSMH #2002
SSMH #2003
SSMH #2001 PROVIDE: (1) - 54" TYPE I MH PROVIDE: (1) - 54" TYPE I MH EXISTING AND FINAL GRADE
PROVIDE: (1) - 54" TYPE I MH RE = 126.01'
RE = 128.11' OVER TOP OF PIPE, TYP.
RE = 125.88' IE (S) = 117.25'
IE (S) = 117.65'
IE (SW) = 116.08' IE (NE) = 117.15'
IE (N) = 117.55'
IE (N) = 116.00' IE (SW) = 117.46'
130' 130'
120' 120'
APPROX. 491'
OF 24" PVC PIPE @ 0.97%
APPROX. 91'
OF 24" PVC PIPE @ 0.33%
APPROX. 16'
OF 24" PVC PIPE @ 6.78%
PROVIDE 18" MIN.
CLEARANCE AND
110' 110'
ETHAFOAM PAD
BETWEEN PIPES
105' 105'
-0+10 0+00 1+00 2+00 3+00 4+00
SEWER_ALIGNMENT_67TH
2900-22
LRA
4202
,52
luJ
BMB
GWD.PREWES-D-HT76
4202
,52
luJ
BWD
SHOWN
DWG NO.:
SS01 3
12
:TNEILC
:ETAD
EVAS
:REENIGNE
:EMANELIF
:ETAD
TOLP
:DEWEIVER
SNOISIVER
WEIVER
YB
NOITPIRCSED
ETAD
SHEET NO.:
:.ON
BOJ
.ON
SCALE:
0" 1" 2"
DRAWING IS FULL SCALE WHEN
BAR MEASURES 2"
10SS
-
NALP
REWES
PLAN VIEW
N
F O O T
G
Y N
T I
I L
C R
A
KEY PLAN
E
N
L
P
T
S
SS01 SS02 SS03 SS04 SS05 SS06 SS07 1 9 1
67TH AVE NE
E
N
T S
H T 7
9
1
NOTGNILRA
FO
YTIC
ROTPECRETNI
REWES
EVA
HT76
I
ESAHP
-
GNIZISPU
KEY NOTES
67TH AVE NE
67TH AVE NE & BNSF
RAILROAD CROSSING
APPROXIMATE STATION LINE. SEE SEWER CENTERLINE PROFILE
PLAN FOR EXACT LOCATION, TYP.
With Free Trial, you can:
You will have a full access to bids, website, and receive daily bid report via email and web.
Follow Amendment #4 to RFA: DE-FOA-0000001 Active Contract Opportunity Notice ID Related Notice
ENERGY, DEPARTMENT OF
Project ID: CL0-6520 Re-bid Title: Electric Utility Grade Lineman Gloves and Rubber Goods
City of Seattle
Bid Due: 8/06/2026
Project ID: CL0-6520 Re-bid Title: Electric Utility Grade Lineman Gloves and Rubber Goods
City of Seattle
Bid Due: 8/06/2026