Terminal Mitigation of Water Intrusion-PIE-ARPA

Agency: Pinellas County
State: Florida
Type of Government: State & Local
NAICS Category:
  • 236220 - Commercial and Institutional Building Construction
  • 541620 - Environmental Consulting Services
Posted Date: Jan 17, 2025
Due Date: Feb 11, 2025
Solicitation No: 25-0298-ITB-C
Original Source: Please Login to View Page
Contact information: Please Login to View Page
Bid Documents: Please Login to View Page


Project ID: 25-0298-ITB-C

Title: Terminal Mitigation of Water Intrusion-PIE-ARPA

Addenda: 0

Release Date: 1/17/2025

Due Date: 2/11/2025

Post Information
Posted At:Fri, Jan 17, 2025 10:36 AMSealed Bid Process:Yes (Bids Sealed / Pricing Sealed)Private Bid:No
Overview
Summary

The St. Pete-Clearwater International Airport terminal building has several issues with moisture and water intrusion at the main entry, roof parapets, entry doors as well as a deteriorating soffit in the back of the terminal. Work includes but is not limited to the following:

Terminal Lobby: Replacement of the main lobby skylight and windows, full weatherproofing of these window systems and related roof waterproofing; replacement and upgrade of the lobby interior and exterior lighting; demolition and new installation of the lobby interior finishes; Roof Parapets: Refurbishment of the stucco parapet wall, sealing cracks and re-painting this wall with a breathable weather-proofing paints system; Automatic Entry Doors: Replacement of the automatic door seals and weatherstripping, especially at the door sill; Soffit: Soffit replacement at the FIS exterior walkway.

Background

The St. Pete-Clearwater International Airport terminal building has several issues with moisture and water intrusion at the main entry, roof parapets, entry doors as well soffits in the back of the terminal. At the main entry there are roof leaks, skylight and window leaks as well as damage and deterioration to the entry walls and finishes, all requiring replacement. Along the parapet of the terminal building, there are minor cracks requiring repair and sealing. At the automatic entry doors along the terminal building there leaks due to wind driven rain requiring weatherproofing. And a deteriorating exterior soffit requiring full replacement.

Timeline
Issue Date:
January 17, 2025
Site Visit & Pre-Conference Information (Non-Mandatory):
January 28, 2025, 1:00pm
14700 Terminal Blvd., 2nd Floor Conference Room, Clearwater, FL 33762
Question Submission Deadline:
February 4, 2025, 3:00pm
Step 1 Bid Submission Deadline:
February 11, 2025, 3:00pm
Step 2 Bid Submission Deadline:
March 6, 2025, 3:00pm
* Disclaimer: This website provides information about bids, requests for proposals (RFPs), or requests for qualifications (RFQs) for convenience only and does not serve as an official public notice. Individuals who wish to respond to or inquire about bids, RFPs, or RFQs should contact the relevant government department directly.

Sign-up for a Free Trial, Government Bid Alerts

With Free Trial, you can:

You will have a full access to bids, website, and receive daily bid report via email and web.

Try One Week FREE Now

See Also

Description: CJC, Building F - Boiler Replacement Department: Facilities Dev & Ops Buyer:

Palm Beach County

Bid Due: 10/16/2030

Description: Torry Island Swing Bridge Repairs Department: Engineering & Public Works Buyer: Holly

Palm Beach County

Bid Due: 1/31/2030

Description: PBSO Corrections - Glass Wall Removal / Door Installation Department: Facilities Dev

Palm Beach County

Bid Due: 2/03/2030

Description: PBSO Corrections - Glass Wall Removal / Door Installation Department: Facilities Dev

Palm Beach County

Bid Due: 2/03/2030