| Agency: | State Government of North Carolina |
|---|---|
| State: | North Carolina |
| Type of Government: | State & Local |
| NAICS Category: |
|
| Posted Date: | May 14, 2026 |
| Due Date: | Jun 2, 2026 |
| Solicitation No: | 75-06022026 |
| Original Source: | Please Login to View Page |
| Contact information: | Please Login to View Page |
| Bid Documents: | Please Login to View Page |
| Solicitation Number: | 75-06022026 |
| Project Title: | Technology Infrastructure Replacement Project SCO#28434 |
| Description: | The Project consists of two integrated work elements: Campus Conduit Infrastructure: Design of a diverse underground conduit pathway system providing a minimum of 2 separate and independent connectivity paths to each building on the Carrington-Scott Campus at 1247 Jimmie Kerr Road, Graham, NC, linking all campus buildings to a central distribution point(s). Work includes, but is not limited to, directional boring, trenching, conduit installation, pull boxes, handholes, and restoration of all disturbed surfaces. Fiber Optic Network: Design of a redundant 24-strand single-mode fiber optic (SMF) network operating over the newly installed conduit system, with all strands terminated, tested and connected to both of the College’s on-campus data centers (Located in T Bldg and Main Bldg). The network architecture shall provide fully redundant pathways to eliminate single points of failure. |
| Opening Date: | 6/2/2026 3:00 PM |
| Posted Date: | 5/14/2026 |
| Status: | Open |
| Department: | ALAMANCE COMMUNITY COLLEGE |
|
Solicitation Number
*
75-06022026
|
Department
ALAMANCE COMMUNITY COLLEGE
|
Status Reason
Open
|
|
|
Opening Date
2026-06-02T15:00:00.0000000
|
Posted Date
*
2026-05-14T14:16:18.0000000Z
|
Primary Commodity Code
Design Services
|
|
|
Mandatory Conference/Site Visit
—
—
|
Special Instructions
—
|
Solicitation Type
*
Select RFP IFB RFI
|
|
|
Owner
Thomas Hartman
|
|||
|
Description
The Project consists of two integrated work elements: Campus Conduit Infrastructure: Design of a diverse underground conduit pathway system providing a minimum of 2 separate and independent connectivity paths to each building on the Carrington-Scott Campus at 1247 Jimmie Kerr Road, Graham, NC, linking all campus buildings to a central distribution point(s). Work includes, but is not limited to, directional boring, trenching, conduit installation, pull boxes, handholes, and restoration of all disturbed surfaces. Fiber Optic Network: Design of a redundant 24-strand single-mode fiber optic (SMF) network operating over the newly installed conduit system, with all strands terminated, tested and connected to both of the College’s on-campus data centers (Located in T Bldg and Main Bldg). The network architecture shall provide fully redundant pathways to eliminate single points of failure.
|
|||
With Free Trial, you can:
You will have a full access to bids, website, and receive daily bid report via email and web.
D3POC0253_DIVISION WIDE ON CALL EROSION CONTROL SBE SBE D3POC0253_DIVISION WIDE ON CALL EROSION
Division of Highways
Bid Due: 6/04/2026
Bid Number Title Due Date Other Files Tab Sheet 26-33 RFB for Sanitary
Greenville Utilities
Bid Due: 6/11/2026
Follow Z--Provide Maintenance of Roadway - Roadway Stripping Active Contract Opportunity Notice ID
INTERIOR, DEPARTMENT OF THE
Bid Due: 6/06/2026
Bid Number: 26B0818 Bid Title: RWTP Raw Water Well Upgrade of Fiberglass Buildings
Cape Fear Public Utility Authority
Bid Due: 6/26/2026