| Agency: | Rhode Island Department of Transportation |
|---|---|
| State: | Rhode Island |
| Type of Government: | State & Local |
| NAICS Category: |
|
| Posted Date: | Sep 1, 2025 |
| Due Date: | Sep 23, 2025 |
| Original Source: | Please Login to View Page |
| Contact information: | Please Login to View Page |
| Bid Documents: | Please Login to View Page |
The project area is a 1-mile-long corridor of Main Street (Route 114), from the Bristol Town line to the intersection of Main Street and Wheaton Street. The work includes mill & overlay resurfacing of the roadway pavement; replacement of existing sidewalks, driveway aprons and wheelchair ramps on both sides of the roadway; curb replacement and resetting, signal replacement at the Campbell street intersection; signing and striping improvements to enhance vehicular and pedestrian safety; and removal of existing trees (selected by arborist) and planting of new street trees. A significant portion of the existing drainage system within existing sidewalk areas will also be replaced and relocated within the roadway shoulder, along with the addition of new water quality treatment structures.
Start Date: Aug 29, 2025
End Date: Sep 23, 2025
Dept of Transportation
With Free Trial, you can:
You will have a full access to bids, website, and receive daily bid report via email and web.
Info Opening Time Solicitation Number Status Bid Title Posting Group Posting Entity Contact
State Government of Rhode Island
Bid Due: 8/27/2026
26-023 Oak Hill Park Tennis Courts and Playground Renovations
City of Pawtucket
Bid Due: 8/27/2026
Home >> RFPs >> Construction >> Crescent Park Shoreline Protection & Sabin Point
City of East Providence
Bid Due: 9/02/2026
TCB26006443 |Pavement Improvements - Putnam Pike This project, Rhode Island Contract No. 2026-CH-034,
Rhode Island Department of Transportation
Bid Due: 8/14/2026