| Agency: | State Government of Utah |
|---|---|
| State: | Utah |
| Type of Government: | State & Local |
| NAICS Category: |
|
| Posted Date: | Mar 15, 2026 |
| Due Date: | Apr 10, 2026 |
| Solicitation No: | 513800052 |
| Original Source: | Please Login to View Page |
| Contact information: | Please Login to View Page |
| Bid Documents: | Please Login to View Page |
Project Description: The estimated construction cost for the Project is approximately $2.5 million. The WORK will include the following:
• Improvements in the existing Tanner Turnout Vault including two new 18-inch high-performance butterfly valves, a new flow meter, vault ventilation, electrical and telemetry.
• Installation of new BCC Isolation Vault to include a 72-inch high-performance butterfly valve, two new access manways, two air-vacuum valves, and an 8-inch ductile iron drainpipe with a discharge structure.
• Replacement of approximately 100 feet of 72-inch PCCP pipeline with ¾-inch thick welded steel pipe along Wasatch Blvd.
With Free Trial, you can:
You will have a full access to bids, website, and receive daily bid report via email and web.
Project: DFCM Construction - Prequalified General Stage II - Department of Natural Resources/DWR
State Government of Utah
Bid Due: 6/23/2026
Follow Hill Air Force Base Simplified Acquisition of Base Engineering Requirements V Active
DEPT OF DEFENSE
Bid Due: 6/17/2026
Project: Wasatch Peaks Ranch Road & Fire District- Road Striping Ref. #: RA26-136
State Government of Utah
Bid Due: 6/15/2026
Project: DFCM Construction - Prequalified General Stage II - Department of Health and
State Government of Utah
Bid Due: 6/16/2026