Tanner Reservoir Valve Replacement
| Agency: | State Government of Utah |
|---|---|
| State: | Utah |
| Type of Government: | State & Local |
| NAICS Category: |
|
| Posted Date: | Mar 15, 2026 |
| Due Date: | Apr 10, 2026 |
| Solicitation No: | 513800052 |
| Original Source: | Please Login to View Page |
| Contact information: | Please Login to View Page |
| Bid Documents: | Please Login to View Page |
Description
Project Description: The estimated construction cost for the Project is approximately $2.5 million. The WORK will include the following:
• Improvements in the existing Tanner Turnout Vault including two new 18-inch high-performance butterfly valves, a new flow meter, vault ventilation, electrical and telemetry.
• Installation of new BCC Isolation Vault to include a 72-inch high-performance butterfly valve, two new access manways, two air-vacuum valves, and an 8-inch ductile iron drainpipe with a discharge structure.
• Replacement of approximately 100 feet of 72-inch PCCP pipeline with ¾-inch thick welded steel pipe along Wasatch Blvd.
See Also
Project: Updates for the Fire, Parks, Police, Sewer, Stormwater, and Water Impact Fees
State Government of Utah
Due by 11/19/2026
Project: Farm Creek Irrigation Company- Farm Creek Canal Rehabilitation Ref. #: RA27-137 Department:
State Government of Utah
Due by 11/20/2026
Follow Ross Springs Waterline Replacement Active Contract Opportunity Notice ID 1240LT27Q0022 Related Notice
AGRICULTURE, DEPARTMENT OF
Due by 12/01/2026
Project: RDW26076 - STREETS ADA RAMP REPLACEMENT 2027 Ref. #: RDW26076 Department: CITIES
State Government of Utah
Due by 11/18/2026