| Agency: | State Government of Utah |
|---|---|
| State: | Utah |
| Type of Government: | State & Local |
| NAICS Category: |
|
| Posted Date: | Mar 15, 2026 |
| Due Date: | Apr 10, 2026 |
| Solicitation No: | 513800052 |
| Original Source: | Please Login to View Page |
| Contact information: | Please Login to View Page |
| Bid Documents: | Please Login to View Page |
Project Description: The estimated construction cost for the Project is approximately $2.5 million. The WORK will include the following:
• Improvements in the existing Tanner Turnout Vault including two new 18-inch high-performance butterfly valves, a new flow meter, vault ventilation, electrical and telemetry.
• Installation of new BCC Isolation Vault to include a 72-inch high-performance butterfly valve, two new access manways, two air-vacuum valves, and an 8-inch ductile iron drainpipe with a discharge structure.
• Replacement of approximately 100 feet of 72-inch PCCP pipeline with ¾-inch thick welded steel pipe along Wasatch Blvd.
With Free Trial, you can:
You will have a full access to bids, website, and receive daily bid report via email and web.
Project: Marriott-Slaterville City-2026 Secondary Water Meter Project Ref. #: RA27-9 Department: Division of
State Government of Utah
Bid Due: 8/11/2026
Follow CDC ARSR HVAC Replacement Active Contract Opportunity Notice ID 697DCK-26-R-00330 Related Notice
TRANSPORTATION, DEPARTMENT OF
Bid Due: 8/13/2026
Project: SLCo FAC133199 Sheriff's Special Operations Building Re-Roof - CONST Ref. #: SLCo
State Government of Utah
Bid Due: 8/26/2026
Project: DFCM Construction - VBS Design Build - DNR/DWR - Logan Fish Hatchery
State Government of Utah
Bid Due: 8/26/2026