15--TANK,FUEL,AIRCRAFT

Agency: DEPT OF DEFENSE
State: Federal
Type of Government: Federal
FSC Category:
  • 15 - Aircraft and Airframe Structural Components
NAICS Category:
  • 336413 - Other Aircraft Parts and Auxiliary Equipment Manufacturing
Posted Date: Mar 22, 2024
Due Date: Apr 22, 2024
Solicitation No: N0038324QP179
Bid Source: Please Login to View Page
Contact information: Please Login to View Page
Bid Documents: Please Login to View Page
Follow
15--TANK,FUEL,AIRCRAFT
Active
Contract Opportunity
Notice ID
N0038324QP179
Related Notice
Department/Ind. Agency
DEPT OF DEFENSE
Sub-tier
DEPT OF THE NAVY
Major Command
NAVSUP
Sub Command
NAVSUP WEAPON SYSTEMS SUPPORT
Sub Command 2
NAVSUP WSS PHILADELPHIA
Office
NAVSUP WEAPON SYSTEMS SUPPORT
Looking for contract opportunity help?

APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.

APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.

The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).

General Information
  • Contract Opportunity Type: Solicitation (Original)
  • All Dates/Times are: (UTC-04:00) EASTERN STANDARD TIME, NEW YORK, USA
  • Original Published Date: Mar 22, 2024 06:49 am EDT
  • Original Date Offers Due: Apr 22, 2024 04:30 pm EDT
  • Inactive Policy: 15 days after date offers due
  • Original Inactive Date: May 07, 2024
  • Initiative:
    • None
Classification
  • Original Set Aside:
  • Product Service Code: 1560 - AIRFRAME STRUCTURAL COMPONENTS
  • NAICS Code:
    • 336413 - Other Aircraft Parts and Auxiliary Equipment Manufacturing
  • Place of Performance:
Description
CONTACT INFORMATION|4|N762.43|AGH|215-697-1396|Andrew.N.Phillips10.civ@us.navy.mil|
ITEM UNIQUE IDENTIFICATION AND VALUATION (JAN 2023)|19||||||||||||||||||||
HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT|8|X||||||||
INSPECTION AND ACCEPTANCE OF SUPPLIES|26|X||||||||||||X||||||||||||||
FMS DELIVERY AND SHIPPING INSTRUCTIONS|3|||PPW12XKP|
WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)|16|INVOICE AND RECEIVING REPORT COMBO TYPE||TBD|N00383|TBD|TBD|See Schedule|TBD|||TBD||||||
NAVY USE OF ABILITYONE SUPPORT CONTRACTOR - RELEASE OF OFFEROR INFORMATION (3-18))|1||
EQUAL OPPORTUNITY (SEP 2016)|2|||
WARRANTY OF SUPPLIES OF A NONCOMPLEX NATURE (JUN 2003)|6|12 MONTHS|60 days after discovery of defect|||||
EQUAL OPPORTUITY FOR WORKERS WITH DISABILITIES (JUN 2020)|2|||
BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM - BASIC (FEB 2024))|11||||||||||||
ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (NOV 2023)|13||||||||||||||
BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024))|5||||||
BUY AMERICAN--BALANCE OF PAYMENTS PROGRAM (FEB 2024)|1||
ROYALTY INFORMATION (APR 1984)|1||
ANNUAL REPRESENTATIONS AND CERTIFICATIONS (FEB 2024)|13|336413|1250||||||||||||
FACSIMILE PROPOSALS (OCT 1997)|1||
NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PREPAREDNESS, ANDENERGY PROGRAM USE (APR 2008))|2||X|
ALL CONTRACTUAL DOCUMENTS (I.E. CONTRACTS, PURCHASE ORDERS, TASK ORDERSDELIVERY ORDERS AND MODIFICATIONS) RELATED TO THE INSTANT PROCUREMENT ARE CONSIDERED TO BE "ISSUED" BY THE GOVERNMENT WHEN COPIES ARE EITHER DEPOSITED IN THE MAIL, TRANSMITTED BY FACSIMILE, OR
SENT BY OTHER ELECTRONIC COMMERCE METHODS, SUCH AS EMAIL. THE GOVERNMENT'S ACCEPTANCE OF THE CONTRACTOR'S PROPOSAL CONSTITUTES BILATERAL AGREEMENT TO "ISSUE" CONTRACTUAL DOCUMENTS AS DETAILED HEREIN.
Early and incremental deliveries accepted and preferred.
1. SCOPE
1.1 Articles to be furnished hereunder shall be manufactured, tested and inspected in accordance with ;62005 IAW CURRENT REVISION; drawing number ( ;62005 IAW CURRENT REVISION; ) ;62005 IAW CURRENT REVISION; , Revision ;62005 IAW CURRENT REVISION; and all
details and specifications referenced therein.
1.2 Unless expressly provided for elsewhere in this clause, equipment such as fixtures, jigs, dies, patterns, mylars, special tooling, test equipment, or any other manufacturing aid required for the manufacture and/or testing of the subject item(s) will not be
provided by the Government or any other source and is the sole responsibility of the contractor. The foregoing applies notwithstanding any reference to such equipment or the furnishing thereof that may be contained in any drawing or referenced specification.
1.3 If MIL-STD-454 is referenced in the drawings or in the specification, the contractor is expected to show compliance with IPC/EIAJ-STD-001C.
2. APPLICABLE DOCUMENTS
ALL INSPECTIONS AND ACCEPTANCE IAW MIL-STD-801D.
3. REQUIREMENTS - NOT APPLICABLE
4. QUALITY ASSURANCE
I. First Article Test (FAT) Requirements.The following requirements applyto AMFUEL tank five.The tests to be performed under the FAT approval clauseof the contract are:Conduct all testing required by AMFUEL Report 2122 Rev M:F-18 Acceptance Test Procedure
(ATP) non-self-sealing fuelcells with the exceptions.A Vacuum Bag Method Phenolphthalein Test shall be conducted on the fuel cell once all ATP testing has successfully been completed.
II. Samples. The contractor shall present one (1) unit(s) of lot/item 0001 as specified in this contract.At least 45 days before First Article Testing, the contractor shall notify the PCO, in writing, so that the Navy may witness the testing. III. Testing
Location and Estimated Lead-Time. No arrangements will be made for inspection of the sample(s) until the DCMA notifies the PCO that the contractor has inspected the sample and is 100% ready for inspectio by the Government team.The DCMA-QAR shall be present
during the inspection team's visit to the manufacturing site to perform the FAT.IV. Test Report. The contractor shall prepare a FAT Report, which shall be in accordance with the requirements of ISO-9012 (Aerospace First Article Inspection Requirement),
MIL-HDBK-831 or equivalent, and shall be submitted via the cognizant DCMA Contract Administration Office to the PCO.
Disposition of First Article Test Sample(s).A. Sample(s) may be considered as production items under the contract provided the sample(s) can be refurbished to Ready for Issue (RFI) condition and provide the sample(s) have inspection approval of the cognizant
QAR. Sample(s) may be shipped as production items only after all other units required under the contract have been produced and are ready for shipment.B.The QAR shall provide comments on Form DD1222 which shall be forwarded with the FAT Report. The cognizant
government inspecting activity shall issue a report accepting or rejecting the FAT sample(s). Final approval of the FAT Report is the responsibility of the PCO. Upon notification of approval/conditional approval the QAR shall provide disposition in the
Wide-Area(WAWF) system or Form DD250 to indicate Government acceptance of the test report.
The first article test (FAT) shall be performed at the contractor's facility. All testing shall be performed at the AMFUEL's facility located at 601 firestone Drive, Magnolia AR. The cognizant DCMA shall witness or verify the first article test (FAT),
performed at the contractor's facility. At least 45 days before FAT the contractor shall notify the PCO in writing so that the Navymay witness the testing. The first article inspection shall be witnessed at the contractor's facility by NAVAIR Engineering
Technical Authority(ETA), NAVSUP WSS Phila N23 Engineering and N23 Product Support Personnel.
5. PACKAGING- MIL-STD 2073 PACKAGING APPLIES AS FOUND ELSEWHERE IN THE SCHEDULE
6. NOTES - NOT APPLICABLE

DATE OF FIRST SUBMISSION=ASREQ
UPON COMPLETION OF THE FIRST ARTICLE TEST.
Attachments/Links
Contact Information
Contracting Office Address
  • PHILADELPHIA 700 ROBBINS AVENUE
  • PHILADELPHIA , PA 19111-5098
  • USA
Primary Point of Contact
Secondary Point of Contact


History
  • Mar 22, 2024 06:49 am EDTSolicitation (Original)

Sign-up for a Free Trial, Government Bid Alerts

With Free Trial, you can:

You will have a full access to bids, website, and receive daily bid report via email and web.

Try One Week FREE Now

See Also

Follow FD2030-23-01138-02 Active Contract Opportunity Notice ID FD2030-23-01138-02 Related Notice Department/Ind. Agency DEPT

Federal Agency

Bid Due: 11/09/2024

Follow 15--SUPPORT,STRUCTURAL Active Contract Opportunity Notice ID SPE4A724U0449 Related Notice Department/Ind. Agency DEPT

DEPT OF DEFENSE

Bid Due: 5/06/2024

Follow 15--TRUSS ASSEMBLY,AIRC Active Contract Opportunity Notice ID SPE4A724U0457 Related Notice Department/Ind. Agency

DEPT OF DEFENSE

Bid Due: 5/06/2024

Follow 15--HOOK,ARRESTING,AIRC Active Contract Opportunity Notice ID N0038324QB149 Related Notice Department/Ind. Agency DEPT

DEPT OF DEFENSE

Bid Due: 5/06/2024